drop 5.8 #28
testsuite.yml
on: push
Annotations
33 errors and 12 warnings
|
linux 5.18
Docker pull failed with exit code 1
|
|
linux 5.16
Docker pull failed with exit code 1
|
|
linux 5.20
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.20
Docker pull failed with exit code 1
|
|
linux 5.12
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.12
Docker pull failed with exit code 1
|
|
linux 5.36
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.36
The operation was canceled.
|
|
linux 5.30
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.30
The operation was canceled.
|
|
linux 5.28
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.28
The operation was canceled.
|
|
linux 5.14
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.14
Docker pull failed with exit code 1
|
|
linux 5.42
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.42
The operation was canceled.
|
|
linux 5.26
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.22
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.22
The operation was canceled.
|
|
linux 5.40
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.40
The operation was canceled.
|
|
linux 5.32
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.32
The operation was canceled.
|
|
linux 5.38
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.38
The operation was canceled.
|
|
linux latest
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux latest
The operation was canceled.
|
|
linux 5.24
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.24
The operation was canceled.
|
|
linux 5.34
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.34
The operation was canceled.
|
|
linux 5.10
The strategy configuration was canceled because "linux._5_18" failed
|
|
linux 5.10
The operation was canceled.
|
|
linux 5.18
Docker pull failed with exit code 1, back off 1.251 seconds before retry.
|
|
linux 5.18
Docker pull failed with exit code 1, back off 6.526 seconds before retry.
|
|
linux 5.16
Docker pull failed with exit code 1, back off 2.63 seconds before retry.
|
|
linux 5.16
Docker pull failed with exit code 1, back off 9.588 seconds before retry.
|
|
linux 5.20
Docker pull failed with exit code 1, back off 5.181 seconds before retry.
|
|
linux 5.20
Docker pull failed with exit code 1, back off 7.331 seconds before retry.
|
|
linux 5.12
Docker pull failed with exit code 1, back off 2.495 seconds before retry.
|
|
linux 5.12
Docker pull failed with exit code 1, back off 7.72 seconds before retry.
|
|
linux 5.14
Docker pull failed with exit code 1, back off 3.449 seconds before retry.
|
|
linux 5.14
Docker pull failed with exit code 1, back off 8.562 seconds before retry.
|
|
linux 5.10
Docker pull failed with exit code 1, back off 7.36 seconds before retry.
|
|
linux 5.10
Docker pull failed with exit code 1, back off 8.173 seconds before retry.
|