Skip to content

chore(deps-dev): bump the bundled group with 2 updates (#641) #1662

chore(deps-dev): bump the bundled group with 2 updates (#641)

chore(deps-dev): bump the bundled group with 2 updates (#641) #1662

Triggered via push December 3, 2025 09:05
Status Cancelled
Total duration 6h 0m 28s
Artifacts

run-tests.yml

on: push
Matrix: run-tests
[Required] Tests passed
4s
[Required] Tests passed
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Tests on ubuntu-latest with node 23
The job has exceeded the maximum execution time of 6h0m0s
Tests on ubuntu-latest with node 23
The operation was canceled.
[Required] Tests passed
Process completed with exit code 1.