Skip to content

chore: prepare v1.0.0-beta.6 - #216

Merged
ZingerLittleBee merged 2 commits into
mainfrom
release/beta6-validation
Oct 6, 2026
Merged

ZingerLittleBee merged 2 commits into
mainfrom
release/beta6-validation

Conversation

@ZingerLittleBee

@ZingerLittleBee ZingerLittleBee commented Oct 6, 2026 •

Copy link
Copy Markdown
Owner

Prepare v1.0.0-beta.6 from the dated CHANGELOG section on fixed candidate b892c1d876110e4df275e2b1e5520263d4e11d5e, based on #215 at f9cbb8e3d4a09eb6cd9c9d2e73c5b404ab65c532. The complete renewal feature for #208 was implemented and merged in #214. This preparation updates regenerated locks, package and OpenAPI metadata, the installer version, documentation and Railway template version references.

Standards and Spec reviews report zero outstanding findings. The documentation version contract was fixed without changing its assertions. Compiled Rust, Web, native and installer sources and the four release inputs are byte-identical to predecessor 4fed3705959513c5e8ac21bcc7c76b291faa2b6f. The predecessor and candidate have different Git trees; the independently audited disposable-host lifecycle matrix passed all 17 cases on the predecessor's exact runtime inputs.

All 14 expected current-head PR jobs succeeded: nine CI jobs, two CI iOS jobs, Documentation, CI Push Relay worker and Commit Attribution. Actual PR checkout 0beb379d48972330401a0329cff3333f07e2dcbb and candidate head share tree 11ef6542ee287c76b4591d3e2298d0f69f339932. A stale event merge hint in archived iOS metadata is not used as source provenance.

Executed validation: Rust 3,564 tests across core targets and all 47 integration targets, including 52 renewal integration cases; Web 889; widget SDK 53; Push Relay 74; Documentation 11 Chromium tests plus contracts; hosted macOS native 473 and real Simulator UI 3, with zero native/UI failures or skips. Five fixture saves across three UI scenarios and all 14 screenshot attachments were retained. The complete UI archive was hashed independently, and its bounded evidence transfer was revalidated against 186 file hashes with strict repository validators and key screenshot inspection.

The additional local Rust gate is complete: the environment-interrupted workspace run supplied 3,033 completed passes, and its remaining 20 integration targets exited zero with 531 passes. Together these cover 2,622 core and 942 integration tests across all 47 targets, with zero failures and one pre-existing privileged Agent ignore. Document tests also exited zero with zero discovered cases. Partial results from the interrupted target are excluded, and the interrupted full command is not reported as an exit-zero run. Existing workspace formatting differences remain baseline-only.

Publication still requires owner-controlled integration at the expected head, all 13 expected main-push jobs, a freshly checked official make publish dry run, and terminal Release workflow plus public binary, checksum, architecture and distribution verification. No Beta.6 tag or release has been pushed.

The existing Railway demo remains Beta.5. Before main can trigger a wrapper build, only its existing non-secret image selector will be held at the verified immutable Beta.5 digest with automatic redeployment skipped. Actual Beta.6 upgrade requires public immutable artifacts and a fresh consistent backup with isolated database restore evidence. The separately authorized backup session keeps production data private; service-level recovery and lossless rollback after new writes remain unverified. Production billing and real notification channels are untouched.

@vercel

vercel Bot commented Oct 6, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
serverbee-docs Ready Ready Preview Oct 6, 2026 3:25am UTC

@ZingerLittleBee
ZingerLittleBee marked this pull request as ready for review October 6, 2026 04:29
@ZingerLittleBee
ZingerLittleBee merged commit b892c1d into main Oct 6, 2026
20 checks passed
@ZingerLittleBee
ZingerLittleBee deleted the release/beta6-validation branch October 6, 2026 04:30
@railway-app
railway-app Bot temporarily deployed to ServerBee Server / production October 6, 2026 04:30 Inactive

This branch was successfully deployed

2 active and 1 inactive deployments
Production — b892c1d8 Deployed Oct 6, 2026 by vercel[bot]
ServerBee Server / production — b892c1d8 Deployed Oct 6, 2026 by railway-app[bot]
Preview — b892c1d8 Deployed Oct 6, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant