Kanban flow metrics for as many delivery teams as you like, from nothing but a list of completed and started dates. Single page, no build step, nothing to install.
Scrum teams too: nothing here asks how you plan, and a team that runs sprints can group every period on its real sprint boundaries rather than on a fortnight counted from a fixed date. Mixed estates are the expected case — say once what a sprint is here, then tick the teams that run them.
Live: https://eagleadams86.github.io/team-dashboard/
Download: the app as one file — double-click it and it runs, with no server, no install and no internet. What differs from the website.
The app is called Flow Metrics on screen. The repo, the Pages path and the
app: 'team-dashboard' marker inside a backup file all still say team-dashboard — renaming
any of those would break existing links and backups, so the rename is deliberately a
display-only one.
There are three ways to read the numbers: the Dashboard, which is one team in detail, All Teams, which is every team side by side over one shared window, and the Scorecard, which is the whole train in four figures with last window's beside them. The first two are driven by the same work type filter, date window and grouping; the Scorecard follows the date window only, and says why.
On the Dashboard the charts are grouped into five tabs — by what the data means, so the measures that move together are read together:
| Group | Question it answers | What's plotted |
|---|---|---|
| Flow — how long work takes | How long does an item take, and how reliably? | Cycle time (average and 85th percentile); every finished item, as a dot; lead time (average and 85th percentile) |
| Delivery — how much comes out | What pace do we deliver at, and is it steady? | Items completed per period; net flow (completed minus started); raised, started, finished — the cumulative flow diagram |
| Health — the state of the board | How loaded is the board, and how stale? | Work in progress; aged work; aged share of WIP, the two in proportion; work item age, by workflow stage where your export says one; time in stage, where the wait actually goes |
| Work Mix — what kind of work finished | Where do defects come from and get caught, and how much of our work did we have to do? | Defect rate — defects resolved and defects raised; where defects came from and where they were found; the non-discretionary share |
| Forecast — what that implies | When will this batch be done, and how much by a date? | Two distributions from ten thousand simulated runs, one per question |
The first four describe what already happened. Forecast is the only one that looks forward, and it is the reason for collecting any of the rest — see Forecasting below.
Charts sit two to a row at any window wide enough for the pair. Delivery holds three, so its last one — the cumulative flow diagram — is alone on its row: it keeps a single column's width and sits centred rather than stretching the full width. The one card that isn't a chart, time in stage, does span both columns, because a five-column table in half a row scrolls sideways on an ordinary laptop. A chart drawn twice as wide as the ones above it reads as the more important one, which it isn't, and its bars stop being comparable with theirs at a glance. On a narrow window every chart is full width, so there is nothing to centre.
Any one of them can be filled to the window with the ⤢ in its corner, with the header still there above it, and the ‹ › beside it step through the rest of the charts on that screen without coming back down.
Choose how much history to show — 1 month, 12 weeks (a PI), 3, 6, 9 or 12 months, All, or Custom dates. Every option but the PI is a number of calendar months; a planning increment is six two-week sprints, so it is 84 days flat rather than three months rounded — a few days out of step with the sprints it is made of would defeat the point of having it. It sits between 1 month and 3 months in the list, because that list is ordered by how much history it shows rather than by the unit each option is written in.
One thing to expect: a 12-week window drawn as weeks usually carries 13 bars, not 12. The window is exactly 12 weeks of calendar, but its ends fall mid-week, so the first and last bars are partial — which is true of every other window here too, and why the note above the charts says how much of the last period it covers.
Group by week, 2 weeks, month — or sprint. The control sits beside the date window on the dashboard. Weekly is the default and the finest grain; monthly smooths out the lumpiness that makes a single week hard to read. Sprint appears only once a team has a cadence set — see below. The grouping also drives the last column of the Your Data table, so the table and the charts always name the same period.
A tab press starts the new view at the top, and so does a Find result that opens no record — changing what you are looking at means the page you open begins at its beginning, rather than at whatever offset the last view had you scrolled to. Pressing the tab you are already on is not a move and leaves the page alone. The control strip holds the scroll, on purpose: the team picker, the date window and the Count switch all leave the page exactly where it is, because changing one of them is a comparison and it only works if the figure stays under your eye. That is the family's rule in one sentence — changing what you are looking at goes to the top, changing which period or team you are looking at holds still. A Find result that opens a work item holds too, since the editor is over the row you searched for.
Pin the tabs and controls to the top. The 📌 at the end of the tab row holds that whole band — the tabs and the control strip under them — against the top of the window while the page scrolls underneath, so you can change the window or the grouping from halfway down a long dashboard without scrolling back up. It is off until you ask for it, because pinned chrome is bought with vertical space and only you can make that trade; press it again to let the band scroll away, and it is remembered for next time. Nothing else moves when you pin — the page is exactly the height it was.
Fold any card away. Every card and chart with a heading folds up to that heading (since 2026-11-03, as in Sprint Predictability, Money Map and Wine Cellar). Press the heading bar — or Tab to its ▶ and press Enter or Space — and press it again to open the card. The ▶ points right when folded and down when open, so the state never rests on colour. Folds are remembered on this device only, beside the pin, and never travel in your data, a backup or a share link. A folded chart has no full-screen button until it is opened, and a folded card prints open. Empty states and the welcome card never fold, and nor do the Scorecard's small figure cards.
Tabbing never leaves a control behind the header. The header stays at the top of the window as you scroll, pinned or not, so when the keyboard moves to a control above the window — Shift+Tab back up the dashboard, above all — the page scrolls it into view just below the header (and below whatever is pinned) rather than underneath it. Until 14 September 2026 that only worked while pinned, and even then not for the control strip on a phone. Sprint Predictability and Money Map work the same way.
The welcome card has nothing to pin. The card hides the tab row and the controls, so a first
run with the pin remembered has no band, and the app's own answer to what is stuck right now?
says so. (Until 2026-09-04 it reported the hidden band as stuck — a box that is not on the page
still reads position: sticky from the stylesheet — and the clearance it wrote happened to be
right only because a hidden box measures 0 tall. The answer is now asked of whether the band is
on the page at all, which also covers a phone, where the sticky thing is the tab row inside the
hidden band.)
On a phone it pins the tab row only. The band there is the tab row plus a control strip whose four pickers stack. When this was built that came to 537px against a header that was then 173 — seven hundred pixels of an 812px screen before a figure appeared; the header has since become one scrolling line, and the band is still most of a screen. The tab row alone is 42, and buys the thing a phone reader actually wants, which is changing tab without scrolling back up. You still scroll to the top to change the window or the grouping there. Money Map makes the same trade for the same reason.
And on a phone the tab row is one line that scrolls sideways, rather than two that wrap: four tabs and the 📌 are wider than a 375px screen has room for once the page's own padding is off. The tab you choose is nudged into view if it would sit off an end — with room for its focus ring — and the 📌 stays put beside them rather than scrolling away. Sprint Predictability and Money Map draw their tabs the same way. The scroller keeps 4px of room on every side for the keyboard focus ring, so a tab you Tab onto shows its whole outline — until 2026-09-04 the top and the outer edges were sliced off by the scrolling box, which clips at its own edge. The header's controls and the tab bar are each one line that scrolls sideways, at any width (since 14 September 2026). When the window is too narrow for them, the controls keep their place beside the name and scroll there instead of stacking two or three deep — only an upright phone, where the name leaves too little room, puts them on a line of their own under it. Tabbing onto a control that is half past the edge scrolls it fully into view, and ‹ › arrows appear beside any row with more off an end — press one to slide the row along. On a touch screen the arrows stay away and you swipe the row instead. A window wide enough for everything looks exactly as it did. Sprint Predictability and Money Map work the same way.
Charts draw their data in the shared theme pack's categorical colours — --series-1, a blue,
for the measure, and --series-5, a rust, for the second series where a chart has one. They used
to draw in the app's accent, which is fine on Midnight and Light and wrong on the other two: on
Sepia and Dark the palette makes the accent the body-text ink, so a throughput line came out the
same colour as the writing around it and the dashboard read as black and grey. Trend and reference
lines stay muted grey on purpose — they are annotation over the data, not data.
Each chart carries a dashed linear trend line — on a chart of counts it is fitted through whole periods only and stops short of an unfinished last one, so a week two days old never reads as a fall — and four summary tiles above the tabs state the window-wide figures — one for each dimension a kanban team can act on:
| Tile | Question it answers |
|---|---|
| Completed per period | What pace do we deliver at? (over whole periods only, see below) |
| 85th percentile cycle time | What can I promise about the next item? (with the median beneath it) |
| Work in progress | How much is in flight right now? |
| Aged work | What has been in flight too long — i.e. what do I do today? |
Those are the four flow metrics a kanban team is normally coached on, and the last two are the only figures here that describe the board as it stands rather than as it performed. Cycle time reads as the 85th percentile rather than the average deliberately: cycle times are skewed, so the mean lands where most items beat it and a minority miss it badly — it is the one figure on the page nobody can forecast with. The average is still a tile, beside the chart that plots both lines.
Each group then adds a small tile row of its own, stating what its charts can't:
- Flow — average cycle time (pooled over the items in the window, so an empty week can't drag it down), average lead time, and the 85th percentile lead time beside it. The two lead time figures are the same pair as the two cycle time ones: what a typical request costs, and what you can promise about the next one. The percentile is normally a good deal the larger of the two — lead time carries the queue as well as the work, so its tail is longer than cycle time's, and the gap between percentile lead time and percentile cycle time is the queue.
- Delivery — steady delivery, the band most whole periods land in (15th to 85th percentile of the per-period counts); total net flow; and started vs completed, the two counts net flow is the difference of.
- Health — the ratio of work in progress to a month's throughput, the aged share of WIP and the age of the oldest item still in progress.
- Work Mix — the defect rate, From ServiceNow, Found in production and Non-discretionary.
- Forecast — the 85%-confident answer to each of its two questions, the pace needed (or in hand) when the forecast has both a scope and a date to work from, and what the answers were drawn from — normally the number of whole periods.
Net flow and the defect rate sit with their charts rather than in the headline row because both are readings on the period just gone, and neither says what to pick up this morning. Net flow in particular says which way work in progress is moving, where the headline tile says where it stands — and a net figure of +2 reads the same from 12 started and 10 completed as from 2 and 0, which is why the pair of counts sits beside it.
The headline four stay visible whichever group is open. The tiles are deliberately neutral —
with one exception, and only when you ask for it: the aged share is the one figure here that
takes a colour, and only once you have typed both of its boundaries in Settings. Leave either
box empty and it behaves like every other tile, stating the figure and leaving the judgement to
you. See Aged Share of WIP below. There being exactly four in the
headline row, they go four-across on a wide window and pair into a 2x2 on a narrower one — never
three and a stray fourth; the group rows vary in count and are laid out by auto-fit instead.
Every tile row is a card, and every tile is a shaded box inside it — the same shade as a table's box and a chart's plot area, so a tile, a table and a chart read as one family of boxes set into their cards in all four themes. (Until 2026-10-31 the tiles sat straight on the page in the cards' own colour, because a row of shaded tiles on the bare page read in Sepia as a tan band above cream charts; inside a card they read as part of it.) The left edge is 6px and carries a graded tile's colour.
Not everyone has a Jira, or knows how to get a report out of one. Add an Item… sits beside the paste box on a first run, and + Add Item on the Loaded Data card once you have rows: one short form — started, completed, work type, and optionally a created date, an item name, the stage it is sitting in, and how many days it spent in each of your stages.
Everything on the dashboard can be filled in from that form. There is no chart, tile or table here that needs an export — the stage day counts were the last thing that did, until 2026-08-22.
It also closes a gap the paste box never could: press any row in Loaded Data to edit it, or delete it. Before this the card said "read-only — to correct a row, fix it in your source and paste again", which is no answer at all when the source is your own memory.
Five things worth knowing:
- The dates are date pickers, so there is nothing to guess at. The ambiguous
day-first/month-first question a pasted
1/3/26raises does not arise here at all. - Press anywhere on a row in Loaded Data to open it, not just its name — though a click that ends a text selection is ignored, so dragging a figure out to copy it still works.
- An empty stage box is not a zero. Leave a stage blank and that item simply says nothing about
it; type
0and you are saying it crossed that stage inside a day. The medians on the Time in Stage table only count the boxes you actually filled in, which is what keeps them honest. - A date in the future is refused, in any of the three fields, and the message says why: every window on the dashboard is measured back from the newest date in your data, so one item dated next year would empty every chart on it.
- A typed row and a pasted row are the same thing once saved. Both cross the same guards — the
work type capped and dropped whole if it is really a sentence, the item name kept only if it is
the shape of an issue key. The difference is that the form refuses rather than quietly
dropping: a bad ordering of dates, and — since 2026-09-04 — an item name that is not the shape
of a Jira key ("That isn't the shape of a Jira key — DAE-1552. Leave it blank or fix it.").
Leaving the box blank is fine; the field is optional. Until then a typed
bad key heresaved the row with no key and no word about it, while the same box on a feature was refused out loud. A paste is hundreds of rows from a system nobody here controls, so it drops the bad cell and reports the line; a form is one row with you looking straight at it.
Scrolling never changes a number box. A browser steps a number box you have just typed in every time the mouse wheel or trackpad scrolls over it, so scrolling a window down past it used to change the figure without a word. The box now lets go of the cursor the moment you scroll over it, and the page scrolls instead; click it again to carry on typing.
The window note under the date range reads "14 weeks · 67 of 190 items (9 in progress)" when the picker is hiding history, and just "190 items" when it is not. Both numbers are worth having: the first is what every figure on the screen is computed from, and the second is what the team holds. Narrowing the window trims weeks, not rows — nothing is deleted — so without the pair the note stated a count nearly three times what the charts under it were drawn from, directly beneath the sentence naming the three months being shown.
Your data usually stops part-way through a period — the export runs to a Tuesday, the month it lands in has three weeks left. That last bar is genuinely lower than a full period's and always will be. The chart still plots it and the window note still says how much of the period it covers ("Last week covers 4 of 7 days"), because dropping it would hide the most recent data, which is the first thing anyone looks at.
The two figures that describe what a typical period looks like skip it: completed per period and steady delivery. A period that hasn't finished happening is an incomplete observation rather than a slow one, so averaging it in reports a pace the team never worked at, and letting it set the band's low edge reports a floor they never delivered at. Both tiles name the count they used ("over 13 whole weeks"), both read "—" when no period has finished yet, and the ⓘ on each says so.
Everything else counts it, because nothing else is a per-period count:
- Cycle time and lead time average over items, not periods. An item that finished on the Tuesday took exactly as long as it took.
- The defect rate is the pooled share — defects completed over everything completed in the window, not the average of the per-period rates the chart plots. Averaging the rates weighed a quiet week's one-of-one the same as a busy week's four-of-ten, and counted a week in which nothing finished as a 0% that was never observed at all. A period that stops early still counts every completion it does have — a share is scale-free.
- Net flow, started and completed are totals of what happened in the window, not claims about a typical period.
- Work in progress and aged work are read at a point in time, and that point is already clamped to the end of your data (see below).
The forecast skips it too, and for the strongest version of the same reason: it deals whole periods out again at random, and a period that has not finished happening is a bad week that never occurred. Dealing one in would teach the model a slump the team never had. It uses exactly the set the completed-per-period tile does, so the two can never disagree about which periods they describe.
The line is drawn at "is this a count per period?", not at "is this important". It does mean two tiles in the same row can be counted over different sets of periods — steady delivery over whole ones, net flow beside it over all of them — which is why each tile states the count it used.
Each chart card heads with what it is — CYCLE TIME, THROUGHPUT, AGED WORK — and carries the detail on a second line beneath: which grouping, which series, the window average. The name is identifiable at a glance across a room in a stand-up; the sentence under it answers "plotted how?". The ⓘ button sits on the name and opens a plain-English note on what the figure means and which direction is good.
Every option in the window picker but one is counted back from the newest date in your data: the last three months, the last 12 weeks. Custom dates is the one that isn't. Choose it and two date boxes appear beside the picker; the figures are then read between exactly those two dates.
It exists for the thing a rolling window structurally cannot do: compare two fixed periods. Last quarter against the quarter before it. The three months either side of a reorganisation. The period a change was supposed to help, read on its own terms rather than as part of a span that keeps moving as more data arrives.
A few details worth knowing, each of which is there for a reason:
- Choosing it doesn't change the picture. The boxes are filled in with the window you were already looking at — the last three months of your data — so you start by editing a window rather than building one from nothing. A control that emptied the charts the instant you chose it would read as broken.
- The end is clamped to your data. Type a To of next month and the figures are still read as of the last date your export actually reaches. Everything in this app is read as of the newest date in the data rather than as of today, deliberately — work in progress and aged work are both read at the window's end, so an end date past the export would age every open item for free against data that stopped weeks ago. Work item age is read at that same end: an item finished after the window was still in flight on its last day and is drawn at the age it had reached then, and one started after it is not there yet. (Until 2026-09-01 that chart listed whatever was open today, so the tile beside it and the chart described different items.)
- Nothing dated after To is in the window. The axis is drawn in whole periods and a typed end usually falls inside one, so the last bar is partial ("Last week covers 2 of 7 days") and an item finished later in that same week is not counted as finished — it was still in flight on the window's last day, which is how the work-in-progress and ageing tiles already read it. (Until 2026-09-17 it was counted, so Aug 1–31 took in a completion on 2 September.) The first period is whole: the figures count from the start of the week or month your From falls in, the same rule every other window follows, and the Scorecard's window before ends the day before that period so the two never share a completion.
