Skip to content

chore(deps): bump actions/checkout from 5 to 6 (#934) #2411

chore(deps): bump actions/checkout from 5 to 6 (#934)

chore(deps): bump actions/checkout from 5 to 6 (#934) #2411

Triggered via push November 21, 2025 17:12
Status Failure
Total duration 1h 15m 37s
Artifacts

Test.yml

on: push
Matrix: test-DI-Backend
Matrix: test-DI-Core
Matrix: test-DIT
Fit to window
Zoom out
Zoom in

Annotations

9 errors
1.10 - DI Back (Enzyme)
Process completed with exit code 134.
1.11 - DI Back (Enzyme)
The strategy configuration was canceled because "test-DI-Backend._1_10_Enzyme" failed
1.11 - DI Back (Enzyme)
The operation was canceled.
1.11 - DI Back (PolyesterForwardDiff)
The strategy configuration was canceled because "test-DI-Backend._1_10_Enzyme" failed
1.11 - DI Back (PolyesterForwardDiff)
The operation was canceled.
1.11 - DI Back (FastDifferentiation)
The strategy configuration was canceled because "test-DI-Backend._1_10_Enzyme" failed
1.11 - DI Back (FastDifferentiation)
The operation was canceled.
1.11 - DI Back (ForwardDiff)
The strategy configuration was canceled because "test-DI-Backend._1_10_Enzyme" failed
1.11 - DI Back (ForwardDiff)
The operation was canceled.