Skip to content

chore(deps): update Diffractor requirement from =0.2.6 to =0.2.6, 0.2 in /DifferentiationInterface in the all-julia-packages group across 1 directory #2404

chore(deps): update Diffractor requirement from =0.2.6 to =0.2.6, 0.2 in /DifferentiationInterface in the all-julia-packages group across 1 directory

chore(deps): update Diffractor requirement from =0.2.6 to =0.2.6, 0.2 in /DifferentiationInterface in the all-julia-packages group across 1 directory #2404

Triggered via pull request November 21, 2025 08:36
Status Failure
Total duration 3h 29m 24s
Artifacts

Test.yml

on: pull_request
Matrix: test-DI-Backend
Matrix: test-DI-Core
Matrix: test-DIT
Fit to window
Zoom out
Zoom in

Annotations

14 errors
1.10 - DIT (Zero)
Process completed with exit code 1.
1.11 - DIT (Formalities)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.12 - DIT (Zero)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.11 - DIT (Weird)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.12 - DIT (Weird)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.10 - DIT (Standard)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.12 - DIT (Formalities)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.12 - DIT (Standard)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.11 - DIT (Zero)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.11 - DIT (Zero)
The operation was canceled.
1.10 - DIT (Weird)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.10 - DIT (Weird)
The operation was canceled.
1.11 - DIT (Standard)
The strategy configuration was canceled because "test-DIT._1_10_Zero_false_false" failed
1.11 - DIT (Standard)
The operation was canceled.