- Both dates are needed, and From must come before To. Half a pair is the state you pass through on the way to typing the second date, so it means "no custom window" rather than an error — the note under the strip says so while it waits, instead of leaving two boxes that hold dates and appear to be ignored.
- Neither box will take a date in the future, the same rule every other date field here follows.
- It reaches All Teams too, and there it does the aligning the shared date exists for by construction: every team is read between the same two dates, however much or little data each of them has inside them.
- A window your data doesn't reach plots nothing, and says which dates it found nothing between rather than blaming the work type filter.
Which dates you're looking at is a position on this device, like the team you have picked: it is not part of your data, so it stays out of backups and share links.
This app shares its look and behaviour with
Sprint Predictability, its sibling: the same
sticky header, button tabs (with arrow-key navigation), summary tiles, ⓘ help dialogs,
read-only share links, theme picker and footer. Each app's footer carries a button link to
the other, at the right-hand end of the row that holds the Privacy policy and How it
works links. If a chrome rule changes in one app, it should change in the other too — with one
noted exception. How many tile columns there are: this app's headline row always has exactly
four tiles and so states its column counts outright, while the sibling's tile groups vary in
size and are still laid out by auto-fit — as this app's own per-group tile rows are. Tiles are
shaded boxes inside a card in both apps now (the sibling's sit inside its view cards; here each
tile row is its own card).
Every table and every chart sits in a shaded box inside its card — All Teams, Time in Stage, Feature Progress, the forecast figures and schedule, and Loaded Data, and the plot area of every chart (full screen too) — the same shade as the tiles, with a lighter heading band on a table, so a tile, a table and a chart read as one thing set into the card in all four themes. Printed, the boxes drop away and the charts sit on the paper. Both apps do this; the only difference is where a table's box is drawn (here on the table's scroll box, there on the table itself).
Set Our Sprint Cadence in Settings — how long a sprint is in calendar days, and the date
one of them started (any one; the app counts the rest off it). A two-week sprint is 14, and so
is a ten-working-day one: the working days setting changes how long an item is said to have
taken, but it cannot move a sprint boundary, because a boundary is a date on the calendar. Then each team says whether it runs sprints, under
Edit in Teams & Stages: doesn't run sprints, our cadence, or a cadence of its own.
Teams on a cadence gain a Sprint option under Group by that cuts every period on their real
sprint boundaries. The forecast walks those periods at their real length too, so a 14-day sprint
forecasts the same dates a fortnight does.
The cadence lives in Settings rather than on each team because a train is a synchronised cadence — asking thirteen boards to type the same fortnight is one question asked thirteen times with twelve chances to disagree, and a disagreement quietly withdraws the pooled Sprint option on All Teams. Whether a team runs sprints is a fact about the team, which is why that half stays there: in a real estate only some of them do.
It changes no measurement. Cycle time, throughput, aged work and the rest are worked out exactly as before; all that moves is where each period begins and ends. That is the point: the 2 weeks option counts fortnights from a fixed date in 1970, so for a two-week team it lands half a sprint out and every bar straddles two of them. A bar labelled with a sprint start is one a team can argue with.
On All Teams the option appears only when every team in scope is on the same cadence — same length, same phase. Teams a whole number of sprints apart count as the same grid; two teams offset by half a sprint do not, because one bar would be the back half of one team's sprint and the front half of the other's. A whole train on the company cadence satisfies this by construction, which is the other reason the cadence sits in Settings. When the option is withheld the note under the charts says which of the three reasons it is: some teams have none, none do, or they are not aligned. The Scorecard is unaffected — it aligns to whole weeks whatever Group by says, for its own reasons.
Both the company cadence and a team's answer travel in a share link, because between them they decide where the bars are: a link that dropped either would show the reader a different set of numbers under the same headings.
Five things belong to one team rather than to the app: its WIP ≤ and 85% ≤ targets, whether it runs sprints, whether it counts in the train's aged share, and whether its ServiceNow incidents count as defects. All five live behind Edit on the team's row, in a window that saves as you go — there is no OK button because there is nothing to cancel.
Once a list runs long it also gains a second Add button at its foot, so adding a team, a train or a stage doesn't mean scrolling back to the heading every time. It appears when a section grows taller than the window showing it — the point you can no longer see its heading and the end of its list at once — which is ten rows for teams and four for workflow stages, whose rows are nearly three times taller because a stage carries a whole grid of status ticks under its name. The one in the heading stays — it is what tells you what the section adds before you have read a row of it.
They used to be four editable cells in the row itself, which worked until the list got long. Between them they were 717px of a row with 928px to live in, so with thirteen teams the window scrolled sideways — and the scrollbar sat at the bottom of the list, so from the top there was nothing on screen to say the row continued. Team names were squeezed to 138px and truncated mid-word.
The row now states what a team has set and the editor changes it: WIP 6 · Sprint 14d,
or an em dash for a team with nothing configured. Read-only text costs a fraction of a control's
width, which is what buys the name box back the room it needs — and the column still reads
straight down the list, so you can see which teams carry a target without opening anything.
If you support teams across more than one Agile Release Train, you can group them. The Teams & Stages dialog has an Agile Release Trains section: add one, then set each team's ART from the picker in its own row of the table above. A team can be on one train or on none — being on none is perfectly normal, and nothing forces you to use the feature at all.
An ART is a label, never a level of maths. Every figure in this app is worked out per team and the All Teams view adds them up; grouping changes what you are looking at and never a single number. What it does change:
- All Teams and the Scorecard gain a train picker, and you can tick more than one. It is one picker shared by both views rather than a copy each — it sits above the panels, so ticking a train moves both. It lists each train by name with the number of teams on it, plus No ART if any team is un-grouped, and All trains at the top to clear the lot. Tick two and you get both trains' teams together — everything below follows: the four tiles, the chart, every row, and the summary row at the foot of the table. Ticking nothing is all trains; there is no "select all" to remember to press. The heading names every train you have ticked, in full. The button and the foot of the table name one and count the rest — Payments and All teams on Payments with one ticked, 3 selected and All selected teams past that — because both of those sit in a narrow column, and five train names spelt out there take the space off the figures beside them. (Before September 2026 it was a single-choice dropdown, so wanting two trains out of five meant taking every team you have and reading past the ones you hadn't asked about.)
- The menu stays open while you tick, because picking a second train is the point of it. It closes on Escape, on All trains, on the button, or on a press anywhere else. From the keyboard, ↓ moves into the list and Space ticks — and the keyboard stays where you put it, tick after tick.
- The picker says how many teams it is hiding, and which trains it is showing, the same way every other exclusion in this app says what it left out. A figure should never move for a reason that isn't on the page. With two or more ticked the button itself says 2 selected — the names are in the sentence beside it and in the table's heading, which have room for them.
- With no filter, the table groups by train so a train's teams sit together, and each team carries its ART under its name. It carries it with two or more trains ticked too — rows from two trains are a mixture the table cannot otherwise account for — and drops it when you scope to one, where every row would say the same word and the heading has already said it. The header team picker groups the same way, so a list you know by eye reads the same in both places.
ARTs reorder with ↑ and ↓ like teams do, and that order is the order their groups appear in — both in the header picker and down the All Teams table.
Deleting an ART is the cheapest delete in the app: it takes no team and no work item with it — the teams that were on it simply go back to having none. The confirmation says so. If the train you delete was one of several ticked in the picker, the others stay ticked — only the deleted one leaves the scope.
Share links carry only the trains their own teams are actually on, so sharing one team never publishes the names of every train you support. Share a team that is on no train and the link has no ART names in it at all.
The dashboard answers how is this team doing?. All Teams answers which of my teams needs me? — which, before it existed, meant visiting eight teams in the picker and holding their numbers in your head.
A chart of the whole train's throughput over time, then one row per team, one column per question people actually scan for:
| Column | The question |
|---|---|
| Per week | Who is delivering, and at what pace? |
| Throughput trend | Which team is changing? |
| 85th cycle time / 85th lead time | Who is slow at doing the work, who is slow at responding — and the gap between the two is their queue |
| In progress | Who is overloaded — and is their board filling or draining? |
| Aged / Avg aged % | Who has work going stale — and how much of their board is it, averaged across the window? |
| Defect rate | Who has a quality problem? — empty in the feature view, and the note under the table says why |
| Non-disc. % | Whose capacity goes on work they had to do? — the non-discretionary share, and a dash for a team whose export carries no Type of Work |
| Data to | …and whose figures are worth trusting at all |
Throughput trend and Data to carry an ⓘ of their own. They are the two columns that exist only here — every other column is a dashboard tile laid on its side, and the tile carries the note. Nine circles across one header row costs 360px of a table already tight for width, which is the whole reason it is two and not nine. Making room for a third circle is why the headings of this table wrap onto a second line where every other table's stay on one, and that rule stays even though the third circle has gone: it is what keeps the two-word headings from setting the column widths.
Completed and WIP vs month were columns here until September 2026, when they were dropped to make room for Avg aged %. Both figures are still on the dashboard. Per week is the same measure as Completed normalised to the window, and it is the more useful of the two here — an absolute count over a shared window mostly ranks teams by size. What is genuinely gone from this table, and from its CSV export, is the roll-up's only absolute volume figure. WIP vs month's note was not deleted with its column: it moved to the dashboard tile labelled WIP vs throughput, which had the same problem the column's ⓘ was added to fix — it was opening a window titled Work in Progress, which tells a reader who came about the ratio that the window is not for them.
85th lead time sits immediately beside 85th cycle time, and the adjacency is the point. The cycle time column measures from the moment work started, so it cannot see a request that sat for three weeks before anybody picked it up. The lead time column measures from the moment it was raised. The gap between the two cells is that team's queue — readable along the row without doing any arithmetic, and normally the cheapest thing on this table to act on, because closing a queue takes scheduling rather than anyone working faster. In the demo, Team Healthy Flow reads 6 against 9 and Team Long Tail 23 against 30.
It reads as a dash for a team whose export carries no Created column — a real and ordinary state rather than a fault, and the same shape the defect rate column already has in the feature view. Data to is the column that explains patchy data. It carries no ⓘ, under the rule above: its note opens from the 85th percentile lead time tile on the dashboard, which is named for the same heading.
Avg aged % is the ageing column worth sorting on, because it is the one that compares. Six aged items is a tail on a board of thirty and a stop on a board of six; the count beside it ranks teams by size, and this one ranks them by trouble. It carries no ⓘ, under the rule above — its note opens from the Aged share tile on the dashboard, which is named for the same heading. The cells are plain text whatever the figure: the tile grades, the comparison table states.
The two do not divide, and the heading says so. Aged is the count open on the shared end date; Avg aged % is the share averaged over every period of the window, so a row reading 6 and 38% is not an arithmetic slip. The note under the table says it a second time, because a heading can name a shape but not what it is a shape of. The word costs the table no width — a header cell is as wide as its longest word, and that is still aged.
Throughput trend deserves its own paragraph, because it answers something none of the other columns can. Every other figure here is a snapshot, so a team halfway down a decline reads exactly like a team that was always that slow — and the chart above hides it, because one team's slide is another's gain. The sparkline is that team's throughput across the window on screen, drawn from the same fitted line the chart uses, with the signed figure beside it showing what the line rises or falls by end to end. Sort by it to put the steepest fallers on top.
The signed figure is a plain number — -1.1, +4.3, 0.0 — so the column survives the trip
into a spreadsheet as something you can sort and average. It is written with an ordinary hyphen
rather than a typographic minus for exactly that reason: these tables are read off the rendered
page, so what is on screen is what lands in the CSV, and the one column whose whole point is its
sign is the last one that should arrive as text.
The trace is scale-free — normalised to its own range — so what it shows is the shape. Two teams with identical traces can be delivering at very different rates; Per week beside it is the magnitude. And check Data to before reading a fall as a slowdown: a team whose export stopped three weeks ago has a trace that falls away for exactly the same reason it has a stale date, which is a reporting problem rather than a delivery one. (The demo shows this on purpose — Team Bare Export has both the steepest fall and the oldest export.)
Added September 2026. The In progress cell reads 9 ⟋ +6.3 — the count, its history across
the window, and what the fitted line moved by. It is the same trace and the same fit as the
throughput column, drawn from the same function so the two can never disagree about a team.
Read it against Per week rather than on its own. Cycle time is roughly work in progress divided by throughput, so a board filling while the pace stays flat is a cycle time rise that has not landed in the percentile column yet — work is arriving faster than it leaves. A board rising alongside throughput is a team taking on more and finishing more, which is a different thing entirely. In the demo, Team Long Tail reads about four per week with a falling trend and a board that is filling: delivery slowing while the board grows, and its long percentile cycle time and its average aged share — the highest on the page — are what that has already cost. (The demo is dated from the day you load it, so the exact figures move a little from day to day.)
Only two columns on this table draw a trace, and that is a judgement rather than a limit of the data. A per-period series exists for the cycle time percentile, the lead time percentile and the defect rate as well, and drawing any of them would be wrong. Throughput and work in progress are censuses — every item on the board contributes to every point. The other three are percentiles and shares of that period's completions, which on most teams is a handful of items: a weekly 85th percentile over four completions is "the second-longest thing that finished", and it draws as a picket fence. Worse, it would be noisy unevenly — trustworthy on the busiest row of the table and meaningless on the quietest, with nothing on screen saying which. Cycle time drift is a real question, and the honest answer to it is a fit over pooled items rather than a line joining per-period percentiles.
Two things it deliberately does not do. The column still sorts by the count, not by the change — with a screenful of teams a filling board is visible without ranking them, and a separate column to sort on would not fit (below). The change is on screen but not in the export: that column of the CSV is the count, so it stays a number you can add up. Everything else in the file follows the rule that what is on screen is what lands in it; this is the one cell that shows a second figure, and it is stripped for the same reason the ART printed under a team name is.
Why it is inside the cell rather than a column of its own. Measured at min-content with the demo loaded, the table is 873px today, 953px like this, and 1018px with a tenth column beside In progress — against the 1030px a 1100-wide window leaves it, before a single real team name is typed. A tenth column overflowed the narrowest width this table is built to fit. It is also the more truthful shape here: work in progress is a level read at each period's end, so the trace's last point is the number in the cell. Throughput cannot do that — its trace ends on the newest period's count while Per week beside it is the mean over whole periods, two different figures that would read as one if they shared a cell.
A reload puts you back on whichever tab you were last using — all four of them. A remembered tab that is no longer on offer (All Teams and the Scorecard both disappear below two teams) falls back to the dashboard, as does anything unrecognisable in a hand-edited copy.
The page also holds still while it loads. This app is one 1.6MB HTML file that the browser paints as it parses, with the script that fills it at the foot — so for about a tenth of a second you used to watch an empty skeleton assemble and then everything pop in at once, and a reload on Your Data painted the whole dashboard first and then swapped it out. The header shows straight away, because everything in that row carries its final width in the markup; the rest appears once, complete, on the tab you left it on. If the script ever fails outright the page reveals itself anyway after two seconds, so a broken load is a visibly broken page rather than a blank one.
There is deliberately no line-per-team chart. This view is written for somebody with eight teams, the shared theme pack's categorical ramp stops at five, and eight lines on one card is a spaghetti chart even where the colours exist. A column sits beside the numbers it explains and scales to any number of teams.
Press a column heading to sort by it. Every numeric column runs worst-first on the first press — most aged, longest cycle time — because the reason anyone presses a heading is to find the outlier, not to admire the ordering. Data to runs the other way, since the interesting end there is the oldest export. Press again to reverse, and a third time to turn the sort off and get the default order back. Sorting from the keyboard keeps you on the heading you pressed. A team with no figure in a column always sorts last, whichever way it is running: a team with no data has not got the shortest cycle time in the train.
Press a team's name to open its dashboard. That is the move the whole view sets up — the table says who needs looking at, and this is looking at them. The team you currently have selected is marked in the table, so you can always find your way back to where you were. You arrive on that team's Flow charts at the top of the page, whether or not you have the tab row pinned — before September 2026 the press kept whatever place the table had scrolled you to, which landed you somewhere different every time. The keyboard arrives with you, on the Dashboard tab: the name you pressed is inside the panel the press takes away, so without that the focus fell to the top of the document and Tabbing carried on from nowhere. Find does the same thing with the result you open, for the same reason.
The Scorecard is the same scope read the other way: this table is who to go and see, that page is the four figures you report about the lot of them.
If your teams are grouped into ARTs, a train picker appears above the tiles and everything on the page follows it — including the summary row, which becomes those trains' own figures rather than the whole estate's with some rows hidden. You can tick more than one train; ticking none is every team.
The tab appears once you have a second team, the same rule the team picker follows: with one team there is no comparison to make.
The four tiles say where the train is; the chart under them says where it has been — items completed per period across every team in scope, with the same dashed trend line every other chart carries. It follows the train picker, the work type filter, the date window and the grouping, like everything else on the page.
It plots one series and one colour on purpose. A line per team would need a palette of
distinguishable colours that the shared theme pack doesn't have, and inventing one here would put
this app's charts out of step with its siblings. The aggregate needs only the first colour of the
theme pack's series ramp (--series-1) — and it answers the question the tiles can't: is the whole
train's delivery steady? Which team moved is the table underneath.
One thing to watch: a dip can be one team stopping rather than the train slowing down. Check the Data to column before concluding anything — a team whose export is stale looks exactly like a team that stopped delivering.
