Skip to content

chore: integrate issues and fix up checks #1615

chore: integrate issues and fix up checks

chore: integrate issues and fix up checks #1615

Triggered via pull request November 28, 2025 08:46
Status Failure
Total duration 6h 0m 27s
Artifacts

run-tests.yml

on: pull_request
Matrix: run-tests
[Required] Tests passed
3s
[Required] Tests passed
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Tests on ubuntu-latest with node 24
Process completed with exit code 1.
Tests on ubuntu-latest with node 22
Process completed with exit code 1.
Tests on ubuntu-latest with node 23
Process completed with exit code 1.
Tests on macos-latest with node 24
Process completed with exit code 1.
Tests on macos-latest with node 22
Process completed with exit code 1.
Tests on windows-latest with node 22
Process completed with exit code 1.
Tests on windows-latest with node 24
Process completed with exit code 1.
Tests on windows-latest with node 23
Process completed with exit code 1.
Tests on macos-latest with node 23
The job has exceeded the maximum execution time of 6h0m0s
Tests on macos-latest with node 23
The operation was canceled.
[Required] Tests passed
Process completed with exit code 1.