Every row is read over the same window and as of the same date — the newest date any team has. Without that, "the last 3 months" would mean a different three months in every row, and a team that stopped exporting in June would show a healthy June quarter next to everyone else's September one.
That is also why Data to earns a column. A team three weeks behind everyone else has three weeks of zero throughput dragging its rate down and three weeks of extra ageing on everything it has open — and none of that is visible in the numbers themselves. Team Bare Export in the demo is nine days behind for exactly this reason: it reads slower on this page than on its own dashboard, and the date column is the only thing that explains why. Before drawing any conclusion about a team, check its export is current.
Freshness is a property of the export, not of a work type: filter to defects and Data to still shows when the team last sent anything, not when it last had a bug. A healthy team with no recent defects is not a stale team.
The four tiles and the All teams row describe the whole train. Totals — items completed, work in progress, aged work — really are the sum of the rows above them. The 85th percentile is not: the 85th percentile of eight teams is not the average of their eight percentiles, and a summary row built that way would be quietly wrong in its most-read column. It is worked out over every item any team completed, exactly as if the teams were one team.
That has a consequence worth knowing. Because it pools items rather than teams, the train figure is weighted by how much each team delivers — so a large fast team holds it down while a small team with a long tail sits well above it. On the demo, at the 12-month window, the train reads about a week while Team Long Tail reads more than three. Both are true. Read the tile for a promise about work you haven't assigned yet; read the column to find who needs help. The tile cannot tell you a team is struggling, and it isn't meant to.
A team still gets a row when it has no figures — that is a finding, not an omission — but it says what it can rather than showing a line of dashes. A team that has started work and finished none in the window shows its work in progress and its export date, because "this team has stopped finishing things" is precisely what someone scanning this table is looking for. A team with no work items at all shows dashes throughout.
The Dashboard answers how is this team doing? and All Teams answers which of my teams needs me? The Scorecard answers the third question, the one an RTE is asked once a month: how is the train doing, and which way is it moving?
Four columns, one per thing a leadership team asks about:
| Column | The figure | Read over |
|---|---|---|
| Predictability | Aged share of WIP — how much of the board has been open past your ageing threshold, averaged across the window | work items, minus any team held out |
| Quality | Defect share of completions — how much of what finished was defect work; a support team's incidents are not defects here, and the card says how many teams that covers | work items |
| Flow | Average feature cycle time — how long a finished feature took, start to completion | features |
| Distribution | Work distribution — how the finished work divides between Discretionary and Non-Discretionary, as a pie, and not graded | work items that carry a Type of Work |
Each card carries the figure, a band strip stating the three ranges you are reading it against with the one it falls in marked, the verdict spelled out in words, and a What It Means line saying which way it has moved since the window before this one.
None of it is new arithmetic. Every figure is one field off the same derive() the
dashboard reads, pooled across the teams in scope exactly as the All Teams train row is pooled —
so a card here and a tile there cannot disagree. What is new is the comparison, the bands, and
putting the four side by side.
The tab appears once you have a second team, the same rule All Teams follows: a roll-up of one team is that team's own dashboard with four of its tiles on it.
The fourth column, modelled on the printed scorecard it replaces: a pie of how the finished work items divide between Discretionary and Non-Discretionary work, read off the Type of Work column and pooled across the teams in scope.
- It is not graded. No share of discretionary work is the right one, so there are no bands, no colour on the card and no verdict — a legend strip stands where the bands stand on the other three, naming each half with its figure. Each wedge carries its figure too, so colour is never the only thing telling the halves apart.
- Only items that carry a Type of Work count, and the line under the name says how many of the completed items did. With none, the card shows a dash and says so.
- What It Means is worked out, not typed — the share's movement in points against the window before, the same way the other three cards say theirs. The app stores no free text, so the hand-written explanation on a printed scorecard is not something it can hold.
- The pie is drawn in the theme's own series colours and follows the theme, on screen and in print.
Four cards sit in one row on a wide window, in two rows of two on a laptop-width one, and in one column on a phone.
trainRowsOf pools items, not teams, so the Predictability figure is item-weighted: a large
team moves it more than a small one, and a team that doesn't manage aged WIP at all drags the
train's number somewhere nobody owns. In the train's aged share, under
Edit on a team's row, is how a team sits out. Every team is in
unless you untick it.
The case it was built for is a Scrum team that measures its predictability as the share of a sprint commitment it completed — a number this app cannot compute, because it stores no commitment and no sprint scope. Aged WIP is not a rival to that figure so much as its leading indicator (an item open past your threshold is an item that won't make the sprint), so ticking a team out is a decision worth making deliberately rather than a default.
Only this card. Quality is a defect rate and Flow is a feature cycle time; neither asks anything about how a team plans, so neither loses a team. When anyone is held out, the Predictability card says "across 5 of 8 teams" under its heading and the sentence above the four cards says how many are out and where to change it — a figure that moved because five teams are behind it instead of eight, with nothing on screen saying so, is the one thing this page will not do. Hold every team out and the card says exactly that, rather than the "nothing has completed yet" it would otherwise reach for.
The tick travels in a share link, for the plainest reason of the three fields that do: dropping it would put a team back into a figure its owner deliberately took it out of.
The comparison window is this one shifted back by its own length, ending the day before the first whole week of this one starts — the figures on screen are counted from the start of the week holding the window's first day, so the two windows never share a week and nothing is counted twice. A three-month window is read against the three months before it; a PI against the 84 days before it; a pair of typed dates against the same span immediately before them. The shift is by days, not calendar months, so one rule serves every option the picker offers — there is no honest answer to "the month before a PI".
It is read as of its own end, which matters more than it sounds. Each window's figures are taken over that window's own periods, so a prior window read as of today would put last quarter's completions beside this morning's board. The two windows are named in full under the date picker, so you can always check what is being compared with what.
A percent moves in points, never in percent. A share going from 20% to 10% has not fallen by 10%, and "a 20% increase" said about a figure that is itself a percentage is an ambiguity, not a finding. The days figure moves in days.
Three things it will not do:
- "All" has no window before it, so nothing is compared and the page says so once, above the cards, rather than four times down them.
- Data that does not reach back far enough is said as exactly that — not as a movement of nought.
- A window with the figure missing (nothing finished, no feature closed) says which, per card. Four figures fail in four different ways, and one shared dash would report a quality problem where there is only an absence.
Three of the cards are derived over work items and one over features, and a rolling window is counted back from the end of the data it is derived over — so the two would drift apart on their own. A board whose features stopped being updated in June would give the Flow card a window ending in June while the note above it named September, and nothing on screen would say so. The two are pinned to the later of the two end dates, exactly as All Teams pins every team to one shared date, so the last month means the same month in all four cards.
The Flow card's empty state then tells you which of five things is going on, because they are five different findings and only one of them is about this month's delivery:
| What the card says | What to do |
|---|---|
| No team in scope has any features | Check Work types that mean a feature in Settings — the parse report on Your Data names the types your export actually carried |
| None of the N features has completed yet | Nothing; they are all still open, and widening the window will not help |
| None completed in this window | Widen the window — a feature routinely runs for weeks, so a one-month window often catches none |
| N completed, but every one with a start date ran past the outlier cutoff | Raise Ignore items over in Settings, or turn the rule off — a fence set for work items is too low for features |
| N completed but none carries a start date | Fix the export: a feature needs a start date as well as a completion date, the same two a work item needs |
Set a pair of boundaries under Grading in Settings and the card draws its scale: ≤20%,
21–40%, >40%, with a ▸ on the one the figure is in. The labels come off the two numbers,
so they can never overlap or contradict the grading — a printed scorecard reading 16-25 beside
>=25 claims 25 twice, and this cannot.
On a screen narrower than 360px the three bands stack instead of sharing one line: at 320px the marked band's label was losing its upper bound behind an ellipsis, and a strip whose whole job is to show the two boundaries must not hide one.
Leave either box empty and the strip is not drawn at all. Not greyed, not empty — a strip of three blank ranges is a scale nobody drew. The card states the figure, says which setting would grade it, and leaves the judgement to you, which is what every other figure in this app does.
Colour is never the only signal, and here that matters more than on a tile: three coloured boxes side by side are precisely the picture a red-green reader cannot resolve. The marked band is told apart by weight, by an inset ring and by the ▸; the figure carries a ✓ / ! / ✕ and a status spelled out for a screen reader; the whole strip is one image whose label names every range and which one the figure is in; and the verdict is written out underneath in words, naming the boundary. A reader who sees no colour at all loses nothing.
Unlike a graded tile, the card is not tinted. That fill exists because a tile is small — a label, a number and a caption — and a 6px rule with a line of coloured digits is a thin thing to judge a hue on. This card is not small, and the thing it has instead is the strip: three filled panels of which the marked one is a large flat area of exactly that hue. Tint the card and the marked band would be the same colour as what is behind it.
The Scorecard obeys the train picker and the date window. The other three controls are taken away on this tab rather than left standing doing nothing, and each omission is a figure that would otherwise be stated wrongly:
- The work type filter. The Quality card's denominator is everything completed. Filter to Defects and it reads 100%; filter to anything else and it reads 0%. A filter set on another tab two minutes ago would be a figure moving for a reason that is not on the page.
- The Count switch. The page states both units at once — three cards about work items and one about features — so neither position of that switch fits it.
- Group by. The charts' axis starts at the bucket containing the window's first day, so grouping by month silently widens the left edge by up to a month. That is survivable on one screen and is not survivable when two windows are being compared, because it moves both figures and the movement between them. The Scorecard aligns to whole weeks, always, and the note under the picker says so.
The note under the picker, the line a printout carries and the "against …" comparison all describe whichever list actually has a window. Usually that is no choice — both lists are held to one end date — but a board whose work items are all still open while its features have completed is read over the features' window, and the note says so rather than printing a dash.
The train picker is shared with All Teams, not copied: it sits above both panels now, so ticking a train moves both views and there is only ever one menu and one answer to what is in scope.
Loading the sample data sets all three pairs — 1% and 20% for the aged share, 10% and 20% for the defect share, 30 and 45 days for the feature cycle time — chosen so the demo train reads one card of each state: an aged share in the low twenties (off target), a defect share around a sixth (watch) and features averaging about 26 days (on target). A demo where every card came out green would ship the feature invisibly. Your own browser starts with all six boxes empty and nothing graded.
The aged-share pair was 20% and 40% until the figure became the window's average in September 2026. The demo's three boards read 0%, a third and two thirds on their newest day, which those two numbers separated neatly; averaged across the window they read about 0%, 2% and 34%, and two of the three came out green. 1% and 20% separate the averages at every window the picker offers, and a test walks all four rather than trusting the default. The pair is not advice and was never meant to be — what it is for is showing you what the colours do.
Each team keeps its own list of work items; the picker in the header chooses which one the
dashboard is showing. Teams can be grouped into ARTs, in which case
the picker groups them the same way. Add, rename, reorder and delete teams from the Teams & Stages
button beside that picker — a name is edited in place, ↑ and ↓ move a team up or down,
and × deletes it. Each row also holds a project id — the letters at the front of that
team's issue keys, DAE for DAE-1552 — which is what lets one export covering several
teams be pasted in one go and split between them. It is
optional, it changes no figure, and a team without one simply takes nothing from a split.
Behind Edit on each team's row, in the Team Settings window, are the two figures the team sets rather than measures: WIP ≤, how much work it means to have open at once, and 85% ≤, how long it means an item to take. Both are covered under your own limit and your own target below.
The order matters: it is the order teams appear in that picker and down the All Teams table. That window also holds your Agile Release Trains and your workflow stages, and is laid out to match the sibling app's Teams, ARTs & PIs — same width, a section per thing you manage, each with its own + Add button at the right-hand end of its heading. The third section differs between the two apps, and that is the point: they share a shape, not a list of sections. Settings are shared by every team — one place to say what a "defect" is.
The picker only appears once there are two or more teams: with one team it is not a
choice. It is part of a wider rule — nothing shows until there is something behind it, so a
first run is the welcome card and nothing else. The Loaded Data
card, the Clean Up Old Data card and the Append to Existing / Clear This Team's Data
buttons all appear the moment rows exist (renderEmptyState()).
The Dashboard tab follows the same rule: it isn't there until something has data, and a browser with nothing in it opens on Your Data. It was the last thing here still offering a page of nothing — a tab whose entire content was a card saying there was no data yet. It asks about all your teams rather than the one you're looking at, which is what keeps it from appearing and disappearing as you move through the picker, and what leaves an empty team beside a full one still able to say so. In a shared view it is never hidden: Your Data is taken away there and the header's buttons with it, so hiding this one as well would leave a tab strip with nothing in it.
Which team you're looking at is a position on this device and deliberately isn't part of your data: it stays out of backups and share links for the same reason the theme does.
With nothing recorded anywhere there are no tabs, no view controls and no panels — just one card in the middle of the page:
Welcome to Flow Metrics
A flow clinic for your delivery teams: give it your work items — a completed date, a start date and a type — and it works out throughput, cycle and lead time, work in progress, and the age of everything still open…
Start Fresh · Load Sample Data · Restore a Backup · Forecast Ahead
Start Fresh opens Your Data, where you paste a report out of Jira or add work items one at a time. Load Sample Data loads the demo. Restore a Backup opens the same Back Up & Restore window the ⇩ button does. Forecast Ahead is planning without data.
The first three are the family's card, in the family's words and order. The fourth is this app's alone: forecasting is the one thing Flow Metrics can usefully do before anything is recorded, and no sibling has an equivalent.
It writes nothing. There is nothing to create here — the figures come from a paste or from typed items — so Start Fresh just puts the card away for this sitting and opens the tab that takes both. Reload with still nothing entered and the card comes back, which is the truth about where you are.
Before this the app opened straight onto the Your Data tab and its paste box, which answers "how do I fill this in" to somebody who hasn't yet been told what the thing is. Every app in the family now opens on this same card, in the same words and the same order — what the app is, where the figures go, the three ways in, then a line for each button. The second paragraph is the privacy claim the footer also makes, and the two must never disagree: this app has no sync and no account, so it says so outright.
Load Sample Data isn't filler to fill the screen: it's this app's demo, and the rule is that every feature has to be reachable from it. Four teams, about nine months of made-up work items ending within the last day or two, and one of them deliberately short of a column.
The button is on the welcome card a first run opens on, and again beside Load Pasted Rows on the Your Data tab you reach from it — and, since the Dashboard tab is hidden until something has data, those are the two places it can be met. Pressing it switches you to the dashboard. It disappears once anything holds data, and so does the copy of it on the empty-dashboard card, which from a working app would be a mis-click that quietly adds four teams.
It lands on Team Long Tail, because Team Healthy Flow's board is the prettier one and says less — the reason this app reads the 85th percentile rather than the average is only visible on a team that has a tail.
Each team is named for the one thing it's there to show, so the picker reads as a contents page rather than a list of names you'd have to open one by one:
| Team | What it's there to show |
|---|---|
| Team Healthy Flow | The healthy board. Carries issue keys (KFR-…), as Team Long Tail does (HRN-…), so the charts have something to name their dots with — and the matching project id, so a multi-team paste has somewhere to route them. Short cycle times (p85 ≈ 6 days against a median of 4), four items in flight, none aged, a defect rate around 11%. Its export carries stage times too, and they read the healthy way round: about 62% of its measured time is spent building. It sets a WIP limit of 6 and a 10-day target and is comfortably inside both. Its work is broken down into 29 features of a fairly even size — most take between 4 and 14 items — which is the comparison Team Long Tail's are read against. None of its features is aged against the demo's 30-day feature threshold either — the same clean reading its items give. It runs on the demo's 14-day company sprint cadence, as Team Long Tail does, so Group by offers Sprint. Its export also carries the three work fields: mostly blank for ServiceNow with the odd incident, so Where Defects Came From has both halves, and mostly Discretionary work. The baseline the others read against. |
| Team Long Tail | The board the metrics exist to catch. A long tail, so p85 lands around 23 to 25 days against a median of 5 — the app's whole argument for reading p85 rather than the average, on one screen. (The demo is dated from the day you load it: the tail shows at the 12-month and All windows on every day, and at the default 3-month window on most days.) Nine items in flight, six of them past the 14-day ageing threshold and its oldest well above its own 85% line on the work item age chart, and a defect rate about two and a half times Team Healthy Flow's. Its stage times then say why: more of its time goes on waiting to be reviewed and tested than on building it, which no cycle time figure can tell you. Its export has both a Ready for Code Review and a Code Review column, so it also shows two statuses adding into one stage. It sets the same limit of 6 and the same 10-day target Team Healthy Flow does and, wherever its tail shows, keeps neither — which is the point of the pair carrying identical figures. Its 20 features are bigger and far more varied than Team Healthy Flow's, from 3 items to 26, and take about two and a half times as long end to end — the same finding as its cycle times, said about features. One of its three in-flight features is past the 30-day feature threshold the demo sets, so the aged reading holds at both levels while Team Healthy Flow's stays clean. Its export has no ServiceNow column — so Where Defects Came From shows its empty face — some bugs with no Bug Type, and more Non-Discretionary work than Team Healthy Flow. |
| Team Bare Export | A newer team: four months of history, no created dates, no issue keys, no Status column, no stage times and no features at all, so the lead-time chart's "add a Created column" face is reachable, the parse report's "no issue key in this paste" note is too, the charts' type-named tooltips have a team that shows them, and the date window has a team it visibly runs past. Its export also stops nine days before the others, which is what gives the All Teams view's Data to column something to show — it reads slower there than on its own dashboard, and the date is the only thing that says why. It sets no limit and no target, which is how every browser starts and the only way the no-line, no-verdict face of those two is reachable. With no keys it has no parent keys either, so it is also the team the feature layer's empty face is reachable from. It runs no sprints, and it is held out of the aged share, so the Scorecard's Predictability card reads across 3 of 4 teams — the opt-out's face on the demo. It carries none of the three work fields. Also proves each team's data stands on its own. |
| Team Support Desk | The team the incidents switch is for. Most of its bugs are ServiceNow incidents it works for other teams, and its settings count them as support work — so its defect rate is its own bugs, and the From ServiceNow tile states the rest, about two thirds of what it finishes. Short cycle times, a bug-heavy mix, mostly Non-Discretionary work, and no train, sprints or stages. On the Scorecard the Quality card says incidents are support work on 1 of 4 teams. |
Team Healthy Flow and Team Long Tail also arrive with the project ids their own keys are
built from (KFR and HRN), so pasting several teams at once
works straight off the demo rather than only after three ids are typed in — and Team Bare
Export, with no keys, is the team the split's takes nothing line is about.
The demo also sets all three grading scales — 1% and 20% for the aged share, 10% and 20% for the defect share, 30 and 45 days for the average feature cycle time — chosen so the Scorecard reads one card of each state rather than three green ones. Each pair is written only when both of its boxes are empty, so a line you have drawn yourself is never finished off for you.
The demo also sets the feature ageing threshold to 30 days, which the app itself ships empty on purpose. Thirty is not a default the app holds — it is the number that fits these two boards, which is the whole argument for shipping none — and the confirmation says so before anything is loaded. Clear the box in Settings to see the not-set face the app actually starts in.
The demo also arrives with four workflow stages set up — Build, Review, Test and Deploy —
because a Days in … column is only read when a stage already claims it, so the demo has
to set them up before it pastes, exactly as you would. Team Healthy Flow and Team Long Tail
carry the columns and Team Bare Export carries none, so both faces of the
Time in stage card are reachable, and both axes of the
work item age chart are too. Deploy is deliberately a
stage almost nothing sits in: a table where every row is a big number teaches nobody where to
look.
Team Healthy Flow and Team Long Tail also carry a Status column, so their age charts group by stage. Team Long Tail's is the one to look at: three of its four oldest items sit in Test, which names the bottleneck in a way no cycle time figure can. One of its items is in Compliance Review — a status the demo's stages deliberately don't list — so it lands in the No stage column and the parse report says one item's status matched nothing. That is the demo showing you a real part of a workflow you haven't set up yet, which is exactly what it will do on your own board.
The demo also puts Team Healthy Flow and Team Long Tail on one train (Delivery ART) and leaves Team Bare Export and Team Support Desk on none — the smallest arrangement where every part of ARTs does something. The picker gets All trains, Delivery ART and No ART; both groups have somebody in them; and scoping to the train visibly changes the figures at the foot of the table. A train per team would make grouping look pointless, and putting all four on one would leave No ART absent.
On All Teams the four read as an estate with one obvious problem: Team Long Tail's 85th percentile is several times everyone else's, it holds most of the aged work, and its defect rate is the highest — while Team Bare Export's Data to column quietly explains why its delivery rate looks worse there than on its own page.
The two traces on that row say how it got there, which is what they are in the demo for: Team Long Tail's throughput is falling while its board fills. Its cycle time is not a team that is slow at the work, it is a team taking on more than it finishes.
The demo also seeds the two aged-share boundaries, at 1% and 20%, and that is the only way to see the grading without setting it up: Team Healthy Flow, Team Bare Export and Team Long Tail land on target, in the middle and off target — one on each of green, amber and red — so the tile, its symbol and the chart's bands all have a face to show. They are only written if you have not answered either box yourself, and your own browser starts with both empty and nothing graded. The dialog says which of those is true of your browser: with one box already filled it tells you nothing will be graded until the other is, with both filled it tells you your own pair is kept, and if your ageing threshold is not the default 14 calendar days it says the figures on your screen will differ from the ones it quotes.
The work item age chart reads differently on each team, which is what makes it worth looking at from the demo: Team Healthy Flow has nothing past the threshold and every dot below its own 85% line; Team Long Tail's oldest item has been in flight longer than its own 85th percentile by a wide margin, which is the whole argument for drawing that line; and all of them carry enough work types in flight for the columns to say something.
All four teams have enough weekly history to forecast on the default 3-month window — Team Bare Export, at four months, is the one that decides that — and Team Long Tail's spread is wide enough that its 50%, 85% and 95% answers are days apart rather than all the same date, which is the whole argument for reading a distribution instead of a single number. Switching Group by to Month on that same window drops below the eight-period floor, so the forecast's "not enough history" card is reachable from the demo too.
Every team carries all four work types, so the work type filter does something whichever
team you're on — and loading the demo adds a grouped row, Stories and Tasks → Story, Task,
which the shipped list deliberately cannot show you (two rows naming a stranger's work types would
be two filters matching nothing). It is only added if you have not already changed the list
yourself. The dates cover the whole week, not just weekdays, which is what makes the
working days setting reachable from the demo: turning it on visibly shortens Team Long
Tail's tail and drops two items out of its aged count. The span is long enough that Clean up
old data has real answers — a 3-month cutoff would drop items from all four teams, a 12-month
one from none — and that the 6, 9 and 12-month date windows each change the picture.
The dates are counted from the day you load it, so the demo is live whenever it's opened rather than stale from the day it was written, and the work in progress is genuinely in progress. The randomness is seeded: the same numbers every time, on every device, so it can be pinned by a test and talked through twice.
Two things it deliberately doesn't demo: bad rows and the parse report. Those are responses to input rather than properties of a dataset — you meet them the moment you paste anything of your own — and baking permanent errors into the demo would leave every first run showing a red note.
It asks before it loads and adds alongside anything you already have, with one exception:
the empty My team the app creates on a first run is dropped, but only if it's untouched —
still the only team, still empty, still under that name. To get rid of the demo afterwards,
use Teams & Stages to delete the four, or Start Again in the Back Up & Restore window.
The demo group in tests.html pins every finding in that table. Adding a feature means
adding the data that demonstrates it, a row in this table, and a test — a feature the demo
can't reach is a feature nobody you share this with will find.
The Your Data tab takes a paste from Jira, a CSV or any other export and loads it into the team currently selected in the header — or, when its keys belong to several teams, splits it between them by the project id at the front of each issue key (see Pasting Several Teams at Once). Paste the export as it comes — a Jira export looks like this and works unchanged:
Key Created In Progress Resolved Issue Type
DAE-1064 4/02/2026 4/27/2026 5/11/2026 Story
DAE-1058 4/09/2026 4/28/2026 Story
DAE-1491 7/28/2026 8/5/2026 Story
The Created column is optional and unlocks lead time. Without it everything else works exactly as before, and that chart says so on its face rather than disappearing.
A Status column is read with no set-up: its statuses join your list and the work item age chart groups by them; grouping them into workflow stages is optional. Extra columns holding a number of days per status still need a stage that claims them. A day-count column that matches nothing you've set up is simply ignored, and always was.
Three Jira custom fields are read when your export carries them — ServiceNow Assignment Type,
Bug Type and Type of Work — under their Custom field (…) headings or their bare names.
See Work Mix.
The columns are worked out from the data, not assumed by position. Header names win when
they're there (Resolved/Completed, In Progress/Start, Created, Issue Type);
otherwise the app finds the date columns by content and ranks them by which date is later,
so an export with them in any order still reads correctly — created before started before
completed. The work-type column is
told from the issue-key column by repetition — keys never repeat, types always do. Whatever it
settles on is named back to you after every paste, because a wrong guess here would
silently corrupt every number on the dashboard.
- Tabs and commas both work, and a header row is skipped automatically. Quoted CSV fields are
handled —
"Jan 21, 2015"or"Bug, urgent"stays one cell, comma and all — and so is a quoted cell with a line break inside it, which is how Excel copies a multi-line Description: it stays one cell rather than becoming a second row that shifts every column after it. (Until 2026-09-01 such a row lost its key and had its start date read as its completion date, with nothing in the report to say so.) The line number a problem row is reported at is the physical line it starts on, so a row below a multi-line one is still where the report says — which is why that number can run a little ahead of the spreadsheet's row number. A quoted cell with a tab inside it stays one cell in a paste out of Excel too. (Until 2026-10-13 it did not: the row moved over by a cell for each tab, so its Created time could be read as its resolved date and a Backlog item counted as finished.) - Dates can be ISO (
2015-01-21), numeric (21/01/2015), month-name (21 Jan 2015) or a raw day-count serial (42043) — a serial only under a heading that names the column as a date, because a column of bare numbers found by content alone is more often a column of Jira issue ids (until 2026-09-01 a default issue-navigator export with no Resolved column took Issue id as the completion date, and every row finished in 2012). Where03/04/2015is genuinely ambiguous, the app auto-detects day-first vs month-first from the columns it reads dates from — a column of version numbers like2.13.10never gets a vote — or you can force it. When no date in the paste could be read either way round (every one names its month, or is ISO), the report says the question did not arise rather than stating an order. - A time on the end is fine —
9/23/2025 10:21,23/Sep/25 4:12 PM,2025-09-23T10:21:00Z. Jira and Excel export timestamps rather than bare dates, and every metric here works in whole days, so the clock is dropped. The date underneath still decides day-first vs month-first. A timestamp that names its time zone (Z, or-05:00) is a moment rather than a wall-clock time, so it is dated on your calendar:2026-09-16T01:00:00Zis 15 September in New York. - The separator is decided once, from the first line — a tab if it has one, else a comma, else two or more spaces — and applies to the whole paste. A tab inside a quoted CSV cell is then just a character in that cell (until 2026-09-17 it cut that one row in two, which was then dropped as having no dates).
- A planning date is never the start. Jira's all-fields export carries Target start and a Start date custom field; a heading that names a plan (target, planned, due, baseline, estimate, expected, forecast) never takes the start role, however many of its cells are filled, and where more than one heading could be the start, the column holding the most dates wins rather than the leftmost. With no start column left, Created stands in, as it always has.
Work in progress belongs in the paste. An item with a start date and no completion is not an error — it's work you've begun, and it counts on the net flow chart as work started. Rows with no dates at all — untouched backlog — are ignored, and the count is reported so a paste of 260 rows that becomes 170 items explains itself.
Only dates, a short type label, two keys, a status, a number of days per stage and three codes from fixed lists are ever saved. The paste is read for those on the spot and everything else is discarded — summaries, assignees, comments and the rest of the export are never stored. The dates and day counts are read as numbers, and the three work fields are kept as the number of an entry in a closed list, never as the cell's text. Four guards do the work for the fields that arrive as words, and they are different on purpose:
-
The work type is held to a short category label ("Story", "Bug", "Tech Debt"). A cell longer than a label — a summary that landed in the wrong column, say — is dropped whole rather than truncated, so no fragment of a work system's text reaches the saved copy.
-
The issue key is checked against the shape of a key rather than its length: up to ten letters or digits, a dash, up to six digits, and nothing else.
DAE-1552passes;Customer data export breaks on accented namesdoes not, and neither does anything carrying a space, a quote, an angle bracket or a second dash. There is no input that both passes this check and carries prose — which is exactly why a key could be stored where a summary field never will be. -
The parent key — the key of the feature an item belongs to — is held to exactly the same shape check as the issue key, at the same two doors. It is the same kind of value, so it gets the same guard rather than a new one.
-
The status cannot be guarded that way at all, because a status has no shape, and it is the one field here guarded by looking at the column instead of the value. It is read only from a column headed exactly Status or Current status, and only if that column repeats itself the way a workflow does — a column with a different value on nearly every row is a column of summaries, and nothing at all is taken from it. What is then stored on a row is a pointer into a capped list of statuses you can see and delete; the words themselves live in that one list. See Your Statuses, and Grouping Them Into Stages.
Every guard runs again whenever a saved copy, backup or share link is read back in. There are deliberately no free-text or comment fields anywhere in the app — there is nowhere you can type a sentence and have it saved.
A column of prose may hold no role at all. A heading naming itself a summary, description,
comment, note, title, reason or justification is taken out of consideration before the export
is read, so it cannot become the work type, a date or a key. That guard exists because the
work-type column is found from the values when no heading claims it — a column of twenty or
fewer repeated non-date values — and a 200-row export covering eight features has exactly eight
distinct parent summaries, which passes that test. The 40-character cap would catch most
summaries and not a short one. So Parent summary is refused by name rather than by luck.
The few labels you do type are capped where they're written, not just on the next load.
Team, ART and stage names, the defect word and a filter's Display name are capped at 120
characters where they are typed; the defect work type is held to a 40-character label; and a
filter's Value is up to eight work types of 40 characters each, rebuilt entry by entry whenever
a saved copy, backup or share link is read back. (The word for cycle time is picked from a list
of four, so there is nothing to cap.) maxlength stops ordinary typing past the cap but not a
paste, and the object you type into is the one that goes to localStorage, so the cap is applied
at the keystroke as well as in normalizeSettings(). Typed numbers are bounded the same way, at
the keystroke and on the way back in: the same-day value is clamped at zero, and the ageing
threshold floors at 1 day — a threshold of 0 would count every open item as aged the moment
it started, and the metrics treat 0 as "use the default", so without the floor the box could
say 0 while the charts still read 14. (Until 2026-09-04 this paragraph said the threshold was
clamped at zero too; the code never did that.)
Get It Straight from Jira, on the Your Data tab, gives you bookmarks that do the export for you, in two sets of three windows (3 months, 6 months and 1 year):
- For the team picked in the header, named with its project id: Flow Metrics DAE 3 Months, DAE 6 Months and DAE 1 Year fetch that team's project alone. Pick another team and the set changes with it; a team with no project id has no set of its own.
- For all teams: Flow Metrics All Teams 3 Months, 6 Months and 1 Year fetch every team's project at once, and the paste is split by project as it lands.
The name also shows in the bookmark's own prompt on the Jira tab, so you can tell which one you clicked. Each fetches the Stories, Tasks, Spikes, Bugs and Features that were started, raised or finished in that window, plus everything still in progress whatever its age (so aged work is never dropped), for the projects set on your teams in Teams, ARTs & Stages (the DAE in DAE-1552). The section says which projects those are, and shows no bookmarks until at least one team has a project id. Drag the ones you want to your bookmarks bar — or press one, which copies its address for you to paste into a new bookmark, so the keyboard can install it too. Then, whenever you want fresh data:
- Open your Jira site in a tab and click a bookmark.
- Check the search it offers (JQL; you can edit it before pressing OK).
- When it says the items are ready, press Copy.
- Paste into Flow Metrics and press Load Pasted Rows.
A bookmark carries the projects it was dragged with. Add a team or change a project id and drag the bookmarks again (a team's own set: pick the team first). Cancelled items are left out, so they never read as throughput, and old backlog nobody has touched is left behind, which keeps the fetch small. Features land in the feature list, ready for feature forecasting. If Jira refuses the search (for example, a site with no Spike type), the bookmark shows Jira's own reason, and you can edit the search before pressing OK.
It reads named fields only, the same set as the Power BI report: key, type, status, created, Actual Start Date, resolved, parent key, the three work fields, and the history of status changes. From that history it works out a Days in column for each status, so the separate time-in-status script isn't needed. Statuses in Jira's Done category get no column, because time spent in Done isn't a stage. A status an item never visited is blank; one it passed through in minutes is a real 0. Custom fields are found by name, so another Jira site works without editing anything.
Why a bookmark and not a button in the app. Jira Cloud refuses requests from other
websites (it sends no CORS permission), so this app could not reach Jira even with a token.
Keeping a Jira token here would also be a bad trade: every page on this GitHub Pages site shares
one storage area, and a token would give any of them full access to work Jira. The bookmark
runs inside Jira on the sign-in you already have, so nothing needs a token, and the app still
connects to nothing (connect-src 'none'). The online and single-file versions work the same,
because the clipboard is the only way in. Its whole source is under Show the Bookmark's
Code.
- To stop using it: delete the bookmarks from your bookmarks bar. It stores nothing in this app and writes nothing to Jira, so there is nothing else to undo.
- To take it out of the app: the feature is a handful of commits on
mainafter the tagpre-jira-bookmark; revert each commit whose subject names the Jira bookmark and push. It added no stored field and changed no schema, so saved data, backups and share links are untouched either way. The previous dated release stays downloadable as an offline copy without it.
A bad cell costs you that field, not the whole row — with one exception, because every metric keys off a completion date.
| What's wrong | What the row does |
|---|---|
| Completion date unreadable | Row skipped — nothing can be plotted without it |
| Completion date empty | Kept — it's work in progress |
| Start date unreadable | Kept, without a start date |
| Created date unreadable | Kept, without a created date |
| Start date later than the resolution | Kept, and the start date dropped |
| Ticket created after its work had started | Kept, and the created date dropped |
| No completion and no start | Dropped — untouched backlog says nothing about flow |
| A date that cannot exist (31 Feb, month 13) | Rejected rather than silently rolled over |
Every problem row is listed back with its line number, its issue key, and only the other cells the app reads — the work type and the three dates, never the whole pasted line. The key leads, because it is the thing you paste back into Jira to go and fix the row being complained about: the line number finds the row in your export, and the key finds it in the system the export came from, which is where the correction has to be made.
The key was deliberately left out until September 2026, on the argument that a row reaches this list precisely because its columns look wrong — so the cell the key is read from is the one cell that cannot be trusted. What answers that is the guard rather than the silence: a key has to match a shape (letters, a dash, up to six digits), so a summary that has landed in the key column arrives as no key at all rather than as a fragment of one. The summary itself is still never echoed, and neither is any other cell that is not shape-guarded — that is the rule that matters, and it is untouched. An export with no key column still names its problem rows by type and dates, which is what finds them again when there is no key to search for. Long lists are capped, but the count above each list is always the true total.
created ≤ started ≤ completed is the one hard ordering these dates have, and which end of it
breaks tells you something specific — because in a normal Jira setup:
- Created is written by Jira and cannot be edited.
- Resolved is written by Jira and cannot be edited.
- The start date is set by automation when work moves to In Progress, but can be adjusted by hand afterwards.
So the start date is the only one of the three that can be wrong, and both ordering checks are really checks on it.
Start date later than the resolution. Work cannot finish before it starts, so this is a bad adjustment however it was meant. It has to be caught rather than tolerated: cycle time floors a negative span at zero, so a row like this would otherwise contribute a zero-day cycle time that never happened and drag the average down where nobody could see it. The start date is dropped — the row still completed, so it still counts for throughput; it just no longer claims to know when it started.
Ticket created after its work had started. Since Created can't be edited and the automation
stamps the start on the transition, created ≤ started holds by construction — so a violation
means someone moved the start date by hand, almost always to record that work truly began before
the ticket existed. That makes the adjusted date the better estimate of when work started, so
cycle time keeps it in full. Lead time doesn't: it measures the wait from a request to its
delivery, and here the work was already under way when the request was made, so there is no such
wait to measure. Keeping it would also produce a lead time shorter than the same row's cycle
time.
A handful of those is ordinary. A large share is either a mismapped column or a team that routinely raises tickets after starting the work — different problems, both worth knowing, and the app says so rather than calling it a few odd rows.
To fix one row, press it in Loaded Data and edit it; to fix many, correct the export and paste again.
A real Jira export is usually a whole train, not one board. Splitting it by hand — filter, copy, switch team, paste, repeat — is the chore that stops a dashboard being kept current, so the same paste box on the Your Data tab takes the whole export in one go and routes each row to the team it belongs to. There is no separate window and no switch to set: the box reads the keys and decides.
The routing is the project id at the front of each issue key. Each team is one Jira project,
so DAE-1552 belongs to whichever team is set to DAE. You set that id once per team, in the
Teams & Stages window — or let the app fill it in for you: when a team with no id yet is given a
paste whose keys are unanimously one project nobody else answers to, that project becomes its id
and the plan says so before you press anything. Unanimity is the bar, not a majority: a paste that
is 90% one project is a question, not a fact. The full id → team map sits under Every team's
project id, closed until you open it.
Which load a paste gets is read off the keys:
| The paste | What happens |
|---|---|
| No key column, or one project id no team answers to | It all goes into the team in the picker, as a one-team paste always has |
| Every key belongs to the team in the picker | The same, with the ordinary report |
| Keys another team answers to, several teams, several unclaimed ids, or claimed and unclaimed ids together | A split: the buttons read Split into N Teams and Append to Each Team |
The plan is drawn as you paste — a moment after you stop — so you see which teams the export reaches, how many items each would take and how many each holds now, before anything is written. If you paste and press inside that moment and the paste turns out to be a split, the press only puts the button's label right; press again to load.
The whole export is parsed once, as one export, so every team is read with the same column map and the same date convention — detecting the columns per team would let one file be read two different ways.
- Split into N Teams replaces what each team the paste names holds — items and features both, so a team this paste names with no feature rows in it is left holding none, exactly as a single-team paste does. A team the paste does not name is left exactly as it is. Where that would overwrite anything it asks first, naming each team and what it stands to lose.
- Append to Each Team adds to what is already there instead.
Anything the app cannot place is named, never guessed at — a row in the wrong team's throughput is a wrong number nobody can see, while a homeless row is a message on screen. There are three ways a row can fail to land, and they have three different fixes:
| What the report says | What it means | The fix |
|---|---|---|
| N project ids no team claims | Rows for a project nothing answers to | One press creates a team for it, named after the id and with the id already set — or give the id to a team you already have |
| N project ids are on more than one team | Two teams share an id, so nothing can decide | Change one of them in Teams & Stages |
| N items had no readable issue key | Nothing to route by | Add a Key column to the export |
When something is still unplaced, the paste stays in the box — create the team and the plan takes those rows in straight away. A paste with no key column at all has nothing to split by, so it goes into the team in the picker and the plan says why.
The project id is a label and an address, never a level of maths — the same rule ARTs and issue keys follow. Nothing counts, groups, filters or sorts by it. It also never travels in a share link: someone reading a link has no paste box, and every key in the payload carries its project at the front anyway.
A window off the header, behind the ⚙ button — between Teams & Stages and Back Up, with Share after them and the theme picker last — and laid out the same way as those windows. It was the fourth tab until 22 Aug 2026, which put a page you visit twice a year in a strip whose other entries are ways of reading your numbers. Settings is a thing you go and set, like teams and backups, and all three of those were already buttons.
Because it opens over the dashboard rather than replacing it, a change lands on the charts behind it — rename the defect word and the chart titles follow while the window is still open.
Nine sections, each ruled off from the one above it — Labels & Work Types, Aged Work, Grading, Features, Your Week, Our Sprint Cadence, Working Days, Unusually Long Items and Work Type Filter List. Until 2 Sep 2026 the window had two headings covering six unrelated things, so everything from the ageing thresholds down read as one long column of prose with no way to see where a setting ended; the Teams & Stages window beside it is ruled off the same way. Grading was cut out of Aged Work in September 2026, when the Scorecard took the number of boundaries in this window from two to six.
Everything the charts depend on, shared by all your teams:
-
Defect work type — the exact text in your Type column that means "defect" (
Bugby default). Anything blank, or not matching, counts as ordinary planned work. -
Work types that mean a feature — comma separated,
Featureby default, because that is what Jira's own hierarchy calls the level above a Story. Change it to whatever your board says, and clearing the box switches the feature layer off entirely. Matched the same way the defect type is: trimmed, case-folded and exact, never a partial match. -
Count an in-progress item as aged after (days) — how long an item can sit in progress before the Aged work chart counts it (
14by default; worth keeping under a month). -
Count an in-progress feature as aged after (days) — the same question asked of features, and empty by default, because empty is off. A fortnight is a convention about work items and it does not survive the change of unit: read against features it flags a board that is behaving normally. Nothing is assumed from the box beside it, and no multiple of it is guessed. While it is empty the feature view's Aged work card and tile say so and show what that team's finished features actually took, so the number you pick is measured against your own board. See The ageing threshold is per unit.
-
Grading — its own section, holding three pairs of boundaries: the ones the aged share is graded against, and the two pairs the Scorecard adds for the defect share and the average feature cycle time. These six are the only numbers in this app that put a colour on a figure. They were in Aged Work until September 2026, described there as the only two — the same kind of setting in three sections would be three places to look for one answer. Every pair is empty by default, and nothing is graded until both of its boxes are set — one boundary on its own is a pass/fail rather than a three-state scale, and the app will not infer the other half of a line you have not drawn. The first must be at or below the second; the wrong way round grades nothing, and a note under those two boxes says so. Zero is a real value on the two share pairs, unlike the day thresholds above: a team may well mean nothing past the threshold, ever. It is not a value on the days pair, where a boundary of no days at all is a half-typed box rather than a target. There is no number worth shipping in any of them — a platform team carrying long spikes and a support team turning work over in a day would be handed the same verdict, and one of them would be wrong. Each pair is stored to the precision its figure is printed at, and graded there too: the aged share in whole percents, the defect share to a tenth of a percent (which is what its dashboard tile shows), the feature cycle time to a tenth of a day. A boundary the app would round is a boundary you never typed.
-
Weeks start on — Sunday by default, which is what every build before 10 Sep 2026 did. Pick any day and a week runs from it: choose Wednesday and your weeks run Wednesday to Tuesday.
The day the week ENDS on is the half that moves figures. Work in progress, aged work and the aged share are not counts over a period — they are levels read at the end of one, so on a board whose sprints end on a Tuesday, a week that ended on Saturday was reading the board three days into the next sprint. The aged share averages fourteen of those readings, so it was fourteen readings taken on the wrong day.
It moves every weekly and fortnightly bucket in the app, not just one tab: the same week has to mean the same week on the dashboard, on All Teams and on the Scorecard, or the three cannot be read as one product. Group by 2 weeks pairs the same weeks, and the week numbers along every axis move with it — they have never been ISO week numbers (ISO weeks begin on Monday and are numbered by their Thursday); this app has always numbered from the week containing 1 January, and all that changed is that it now asks which day yours begin on instead of assuming Sunday. Calendar months are untouched: a month is a month whatever the week says.
Global rather than per team, like everything else in this window. Two teams on one train keeping different weeks would make the All Teams table a comparison of different periods, which is the fault one shared date exists to prevent one level along.
-
Count working days only (Monday to Friday) — off by default. On, cycle time, lead time and the ageing threshold skip weekends: an item started on a Friday and finished on the Monday takes one day, not three. It is one switch for all three, because a screen mixing the two measures would be unreadable, and every chart and column that states a duration re-labels itself to say which days it means. Public holidays are not known to the app and still count as working days — a holiday list would be per-country and per-year, and nothing in this app is a place to type a list of dated names into. Throughput, net flow, work in progress and the defect rate are counts rather than durations, so they don't move.
-
Same-day cycle time — what an item that starts and finishes on one day is worth (
0.5days since 21 Aug 2026: a whole day made an item opened and closed inside one day indistinguishable from one that genuinely took a full day, in every average and percentile) -
Ignore items that took unusually long — off by default. Its own section below.
-
Word for defects on charts (
Defectby default — singular, because it reads as "Defect rate") and the word for cycle time (Cycle Time / Time in Process / TiP / In Process Time) -
Work type filter list — the Display → Value pairs behind the dashboard's filter. Out of the box just two:
All, which is the locked no-filter row, andDefects → Bug, which is paired with the defect type above so the filter and the defect rate agree without being told to. Add the types your own board uses with + Add a Type — the parse report names the work types it found in your paste, so you can copy them straight across. It used to ship Spikes, Stories and Tasks as well; they were guesses at somebody else's board, and on a team whose types read Feature, Chore and Incident they were three filters matching nothing, which reads as broken data rather than as a setting nobody has setOne row can name several types. Separate them with commas —
Stories and Tasks → Story, Taskis a single choice in the picker covering both — so a board that splits work finer than you read it can be grouped back together without touching the export. The comma is the same separator the feature types and the stage aliases already use. Each entry is still matched exactly, soTaskdoes not quietly pull inSub-task; on a dashboard an over-full view is worse than an empty one, because empty is visibly wrong and slightly-too-full is not. A type with a comma in its own name cannot be matched, which is the price of the separator and the same price the other two lists already pay.The arrows reorder the list, exactly as they do for teams and trains — the order here is the order the picker offers. The
Allrow is greyed out: its two boxes have always been read-only, because their text is what makes the row mean "no filter", and now they look it. It can still be moved; only its wording is fixed
Nothing else is here on purpose: a setting that changes nothing is worse than a missing one.
Two figures a team sets rather than measures, both optional and both empty out of the box:
- WIP ≤ — how much work this team means to have open at once.
- 85% ≤ — how long it means an item to take: the promise the 85th percentile is read against.
Both are whole numbers — whole items, and whole days. Type a fraction and it is rounded to what it means; the box shows the figure that was kept as soon as you leave it, and the arrows on the box move a whole item or a whole day at a time.
They live in Teams & Stages, behind Edit on the team's row, and not in the Settings window beside it — which is the one design decision here worth stating. Every setting in this app is shared by every team, and can be, because each describes how a figure is worked out: what counts as a defect, what a same-day item is worth. These two describe a team's own board. A limit of eight means something different to a team of three and a team of twelve, and a promise is made by the people who have to keep it.
What they do:
- The limit is drawn flat across the work in progress chart, and the Work in progress tile says whether today is inside it and by how much: limit 6 — over by 3.
- The target is drawn on both scatter charts — every finished item, and work item age — and the 85th percentile tile says target 10 — met or not met. It is compared with the percentile rather than with the average deliberately: a target is a promise about the next item, which is the one question an average cannot answer. On the age chart it means something slightly different and equally useful — an item still open above that line has already blown the promise, and knowing that this morning beats reading it next month.
Neither changes a single figure. They are what the figures are compared to, which is why leaving both blank costs nothing: the app states the numbers and does not judge them, exactly as it did before these existed. That is also why nothing is set by default — a limit the app picked would draw a line across your chart claiming you had agreed to it.
Neither of these turns a colour. The verdict is a sentence on the tile, and the bars over a limit are the same colour as the bars under it. The only graded figures are the ones you set boundaries for under Grading, and a period over a limit is something to look at rather than a failure to mark.
Both travel in a share link, so the person you send it to sees the same lines you do. Both are per team, so the All Teams table — which compares teams against each other rather than against their own promises — deliberately doesn't carry them.
It is in Settings, in a section of its own — Aged Work — where it shares a two-box grid with the feature ageing threshold. The grid holds only the two labelled boxes; the explanations run full width underneath the pair, because a paragraph inside a grid cell pushes the field beside it into empty space and sends the reading order across the window instead of down it.
These two read almost the same on screen — 85% ≤ 10 d on a team's row, and count an in-progress item as aged after 10 days in Settings — and they answer different questions:
| 85% ≤ N d (per team) | Aged after N (Settings, shared) | |
|---|---|---|
| Looks at | Work that has finished | Work that has not |
| Asks | Did 85% of what we delivered get through in N days? | How long can something sit open before we want to see it? |
| Default | Not set | 14 for work items; not set for features |
The threshold usually wants to be the lower of the two, and that is the part worth acting on. If your promise is ten days, an item that has already been open ten days has missed it — being told so is a post-mortem, not a warning. Flag it at six and it is still something you can swarm on, split, or unblock. Aged work is the one chart here that can tell you about a miss before it happens, and the threshold is what decides whether it does.
Picking the lower number off your own data beats guessing: if your median cycle time is 4 days and your 85th percentile is 10, then anything sitting at 6 or 7 is already unusual for you.
Going the other way is a real choice too. On a board carrying a lot of genuinely long work, a tight threshold flags everything and the chart becomes noise you stop reading — raising it above the target turns it into an escalation list rather than a nudge list. And setting them equal is coherent if what you want is the literal reading, show me anything already past what we promised. It just tells you about work you can no longer save.
One structural note: the target is per team and the threshold is shared by every team, so with more than one team they cannot all match anyway. A promise is made by the people who keep it; the threshold is closer to a house convention.
Off by default, and most boards should leave it off. One item that sat open for a year can drag the average cycle time far enough that the tile stops describing anything the team recognises. This is the switch for that — with a caveat worth reading before you reach for it.
This dashboard already resists a long tail, on purpose. It leads with the median and the 85th percentile, and 85 was chosen precisely so that the one item that took five months doesn't set the number. If a single enormous item is spoiling your picture, the average is the only figure it is spoiling — and the median sitting right beside it is the better number to read. Turning this on to fix the mean is fixing the one figure that was never the one to trust.
An ignored item still counts as delivered. That is the whole design. You cannot fix an average by claiming the team shipped one fewer item, so:
| Moves | Does not move |
|---|---|
| Average cycle time | Throughput and the steady-delivery band |
| Average and 85th percentile lead time | Net flow, started vs completed |
| 85th percentile and median cycle time | The cumulative flow diagram |
| Time in stage | Work in progress |
| The two lines on the item-age chart | Aged work |
| Defect rate | |
| Both forecasts |
Work still in progress is never ignored, however long it has been open. Everything the setting touches measures finished work, and something still in flight has no cycle time to be an outlier of. An item that has sat open for three hundred days is the single most actionable thing on the screen — a setting that quietly stopped counting it would be the one genuinely harmful thing this feature could do, so the aged-work figures are pinned untouched by a test.
- Off — count every item. Identical numbers to an app without this feature.
- Automatically, from this team's own spread — the cutoff is the upper quartile plus three interquartile ranges of what finished in the window on screen. That is the standard test for an extreme outlier. The usual textbook fence is 1.5 interquartile ranges; this app uses 3 because cycle times are strongly right-skewed — most work finishes quickly and a thin tail runs long — and a 1.5 fence would eat a good slice of a perfectly legitimate tail, quietly reshaping the 85th percentile you forecast with. It needs at least 12 finished items before it will offer an opinion, because quartiles off a handful are noise — and it offers none when the middle half of them took exactly the same time, where the fence would sit on the commonest value and ignore everything longer.
- Anything over a number I set — your own cutoff in days. No twelve-item floor: a typed fence isn't derived from the data, so a small sample can't make it wrong.
The note above the charts gains "ignoring 4 items over 87 days" — the count and the cutoff, because a count alone is a claim you can only take on trust and a cutoff is one you can check. Every cycle-time, lead-time and stage-time card repeats it. If the rule catches nothing, nothing is said: a fence nothing crossed changed no number.
Watch the count against the total. 2 of 190 is a long tail; 60 of 190 is a distribution, and this is the wrong tool for it.
On Every Finished Item, an ignored item is drawn as a hollow ring above a dotted line at the cutoff, rather than removed. That chart's whole job is showing the spread, and a feature that dealt with a long tail by deleting the tail from the picture of the tail would be hiding its own working. Click one to copy its key, exactly like any other dot.
If you've set an 85% ≤ target, the met / not met verdict counts the ignored items. A target is a promise about real work, and the items that broke it are exactly the ones an outlier rule takes out — read over the fenced pool, a promise would start passing the moment somebody flipped a switch in Settings. So the percentile on the tile and the verdict beside it can legitimately disagree, and the tile says which is which: "7 … target 10 — not met, counting the ignored items".
A platform team whose ordinary work runs sixty days and a support team whose ordinary work runs three do not have the same idea of unusual. One cutoff over both would ignore half of one team's board and none of the other's. So each row draws its fence over its own spread — which also means a team's figures are identical on the All Teams table and on its own dashboard.
The bottom All teams row uses the whole estate's pooled fence, which is wider than any one team's, so it will usually ignore less. The note under the strip says how many items the rows ignored between them.
The setting is part of Settings, so it rides into a share link and a backup with everything else — a recipient sees the figures you saw, under the same note saying what was ignored.
Sprint commitment, and the share of it a team completed — the figure most Scrum teams call their predictability. It needs two things this app deliberately does not store: what a team committed to at the start of a sprint, and what was in the sprint's scope. Both are planning records rather than dates off a board, and neither survives the rule that only numbers, dates and capped labels are ever saved. The sprint cadence gives a Scrum team its own periods to read every other figure over; it is not a route to this one. The sibling app, Sprint Predictability, is where commitment-versus-delivered lives.
A sprint entity, and sprints that slipped — the cadence here is a perfect arithmetic grid counted off one anchor. A train that skipped a sprint two years ago has its older periods off by one length. Fixing that means storing a list of real sprint start dates, which is a different feature with a different shape, and it is deliberately out.
Per-team anything else — the five settings behind Edit are the whole list. Everything else in Settings is shared by every team on purpose: an ageing threshold or a set of grading bands that differed per team would make the All Teams table and the Scorecard comparisons between figures measured differently, which is the fault the shared end date exists to prevent one level along.
Blocked time — how long an item couldn't move because something was in its way. A plain Jira export doesn't carry it: "Flagged" is a state, not a duration, and reconstructing the duration needs the issue's status history. Half of what that needed now exists: a Time in Status export is read — or the days are typed in — and they land against stages you named. What's still missing is a way to say which of your stages is blocked time rather than working time — which is a decision about meaning, not a parse, and it hasn't been built. Set up a stage for your blocked statuses and the table will at least show you how much of the wait they account for.
Flow efficiency — what share of an item's total wait was actually spent working. This app
carried an approximation of it for a while: cycle time ÷ lead time, i.e. the share of the
raised-to-delivered span that the item was in progress. It was removed, because that only
measures the queue before work starts. On a team that picks work up the day it's raised — as
the team this was built for does, its start date set by automation on the Ready → In Progress
transition — the figure pins at ~95% and never moves, while the waiting that actually matters
happens inside the in-progress span: in review, blocked, waiting on an environment.
Time in stage now shows that waiting directly — it is
exactly what Team Long Tail's row in the demo is for — but turning it back into a single efficiency
percentage needs each stage marked as working or waiting, and that flag doesn't exist. The
table is arguably the better answer anyway: it says where the wait is, where a percentage only
says how much. Half a metric that always reads 95% is worse than no metric at all.
Value delivered and story readiness need data that doesn't exist in a flow export at all — business outcomes, and how often a story was rewritten after being picked up. Neither is derivable from dates.
A forecast weighted by item size, and one that starts from what is already in progress. Both are real refinements and both are deliberately out for now. Sizing would need a field this app doesn't store and would reintroduce the estimating the forecast exists to avoid; crediting work already under way would need a rule for how far along an in-progress item is, which is the same status-history problem blocked time has. Counting whole items from a standing start is the conservative reading of both, and a wide spread is the honest signal that items on this board are not comparable.
Defaults only fill in what isn't saved. A browser that has used the app before keeps whatever was set there, so a changed default doesn't reach it — the values above show up on a fresh browser, or after "Reset Settings to Defaults", and nowhere else. That is why the defaults can be changed freely: they are the starting point for a new browser, not a setting pushed onto an existing one.
Two renames have happened in the stored data, and both are handled on load so nothing has to be re-entered:
- The defect-work-type setting was saved as
defectTypeand is nowunplannedType. An old saved value is carried across, so a team that had set it toIncidentstill hasIncident. (The key kept its name when the charts went back to calling this "defects": the value is your data, a share link carries it, and there is no version negotiation on a share link that would let an older build understand a renamed key.) - A
plannedLabelsetting existed, with an input and a saved value, but nothing on screen ever read it. It is dropped on load rather than left riding along in every backup for ever.
Rows gained an optional created date (k on the wire, backup version: 3, schema: 3 in the
saved state; the working-days setting later took both markers to 4, ARTs to 5,
the issue key to 6, the per-team project id to 7, workflow stages to 8, the per-row
current stage to 9, the per-team limit and target
to 10, ignoring outliers to 11, the
feature layer to 12, the feature ageing threshold to
13, the status list to 14, the aged-share
grading boundaries to 15, the Scorecard's other two grading pairs to 16, the day a week starts
on to 17, a per-team sprint cadence and the aged-share opt-out to 18, the company-wide cadence
with each team's stored sprint answer to 19, and the three work fields to 20). A row without
one is left exactly as it was
— no k key is written —
so a team that has never pasted a created date saves byte-identically to before. The issue key
(i on the wire) follows exactly the same rule: absent unless there is one, so a team whose
export has no key column saves byte-identically to before that field existed, and the first save
after upgrading doesn't rewrite the whole stored document. The project id follows it too — a team
without one writes no projectId key at all, so a browser that never splits a paste stores
exactly what it stored before the feature existed. And the status (u on the wire) follows it as
well: a board with no Status column — or one whose column the repetition gate refused — writes
no u on any row and no status list at all, so it saves byte-identically to before this field
existed.
Stage times follow the same rule: no g key on a row until there are day counts to put
in it, and no stages list on the document until you set one up, so a browser that never uses
the feature saves exactly what it saved before it existed. So do the limit and the target: a
team that has set neither writes neither key, and both are re-typed in seconds if an older build
ever drops them — which is why they are not on the list of fields the app stops and asks about.
The limit and the target do travel in a share link, unlike the project id: they are drawn on the charts a link exists to show, and a link without them would give the reader a different picture from the sender's. An older cached build simply drops both and draws the charts without the lines.
Created dates, issue keys and stage times are never dropped silently. A backup saved by a build older than the one that added a field simply has none of it in the file. It restores without complaint, and the column is gone — and since sync was removed there is no second copy anywhere to get it back from. So a restore that would lose them asks first, in one prompt covering all three fields, and Cancel means nothing is restored at all rather than "restored, minus a column". ARTs and project ids are deliberately not in that prompt: a train's name and a project id are one word re-typed in a dialog, where a column of day counts pasted per item is not. The boot version check doesn't cover this: that fires on a copy from a newer build, and this one is older.
- The first version stored one team's rows under
td-rows, with the team name intd-settings. Those fold into a single team the first time a newer version loads, and the old keys go.
derive() in index.html is the only place any figure is computed. The parts
worth knowing:
-
Weeks start on Sunday unless you change Weeks start on. Week keys are
YEAR-WW, where the week containing 1 January is week 1 of the new year — the week straddling New Year is2026-01, never the old year's53, so the numbering never runs 52, 53, 02 (which it did until 2026-09-01: keyed off its Sunday, the straddling week took the old year and week 01 never appeared). A year with 53 Sundays still gets a 53. Written out by hand, because JavaScript has no week-number function. -
Fortnights are anchored to a fixed date — the first Sunday of 1970 — not to whatever window is on screen. Which fortnight a date falls in is therefore a property of the calendar, and switching from 3 months to 12 doesn't slide every bar one week sideways. Months are plain calendar months.
-
The axis snaps outward to whole periods. A 3-month window starting on the 5th, grouped by month, plots the whole of that month. The window note states the dates you asked for; the chart draws complete periods, because half a bar is worse than a slightly wider window.
-
A part-finished last period is plotted and labelled, not dropped. The data usually stops mid-period, so the final bar is genuinely lower and always will be. Dropping it would hide the most recent data — the first thing anyone looks at — and would disagree with what Jira says the team finished this month. Instead the window note and the tooltip say how much of the period is covered ("Last month covers 5 of 31 days"). It is excluded from the two per-period figures that would be distorted by it — the completed-per-period average and the steady delivery band — and counted everywhere else; see Whole Periods for why the line falls there.
-
Throughput is conserved when you regroup; net flow is not. Regrouping can't lose a completion, because the axis starts at the earliest completed period by definition. It can change the started tally, because a coarser period reaches further back — a month begins on the 1st where a week begins on a Sunday, or whichever day Weeks start on names — and sweeps up starts the weekly axis never saw. Net flow moving when you change the grouping is the metric behaving correctly, not a bug.
-
The date window trims the axis, not the data. "Show data for most recent 3 months" moves where the chart starts; every item still counts toward the weeks that remain. That's deliberate. The axis also never starts before the team's first completed period — a window longer than the data doesn't pad empty periods in front, which would read as real zero-throughput periods and dilute the tile averages for a young team. At the other end it runs to the newest date in the data, completion or start: a week in which things started but nothing finished yet is plotted with a true zero, so the started tally, net flow and the work-in-progress tile all see it — and "as of" on the tiles means the date it says.
-
Cycle time is
completed − started, floored at 0, with same-day items taking the configured value — half a day out of the box, so an item opened and closed inside one day stays distinguishable from one that genuinely took a full day. Change it in Settings; a browser that already has a value keeps it. Lead time iscompleted − createdby exactly the same rules — the whole wait, including the time an item sat in the backlog before anyone picked it up. Lead time is therefore always the longer of the two, and the gap between them is queue. -
Days are calendar days unless you turn working days on. Flow metrics measure the wait the customer actually had, and the customer's weekend isn't free — so calendar days are the default and Monday-to-Friday is the deliberate choice. Working days are counted with a weekday ordinal rather than by walking a span a day at a time, so a two-year lead time costs the same as a two-day cycle time; the ordinal steps by one on each weekday and stands still over a weekend, so the difference between two of them is the working days between the dates. A span that falls entirely inside a weekend is zero working days and takes the same-day value, which is the same statement that setting always makes. The ageing threshold moves with it: 14 working days is nearly three calendar weeks, so items age later and the Aged work count drops.
-
A share is null when it has no denominator, never nought. The aged share divides aged counts by work in progress counts, so a period with nothing open has no share to state — and is left out of the window's average rather than averaged in as a nought — the same reading WIP vs throughput takes of a month that finished nothing, where "∞×" is not a figure anyone can act on. A zero would say the board was clean when it had simply stopped.
-
A duration can be left out of the pool without the item leaving the count. With ignoring outliers on, an item past the cutoff contributes no cycle time, no lead time and no stage times, while still counting as delivered, started, raised and — before it closed — in progress. That is the same shape the app already had for an item finished with no start date: a duration of null, not zero, which every average and percentile skips.
-
The 85th percentile is the number to forecast with, which is why it, rather than the average, is the cycle time figure in the headline row. 85% of the items completed finished within it, so it is a promise you can make about the next one. An average is not: on a right-skewed distribution — which delivery data always is — the mean sits well above the typical item and well below the slow tail, describing nothing. The gap between the two lines is how unpredictable the work is, and predictability is usually worth more to whoever is asking than raw speed.
-
Percentiles are nearest-rank, never interpolated. The figure is always a duration some real item actually took, so "85% finished within 17 days" is a true statement about work you shipped — which is also why it prints without a decimal (28, not 28.0); only a fractional same-day value in Settings can give it one, while the averages beside it keep theirs. The window figure pools every item in the window rather than averaging the per-period percentiles, because a percentile of percentiles is not a percentile.
-
The same 85 governs the delivery band. The steady-delivery tile reads the 15th and 85th percentiles of the per-period counts, mirrored around the middle so one convention serves both metrics: 85% of periods delivered at least the low figure, 85% at most the high one, and the middle 70% sat between them. It answers the half of the Delivery question an average can't — two teams averaging five a week are not the same team if one runs 4 to 6 and the other 0 to 15, and only the second needs explaining to whoever is asking for a date.
-
Started vs completed is the pair net flow hides. A net figure of +2 reads identically whether it came from 12 started and 10 completed or from 2 and 0, and those are a team at pace and a team barely moving. Started counts every item with a start date whether or not it finished, so the pair also says how much of what was picked up in the window is still open.
-
A created date alone is not enough to keep a row. An item raised and never picked up is backlog, not flow; counting it would make the intake series track grooming rather than work. The rule is unchanged: no completion and no start, no row.
-
Work in progress and aged work are states, not counts. Every other metric counts events over a period; these two are read at a single moment — each period's last day — and reconstructed from the same start and completion dates as everything else, so you get a history rather than just today's number. That's also why they're drawn as bars: a line between two readings would imply a value in between, and there isn't one.
-
The reading point is clamped to the end of your data. The last period usually runs past it, and letting the clock tick into the future would age every open item a few days for free. The clamp is also what makes the last bar of each series equal the tile above it.
-
Aged means older than the threshold. An item exactly 14 days old is due today, not overdue.
-
The WIP-vs-throughput ratio compares work in progress against a month's completions, however the charts are grouped. The coaching rule is to keep it under 0.5, nearer 0.25 for most teams — that lives in the ⓘ text and nowhere else. Nothing turns a colour when you cross it, because this app states figures rather than grading them, and a rule of thumb from a coaching email is not a target you set.
-
One caveat on aged work: the clean-up tool's option to also remove unfinished items deletes long-running work in progress, which is exactly what this chart counts. History before a clean-up like that will read low. Removing completed items — the normal case — doesn't affect it, because those had already left the board.
-
Unfinished items count as work started, and nothing else. They move net flow but add nothing to throughput, the bug rate or the cycle-time average, all three of which key off a completion. Dropping them — which an earlier version did — made net flow read systematically too positive.
-
A period with no defect work scores 0%, not blank; a period with no completions has an average cycle time of 0.
-
A team whose items are all still in progress has nothing to chart yet, and the dashboard says exactly that — "Nothing finished yet", not a complaint about the filter. The filter message only appears when a filter really is what's excluding everything.
Net-flow bars use --series-1 for positive and --series-5 for negative, the two ends of the theme
pack's series ramp — deliberately not the red/green pair, because the coaching goal is "keep around
zero", so neither sign is good or bad.
The third card in Delivery, and the only chart here that shows work arriving and work leaving in the same picture. Everything the team holds is stacked at the end of each period, in three bands:
| Band | What it is |
|---|---|
| Finished (bottom) | Delivered by that date |
| In progress (middle) | Started and not finished — the same figure the work in progress chart plots |
| Raised, not started (top) | Raised and still waiting to be picked up |
Read the bands, not the lines. The middle band's thickness is work in progress, so a band that widens from left to right is work piling up faster than it leaves — whatever the throughput tile says, and visible weeks before the cycle time chart catches up with it. The bottom band's slope is delivery: flat means nothing finished that period. Two edges running parallel is a team in balance, which is the shape to want; it is also the shape that says a forecast can be trusted.
Three details, each of which is a decision rather than an accident:
- The finished band starts at zero on the left edge. What the team delivered before the window isn't stacked underneath it — with nine months of history under a three-month window, that would put 130 items in the bottom band and leave the two bands that matter as a sliver at the top of the card. Nothing else moves for it: a band is the gap between two curves, so subtracting the same figure from all three leaves every thickness exactly as it was. The in-progress band is still a real count of open work, not just of work opened inside the window.
- The top band needs a Created column, and is left off entirely without one rather than drawn as a flat zero claiming there is no backlog — the same stance the lead time chart takes on the same column. Team Bare Export in the demo is the two-band version.
- An item with no start date was never observably in progress, so it goes straight into the finished band on the day it closed rather than being given a spell in the middle one.
The middle band is worked out a different way from the work in progress chart beside it — a subtraction of two cumulative counts, against a walk over the items — and a test pins the two as equal. If they ever disagree, one of them is wrong.
Beside the cycle time chart sits the same measure at a different resolution: one dot per finished item, at the time it took, over the week it finished. The line chart averages within each period — which is exactly what hides the one item that took five months.
This is the only view in the app where a single item is a thing you can point at. A dot far above the rest is a conversation, and the week it sits over tells you which one to have.
The two lines across it are this team's own finished work: half of it came in under the lower one, 85% under the upper one. They are the same two lines the work item age chart draws, in the same words, so the pair reads together — this shows where finished work landed, that shows where open work has got to.
What you are looking for is the spread, not the average. A tight band means the next item is predictable. A long tail means it is a lottery however good the typical case looks — and it is exactly what makes the forecast wide. On the demo, Team Healthy Flow's dots sit in a band under 14 days while Team Long Tail's run to 48: the same argument the 85th percentile tile makes, in a picture.
Dots are drawn translucent, so several items finishing on one day at the same speed show as a darker mark rather than as one. The alternative — nudging dots sideways to separate them — would be a lie about when something finished.
An item that finished with no start date has no cycle time, so it gets no dot rather than one at zero. If nothing in the window has a start date the card says so instead of drawing an empty grid.
Cycle time says an item took eleven days. It cannot say that seven of them were spent waiting for someone to review it. Time in stage does, and it is the one card on the dashboard that is a table rather than a chart — five stages is five numbers, and a bar chart of five numbers says less than the numbers do.
It reads the window and the filter, like everything else on the screen: what finished inside the dates you picked, plus what is open now. The card's own title says how many items that is, and it is the same figure the window note above states. (It shipped reading every row the team held, which made it the one card that did not move when the picker did — one month, three months and all data gave the same medians under a note that had just said which three months were being shown.)
Stages read two different kinds of export, and you set them up once for both:
| What your export has | What you get |
|---|---|
| A Status column (where each item is now) — an ordinary Jira export | The work item age chart grouped by stage: what is sitting in each part of the workflow, and how long it has been there |
| A Time in Status export (a column per status, holding days) — usually a marketplace add-on | The Time in Stage table below: how long work typically waits in each stage |
| Neither — you type the days in yourself | The same Time in Stage table. Every stage you set up gets a box on the work item form |
Most people have the first and not the second. That is fine — the first is the one that answers where is the work stuck, and it needs nothing installed. And if you have neither, the third row is not a consolation prize: the table reads typed figures and pasted ones identically, because they are the same figures once saved.
This is the part worth reading even if you skip the rest, and it changed on 1 September 2026. Until then this app stored no status name at all: you typed the statuses yourself and the ones in your export were matched, converted and thrown away. It stores them now — safely, in one place, and visibly — and the reasoning is below.
Paste an export with a Status column and the statuses in it are added to a list you can see. It lives under Teams & Stages in the header, every entry has a delete button beside it, and that list is the only place a status name is kept. A work item stores a pointer into it, never the word, so pasting four hundred items adds no words at all — only the handful your workflow actually has.
The work item age chart then groups by status with no set-up from you. That is the whole point of the change: "where is everything sitting, and how long has it been there" is the question people walk up to a board with, and it used to cost you a list of hand-typed aliases before the chart could answer it.
A stage is an optional grouping over that list. Create one under Teams & Stages, name it — Build, Review, Test — and tick the statuses that belong to it. Worth doing when several statuses are really one part of your workflow, or when you want them in your own order rather than ranked by size. Change a grouping and every item you have already pasted moves with it — the stage is worked out when the chart is drawn, not frozen when the item was pasted, so nothing needs re-pasting.
So the chart has three readings and picks the best one available, without a picker: by stage if you have grouped anything, by status if you have statuses and have not, and by work type if your export had no Status column. The last is not a legacy mode — it is what a board without that column still gets.
Ticking a status into a stage is enough — it also claims that status's column in a Time in
Status export. One tick does both jobs: it groups the work item age chart, and it tells the app
that a Days in Code Review column belongs to your Review stage.
The typed status names box is still there, for what a tick cannot reach. A Time in Status export names its statuses in its column headings, and a heading is not a value in any column, so a status that has never appeared in an export's Status column is not in your list to be ticked — a typed name is the only way to match it. An old spelling your board has since renamed is the other case. Type them exactly as Jira spells them; capitals and punctuation do not matter, and a typed name wins where it disagrees with a tick. Those same typed names also tick a matching status into their stage the first time it is read, so a set-up made before any of this keeps working with nothing re-typed. Several statuses can feed one stage and their days are added together; if two stages claim one status, the app says so rather than picking one quietly.
Or type the days in. Once a stage exists it gets a box on the Add/Edit Work Item form, so a
board kept by hand — or a couple of figures read off a Jira screen without exporting anything —
fills this table exactly as an export does. Leave a box empty for a stage you have no figure for;
that is different from typing 0, which says the item crossed it inside a day. The days are
calendar days either way, which is what a Time in Status export counts and what the card says
on its face — the working-days setting governs the three durations this app measures itself, and
cannot honestly be applied to a single total someone else worked out.
Every other field this app keeps is guarded by asking whether a regex can tell it from a sentence — a key can, a project id can. A status cannot. "Fix the login bug on prod" is twenty-five characters of letters and spaces, which is every shape a status label has, so a length cap here would be theatre: a fourteen-character summary ("Login redesign") clears any cap a real status also clears.
What guards it instead is the column, not the value, and there are four parts to it:
- The app never guesses which column is the status. Only a heading that is exactly Status or Current status counts — not Status Category, not Status changed date — and there is no fallback that finds one from the values. A column headed as a summary, description, comment, note, title, reason or justification is out of reach of every field entirely.
- A status column repeats itself and prose does not. A whole workflow is about ten statuses however many items you have; a summary column has a different value on nearly every row. The app counts the distinct values in that column before storing anything, and a column that looks like free text is refused whole — not the short values kept and the long ones dropped, nothing at all — with the paste report saying so in counts, never quoting a cell.
- A row stores an id, never a word. The words live once, in a list capped at 40 that you can read and empty. The blast radius of a mistake is one visible entry, not a column of cells.
- Each label is held to a plain shape — 40 characters, six words, letters, digits and a few
separators like
/,(and'. A comma, a colon, a quote or an angle bracket is refused, and a failing label is dropped whole rather than shortened.
Points 1 and 2 are what make this safe; point 4 is hygiene and must not be mistaken for the guard. This is not precedent for storing a summary, and the reason is point 2 rather than any cap: a summary column fails the repetition test by construction — that is what makes it a summary — so the same argument applied to it answers no.
Only work still in progress is read. Every export says Done against everything it has ever closed, which is most of the file; a finished item's current status says nothing about flow. So finished rows are skipped, and Done never reaches your list.
A row that does not load still tells the app its status exists. An untouched backlog item —
raised, never started, no dates on it — is not counted in anything and does not appear on a
chart, but the status it is sitting in is a real part of your workflow, so it joins your list and
can be ticked into a stage. That is what makes a Days in Ready for Work column readable when
everything in Ready for Work is still waiting to be picked up. It is only the word that is
learned: no such row is loaded, counted, or shown anywhere.
And a Days in … column heading tells it too, when nobody is sitting in that status at all.
If nothing in your export is in CERT, the word "CERT" appears in no cell — only in the heading —
and there would otherwise be no way to match that column to a stage. So the heading offers it,
under three rules that all have to hold:
- the heading carries the
Days in/Time inwrapper, which is your export saying what the column below it holds; - every filled cell in that column is a plain number of days — one cell of anything else and the whole heading is refused, which is what keeps prose out; and
- the remaining words pass the same whitelist every status goes through: 40 characters, six words, no punctuation a status name does not have.
An empty column passes rule 2, deliberately — a status nobody is in is exactly the case this
exists for, and an empty column cannot hold prose. Days in Done and the other terminal
statuses are left out, as they are everywhere else here. The parse report names what it learned
this way, separately from what your rows taught it, because a status off a heading does nothing
until you tick it into a stage.
A status stays in your list once learned, whether or not anything points at it yet. That matters for exactly these two doors — a status off an empty heading, or off a row that did not load, is by construction a word no stored row uses. Until 2026-09-01 the next reload quietly dropped every status nothing pointed at, so the words the report had just named were gone by the morning unless you had already ticked them into a stage.
Matching ignores capitals and punctuation — In-Progress and In Progress are the same
status, stored once — but a typed name is matched exactly, never partially. An alias of
Testing will not quietly swallow a Waiting on Testing Env column and add somebody's
environment queue to your test time.
Most Time in Status exports do. They name a column for the status it measures and put a phrase in
front saying what the number underneath is: Days in Backlog, Days in Ready for Work,
Days in In Progress, Days in SIT.
The status inside the heading is what matters, not the whole heading. The words in front are
read off — Days in, Day in, Time in and Time spent in, in any capitalisation — and the
status inside has to be one you have matched to a stage, by ticking it or by typing it:
| Stage | Status matched to it | Columns it then reads |
|---|---|---|
| Backlog | Backlog |
Days in Backlog, and a Backlog cell in a Status column |
| Ready for Work | Ready for Work |
Days in Ready for Work, and the cell |
| In Progress | In Progress |
Days in In Progress, and the cell |
| SIT | SIT |
Days in SIT, and the cell |
If those statuses are already in your list, tick them and you are done — no typing at all. Paste any export with a Status column once and the statuses in it join your list; tick each one into a stage in Teams & Stages, then paste your Time in Status export.
If you would rather type, type the bare status, not the heading. One entry, both jobs: it
matches the column headings, which carry the durations, and the Status cell on work
still in flight, which is what puts an item on the
work item age chart. An alias typed out as
Days in SIT still reads the column, so nothing set up before September 2026 stopped working —
but it can never match a status cell, so it gets you half the feature.
Reading the wrapper off is not a loosening of the exact-match rule. What is left after the
phrase comes off still has to equal your alias in full: Days in Waiting on Testing Env becomes
Waiting on Testing Env, which an alias of Testing still does not match.
Before 2026-09-01 this did not work at all, and it failed in three places at once. An alias of
Code Reviewdid not match aDays in Code Reviewcolumn, so every day count in the file was dropped. A stage grouped by ticking statuses — the way this app invites — had no typed alias, so it could not match a heading however it was spelled. And the parse report said the paste held no day counts, which was the app describing its own miss as a fact about your export. All three are fixed: the heading's wrapper is read off, a tick claims its column, and when nothing matches the report says how many columns are headed as a number of days and that no stage claimed them.
Two columns such an export almost always has should be aliased to nothing at all, and both look like they should be:
Days in Doneis not a duration. It counts from the moment the item finished to the moment you took the export, so it grows every time you re-run the script. Alias it and the biggest stage on your chart is one that means "how long ago did this finish". A stage aliasedDonereaches that column now — that follows from reading the wrapper off — so the app says so on screen when it happens: the parse report names the column, names the stage it feeds, and tells you to take the status off unless you meant it. It still keeps the figure; it is yours.Closed,Resolved,CancelledandRejectedare warned about on the same terms.Days Blockedis usually the Flagged flag, and a flag runs at the same time as whatever status the item is sitting in — the item is blocked and in SIT, not blocked instead of SIT. Its days are already inside the other columns, so counting it as a stage counts them twice. It is also out of reach of the wrapper rule above — there is no "in" in it, so only an alias ofDays Blockeditself can ever claim it.
Leave both out of your aliases and the app ignores them. You do not need to delete them from the file.
Two more things about that kind of export, neither of them the app's doing:
- A cancelled item usually carries a resolution date, which means the dashboard reads it as
delivered work — inflating throughput and putting a cycle time on something nobody finished.
Filter it out where you build the export (
AND status != Cancelled, or your board's equivalent). - The day counts are calendar days. They come out of Jira's own history, which does not know about your weekends, so Count working days only in Settings cannot reach them. It still applies to cycle and lead time, which this app measures from your dates — so on a board with both, those two figures are on a different clock from the Time in Stage table. Worth knowing before the two are read side by side.
Deleting a stage takes its figures with it, and the confirm counts them both ways — the time items spent in it, and the items sitting in it right now, which on an ordinary Status-only export is all there is. Features are counted and cleared alongside the work items, because a feature carries the same two fields and the Add a Feature form fills them in. No work item is deleted, and re-pasting the same export brings the figures back.
| Column | What it says |
|---|---|
| Items | How many items have a figure for that stage — not how many have stage data at all. |
| Median days | The typical wait in that stage. |
| 85th percentile | The one to plan against, exactly as it is for cycle time — and a real duration some item actually took, never an interpolation. |
| Share of measured time | That stage's days as a share of all the stage time measured. |
The share is of measured time, not of cycle time, and the difference matters. A status export counts calendar days in every status you asked about, including ones that sit outside the started-to-finished span this app calls cycle time — so a share of cycle time could come out above 100% on perfectly ordinary data. A share of what was measured is self-consistent whatever your export covers.
These are calendar days whatever the working-days setting says, and the card title says so in its own words. That setting governs the three durations the app works out itself, from dates it holds. These are worked out by Jira, from a status history the app never sees, and there is no honest way to re-measure a single total Monday to Friday.
Stages appear in the order you arranged them in, not biggest first: a workflow has a direction, and that order is the one thing you already know how to scan. Only stages that actually carry figures get a row. The table copies and downloads like every other table of figures.
A Status column is a short repeated label — which is exactly what the app's work-type detector hunts for, and Ready for Code Review is short enough to pass as a work type. Before the app knew what a Status column was, an export without clear headings could quietly file its statuses as work types. Naming the column takes it out of that guess, whether or not any stage matches what's in it. Since 10 Nov 2026 the guess is for columns with no heading at all: a column headed Assignee or Epic Name is never read as the work type, however much it repeats, so an export with no Issue Type column loads with no type rather than saving names as types.
Only work still in flight gets a stage. Every export says Done against everything it has ever closed, and a finished item's current status says nothing about flow — so those are skipped rather than filed under a stage you don't have.
After a paste it says which column it read as the current status and how many items were filed under a stage, and it names which columns were read as which stage — by position and by your stage name, never by the heading or the cell out of your export, because this report has never echoed a pasted cell.
Columns are separated by a tab, a comma, or two or more spaces. A single space is not a
separator in general — a work type is Tech Debt and a date is 21 Jan 2015, and both contain
one — but a paste that yields no columns at all is retried on single spaces and kept if that finds
a column of dates. So 1/1/26 1/1/26 Story typed out by hand works, while a lone column of
21 Jan 2015 dates still reads as one column.
If nothing loads, the note says which of the two happened: an empty box gets "paste some rows first", and a box with rows in it that produced nothing says so and names the likely cause, rather than telling you to paste rows you are looking at.
An ambiguous date order announces itself. With Auto-detect on, the order is read off the data
— 21/01/2015 can only be day-first. When nothing in the paste settles it, as in a set of dates
that are all 12 or under, the app falls back to day first and says that it guessed, with the
picker to change. The difference is not cosmetic: 1/1/26 to 1/3/26 is two days read one way
and fifty-nine the other.
If items had a status that is in no stage, it says how many, and it names the statuses it
kept — those have passed the column test and are in your list, so showing them is showing you
your own stored data. A cell it refused is still never printed: the column that has just been
judged free text is the last one to start quoting from. It counts only rows that were actually loaded — an untouched backlog item has a
status and no dates at all, so it is dropped before it gets here, and counting those made the note
read "400 items had a status no stage answers to" on a set-up whose spellings were perfect. If nothing matched, it says so and points you at the Teams
window. If a stage's alias named a column the dashboard already needs — aliasing Created, say
— the date wins and the report tells you which stage lost, rather than leaving you with a stage
that silently reports nothing.
Cells it cannot read as a plain number of days are counted per column and left out. The app
reads 3 and 3.5; an export written as 3d 4h or 12:30 needs asking for in days.
Every other chart on the Health tab is a count. Work item age is the one that names things: each item still in progress plotted at the age it has reached so far, in a column for its work type.
It is the chart to run a stand-up off. The aged work chart beside it says how many were stale at the end of each period; this one says which ones are stale now, and by how much.
A dot on its own says an item is 23 days old, which means nothing without something to compare it against. So three lines cross the chart:
| Line | What it is |
|---|---|
| half took under N | The median of this team's own finished work |
| 85% took under N | The 85th percentile — the same figure the headline tile states |
| aged after N | The ageing threshold from Settings |
The middle one is the one that matters. An item above it has already taken longer than 85% of everything this team has ever delivered — it is not merely old, it is outside the range of work that finishes normally, and it is very unlikely to be the exception. That is a much stronger thing to say in a stand-up than "this looks like it's been there a while", and it comes from the team's own history rather than from anyone's opinion.
The lines are labelled where they are drawn rather than in a legend: a legend entry costs vertical space out of a 300px card, and it costs a lookup — matching a dash pattern at the top of the card to a line in the middle of it. Only the two dot shapes get a legend, because a shape does need a key.
Each label sits in a small opaque panel, centred on its own line. That is what keeps the dashes from running through the words, and what separates two labels when the lines are close together — an ageing threshold of 14 against an 85th percentile of 13 is an ordinary board, and without the panels those two labels landed on top of each other.
If your export has a Status column, the columns are the stages you set up. That is the canonical version of this chart, and the question people actually walk up to a board with: what is sitting in each part of the workflow, and how long has it been there? A cycle time figure can tell you work is slow. This tells you it is slow in test.
Stages appear in the order you arranged them, left to right, so the axis reads the way your workflow does — not busiest-first, because a workflow has a direction and that order is the one thing you already know how to scan. Only stages holding something in flight get a column; an empty one is a gap in the axis rather than information. Each tick carries its count — Review (4) — so the chart also answers "how many are sitting there".
Items whose status matches none of your stages land in a No stage column at the right-hand end. That is worth looking at rather than ignoring: it usually means a real part of your workflow you haven't set up yet.
Without a Status column the columns are work types, exactly as they always were, and that is not a legacy fallback — a board where the defects age and the stories don't is a completely different problem from one where everything ages, and one glance separates them. Those columns are ordered by how many items are in them, busiest first, and a board with more issue types than fit folds its tail into one Other types column.
There is deliberately no picker to switch between the two. It would be a control you set once and never touched, and nothing is lost without it: the work-type reading is a filter away. Scope the strip to Defects and this chart answers where do defects get stuck — which is strictly more than the work-type axis ever said.
Items within a column are spread across it and sorted by age, so two items the same age never land on the same pixel.
Point at a dot and the tooltip names it. Press it and its issue key goes on your clipboard, ready to paste into Jira — which is the next thing anybody does with a name read off this chart. A toast confirms which key was copied. The pointer only turns to a hand over a dot that has a key, so the affordance never promises something that would do nothing.
A dot with no key says so rather than copying something else. Without a Key column the
tooltip falls back to the work type, which is a useful label and useless on a clipboard — quietly
copying Story would be worse than doing nothing.
Where several items finished on the same day in the same number of days, their dots land on one pixel. The tooltip describes the one a press would copy — the item it names at the top — and says how many are underneath it: "6 items sit on this dot", then "Click to copy DAE-1306, the one named above". The others are not reachable by pressing a dot they are hidden under; the Loaded Data table lists every one of them.
It works the same on both scatters — this one and every finished item — from one piece of code, so the pair can never behave differently. It works in a shared link too: it writes nothing and reads only what is already drawn on the recipient's screen.
If you are working by keyboard or with a screen reader, the same keys are in the Loaded Data table on the Your Data tab, which has its own Copy button — that table is where every chart's text description already points.
Point at a dot and it names the item: its issue key, if your paste had a Key column. That is the whole reason the key is stored — "which of these needs looking at" is unanswerable when every dot on the chart is called Story, and a key is something you can paste straight into Jira. Or press the dot and it goes on your clipboard without the retyping.
If your export has no key column, a dot falls back to its work type and start date, which finds the item in the export you pasted in seconds. Both charts name dots the same way, from one piece of code, so the pair can never disagree about what an item is called.
The key and the status are the only things out of your work system the app keeps — no summary, no assignee — and the key is checked against the shape of a key rather than trimmed to fit, so a mismapped column stores nothing at all rather than storing part of a sentence. The status is guarded a different way, by the column it comes from; see Your Statuses, and Grouping Them Into Stages. The Your Data tab lists every item with its key, unfinished ones at the top.
- Nothing above the threshold line — the board is healthy, and the aged work tile reads 0. Team Healthy Flow in the demo looks like this.
- A few dots high above everything else — the usual picture, and the useful one: those are the items to talk about, in that order, starting with the highest.
- Everything drifting upward together — not an ageing problem but a work-in-progress problem. Check the WIP vs throughput tile; the answer is usually to start less, not to push harder.
- One column ageing and the others not — a queue specific to that kind of work. Defects waiting on a reproduction, spikes nobody has time for.
Ages follow the working days setting exactly as the ageing threshold does, because a chart whose dots and whose line disagreed about what a day is would be unreadable. And like work in progress and aged work, ages are read as of the newest date in your data, not today — so a paste of last quarter's export reports that quarter rather than ageing everything by the months since.
No window is read as of a date that has not happened. "The newest date in your data" means the newest date that has actually arrived — a rolling window, a typed To box and the shared end date the Scorecard imposes on its two lists are all held at today at the latest.
This matters more than it sounds, and it is the reason the item form has always refused a future date outright: work in progress and aged work are read at the window's end, so an end date three months out ages every open item for free. One feature with a planned start in December did exactly that to the Scorecard on 10 September 2026 — the page reported 30 Nov to 31 Dec, with nothing completed in it, every still-open item long past the threshold, and an aged share of 100%. Everything on screen was arithmetically correct and none of it was about the present.
A paste has never been held to the form's guard and still isn't — nothing is dropped, because a row dated next year is still a row and it is yours to fix. What changed is that it can no longer move the window, it no longer counts towards how fresh the export is, and the note under the date picker says it is there: 1 feature dated after today — the window stops at Sep 10, 2026. On the Scorecard the note reads both lists, because the row that caused this was in the one that page does not show.
A completion dated after today is not a completion yet: the item counts as still open until that day arrives, and a board whose only completions are planned ones reads as Nothing Finished Yet — with the note saying how many rows are planned and how many are in progress — rather than as a filter problem.
The Aged work tile counts the items that have been open too long. This one says what proportion of the board they are — the aged count over the work in progress count — averaged across the whole window.
It exists because the count on its own does not travel. Six aged items is a tail on a board of thirty and a stop on a board of six, and the raw count ranks teams by size rather than by trouble. That is why it is also a column in All Teams, and the ageing column worth sorting on.
It is a division of two series the app already had rather than a third count of its own, which is what makes it safe to state: the aged count is worked out by subtracting from the work in progress count, so the numerator can never exceed the denominator, and summing both across the window cannot break that.
A dash means there is nothing to state, not that nothing is wrong. Either no ageing threshold is set — the feature view ships without one — or nothing was open at any point in the window, and no items open is not a share of nought. Periods with nothing open are left out of the average for the same reason, and the card says how many periods it actually averaged over. A zero here would draw a healthy floor across a board that had simply stopped.
This changed on 10 September 2026. Until then the tile, the All Teams column and the Scorecard card all stated the last point of the chart — the board as it stood on the newest day in your data. That is a true reading of one day, and it was being read as a verdict on a quarter: a release that cleared the board on the Friday made the quarter look healthy, and a board that filled on the Monday made it look worse than it had been all year.
The figure is now what those weekly readings come to together. It is pooled, not meaned — add up the aged readings, add up the open readings, divide — so a week with thirty items open counts thirty times as hard as a week with one. Averaging the percentages on the chart would let a quiet fortnight when the board was nearly empty swing the figure as far as a full one, and it will not give the same answer. It is the same pooling the defect rate chart calls its overall figure.
Nothing was lost. The chart still plots every period, with the average drawn flat across it and named in the chart's title, so you can see the window the figure came from. And the tile's foot states today's reading beside the average — 67% right now, 6 of 9 open items — in the same counts the Aged work and Work in progress tiles are showing. Those two tiles and this one no longer divide into each other, which is exactly why the foot spells it out: a reader who takes 6 over 9 and gets two thirds is meant to arrive somewhere.
One consequence worth knowing: the figure now moves when you change the date picker, where a point-in-time reading did not. A wider window is a different question, not a longer look at the same one.
This app states figures and judges nothing. That is still true out of the box, and it stays true until you draw the line: set both boundaries in Settings and the tile takes a green, amber or red state, and the chart shades your bands behind its line. Leave either box empty and both behave exactly as they always did.
This was the only graded figure until September 2026, when the Scorecard added two more scales on exactly the same machinery — both boxes or nothing, green at or below red or nothing, the verdict written out in words whichever way the colour reads. Everything below is still true of the aged share; what changed is that it is no longer alone.
It is graded as the whole percent you read. The tile states the share to a whole percent and the boundaries are whole percents, so the comparison is made in whole percents too: a board at 1 of 3 reads 33% and is on target against a boundary of 33, not a hair over it. A boundary typed with a decimal is stored as the whole percent it will be named as, one typed over 100 is stored as 100, and the box shows the stored number once you leave it. A minus sign, or anything that is not a number, clears the box rather than becoming a zero — a share of 0% is a real target ("nothing past the threshold, ever"), and a slipped key must not draw that line for you.
The first boundary must be at or below the second. Green above red is not a scale with its bands swapped, it is no scale, so the app grades nothing and says so under the two boxes in Settings — and under the Scorecard card's figure — until they are the other way round. Equal is allowed: on target at or below the number, off target above it, with no watch band between, if that is what you mean.
The colour is never the only signal. The tile also carries a symbol — ✓, ! or ✕ — a status spelled out for a screen reader, and the verdict written into the caption in words, naming the boundary as well as the state. The chart names its two bands at the left end of the plot, over the oldest weeks, so the newest points — the ones the tile is stating — are never under a label. That last one is there whether the tile is coloured or not: it is the half that survives a printed page, a screenshot, and red-green colour blindness. The three colours are the theme pack's own, checked against each other under both common forms of red-green deficiency as well as for contrast — but a reader who sees no colour at all still loses nothing.
The chart's line is never recoloured, in any band. The bands are your scale; the line is your team's figures, and a line that changed colour would be the app grading them. Its y axis is pinned to 100% so the bands stay put and a quiet board reads as quiet rather than as full, and the bands themselves are drawn at half strength — at full strength, with most boards living under 40%, six tenths of every chart came out red before anything was plotted and the eye read the area as the finding.
Three Jira custom fields say something the dates cannot: where a piece of work came from, where a bug was found, and whether the team had any choice about doing it. When your export carries them, the Dashboard's Work Mix tab reads them.
| Jira column | Values read | What it feeds |
|---|---|---|
Custom field (ServiceNow Assignment Type) |
Change Task, Incident, Service Catalog Task, Vulnerabilities | Where Defects Came From, the From ServiceNow tile, and a team's incidents switch |
Custom field (Bug Type) |
Production, Pre Production | Where Defects Were Found and the Found in production tile |
Custom field (Type of Work) |
Discretionary, Non-Discretionary | Non-Discretionary Share, its tile, and the All Teams Non-disc. % column |
The bare names work as headings too. Case, spaces and hyphens don't matter — pre-production
is Pre Production.
Each field is a short, closed list, so an item stores which value it was, as a number — never the text of the cell. A cell holding anything else is dropped and counted in the paste report, which never prints it. The columns are only ever found by their heading: a column of "Production" and "Incident" looks exactly like a column of work types, so without a heading nothing is guessed — and, for the same reason, a headerless paste never takes such a column as the work type either. A column whose every filled cell is one of these values is left out of that guess.
All three headings contain the word type, and the work type column used to be found by the leftmost heading that loosely said "type" — so one of these to the left of Issue Type would have taken its place. They now claim their own columns first, and an exact Issue Type or Type heading wins over a looser one such as Status Category.
They can be typed in too: the Add/Edit Work Item window has a select for each.
| Card | What it shows |
|---|---|
| Defect rate | The chart it always was — moved here from Health so it sits beside its two splits |
| Where Defects Came From | Defects resolved each period, stacked: raised in Jira, or through ServiceNow |
| Where Defects Were Found | The same defects: found in Production, in Pre Production, or not recorded |
| Non-Discretionary Share | The share of finished work carrying a Type of Work that was Non-Discretionary, with the pooled overall line |
Four tiles sit above them: the defect rate, From ServiceNow, Found in production and Non-discretionary.
- A share counts only work that carries a value. Every title and tile foot says how many did, so a patchy field reads as patchy rather than complete.
- No value is a dash, never 0%. A period with no Type of Work is a gap in the line, not a zero.
- A blank ServiceNow type means "raised in Jira" only on a team whose export carries a ServiceNow value somewhere. A team with none — no such column, or a column left empty, which is the same thing once only the numbers are stored — is left out of the source split: a blank there says nothing about where the work came from.
- Over features the two defect splits are not a figure — a defect is a kind of work item — while Type of Work and the ServiceNow share still count.
- Every share is pooled over the window — sums over sums — never an average of the plotted points.
A support team picks up ServiceNow incidents that are often problems it solves for other teams. They arrive in Jira as bugs, so counted as defects they make the team doing exactly its job look like the least reliable one on the train.
Nothing in an export says whose problem an incident was, so the app doesn't guess item by item. Instead each team has a switch behind Edit in Teams & Stages: Count this team's ServiceNow incidents as defects. It is on for every team unless you untick it. Untick it for a support team and its incidents:
- leave its defect rate — on its dashboard, in the All Teams column and in the Scorecard's Quality figure, which all use one definition of a defect;
- still count as delivered, and every other ServiceNow type is untouched;
- are counted on the From ServiceNow tile and in the Where Defects Came From title, so the move is on the page.
The window counts how many of the team's items are incidents before you touch it, the team's row says incidents as support, and All Teams and the Scorecard say how many teams in scope have it off.
Jira exports carry a Parent key column — the feature, epic or capability a work item belongs to. Set up which work types mean "a feature" and the app reads it, so it can answer questions about the thing people actually plan in rather than only about individual items.
Feature ships in the box, and clearing it turns the layer off. Work types that mean a
feature in Settings starts as Feature, because that is what Jira's out-of-the-box hierarchy
calls the level above a Story — the default of the tool these pastes come out of rather than a
guess at your board. It is one word to change if yours says Epic or Capability, and the parse
report names the work types it actually found in your paste, so the right word is on screen after
the first paste.
Empty is still off, and empty means the whole layer is off: no row is diverted, nothing new is stored, and every figure is the figure it was. A feature type that matches nothing costs nothing either — it diverts no rows, moves no figure, and the feature view says it has no features rather than showing you a wrong one. Changing this default reaches only a new browser and Reset Settings to Defaults; a dashboard that already has the box empty keeps it empty.
A feature is an issue like any other — it has a key, a type and dates — so a Jira export of a board hands you features and work items in the same file. Rows matching a feature type are taken out of the work items entirely and kept in their own list.
That separation is the point rather than an implementation detail. Every item-level figure in this app — throughput, cycle time, the 85th percentile, the defect rate, work in progress, aged work, both forecasts — is worked out over the work items, and none of them can see a feature. A flag on a shared list would have meant auditing every one of those readers and trusting the audit for ever; a separate list means the question cannot arise. A test pins every one of those series as byte-identical with the layer on and off.
A work item with a created date and nothing else is untouched backlog: it says nothing about flow, so it is counted and dropped. A feature in that state is the pipeline — it is precisely the thing a forecast is about — so a feature is kept when it has a key and a date of any kind.
The key is required rather than merely useful. What makes a feature more than another row is that items name it, and they name it by key; a feature with no key can never be joined to anything. Feature rows arriving without one are counted and reported under their own heading, so it reads as "your export is missing a column" rather than as ordinary bad data.
Parent summary sits in the next column along in the same export, and it is the one field
here that is typed by hand. It is never read, never stored and never shown. See
What Happens to Bad Data above for the guard that makes that a rule
rather than an accident.
Statuses becoming storable did not change this, and it is worth saying why, because the two look alike from a distance. A status column repeats — ten values across a whole export — and that repetition is what the app measures before it stores anything. A summary column has a different value on nearly every row, which is what makes it a summary, so the same test applied to it answers no. Nothing about it is a matter of length.
Once a team has features, the control strip gains a Count picker: Work items or Features. It is first in the strip because it is the only control there that chooses what is being counted — everything to its right narrows a population, and this one picks it.
Every chart, tile and table follows it. Throughput becomes features completed per week,
cycle time becomes how long a feature takes end to end, the cumulative flow diagram stacks
features, All Teams compares teams by feature, and the Loaded Data tab lists features. There is
no second set of maths anywhere: derive() takes a list of records and works out flow over it,
so switching the unit is switching which list goes in. That is why the two readings can never
disagree — there is only one reading.
The same picker is on Your Data, above the table, because that tab shows one of the two
lists and the strip is not on it — before, the only way off "Loaded Features" was to visit the
Dashboard, throw the switch there and come back. It is the same control rather than a second
one: same label, same Count, and throwing either box moves the other. The rest of the strip
deliberately does not follow it there — a work type filter, a date window and Group by all
narrow a population, and none of them means anything to a raw list.
Three things deliberately do not carry over:
| Why | |
|---|---|
| The WIP limit and the cycle time target | Both are promises a team made about its board. Three features in flight against a limit of six would read "inside it" — a reassurance about a promise nobody made — and a 54-day feature against a 10-day target would read "not met", a failure nobody signed up to. In the feature view a team has neither set, exactly as a team that has never set them. |
| The defect rate | A defect is a kind of work item. Over features the chart would plot a flat zero and the tile would read 0.00% — a claim of perfect quality on a board that may have plenty of bugs. It is the one reading that would be actively false rather than merely less useful, so it is the one card the switch takes away, with a note saying why. The figure itself is null over features at source, not merely hidden by each thing that reads it: the tile, the All Teams column and its CSV all get nothing to state without a guard of their own. That is the fix for the version where the tile knew and the table did not, and the same data read "— not a feature-level figure" on the dashboard and "0.0%" one tab to the left. The All Teams column stays in place and fills with dashes rather than disappearing — a column that came and went would shift every heading beside it, and the sort could be resting on the one that left — with the reason in the note under the table. |
| The date window on the progress table | Features still open counts the whole feature. "How far along is this" is a question about the thing, not about a slice of the calendar, and a progress figure that moved when you changed the date picker would be unreadable. |
And one thing is replaced rather than dropped: the ageing threshold. See below.
The feature view is read as of where the team's work items end, not where its features do. Features rarely get a new date, so a feature list read as of its own last date would age every open feature, and start the forecast, from the day the last feature moved — months early on a quiet board. The Scorecard follows the same rule. A team with no work items is read as of its features.
The item threshold defaults to 14 days. Read against features that is not merely less useful, it is wrong in the direction that matters: features routinely run for weeks, so a fortnight would flag an ordinary board as a failing one, and the Aged work chart — the one chart here that can warn you before a miss happens — would be a flat wall of red herrings.
So features are aged against a threshold of their own, set in Settings, and it ships empty. Empty is a setting, not an unfinished one:
| With no feature threshold set | With one set |
|---|---|
| The Aged work card keeps its place and explains itself, naming the setting and stating what that team's finished features actually took — the median and the 85th percentile — so the number you pick comes off your own board | The card plots the series, exactly as the item view does |
The Aged work tile reads —, never 0. A zero would be the app reporting no ageing problem on a board it is not measuring |
The tile counts, as of the newest date in the data |
| The Aged column on All Teams reads — for every team | It counts per team |
| The threshold line comes off the work-item-age chart, and no dot is drawn as aged | The line is drawn and the dots past it take the aged shape |
Neither threshold ever reaches the other's view, in either direction, and both are pinned that way by a test. The item view is byte-for-byte what it always was.
No default ships for the same reason Spikes, Stories and Tasks were taken out of the work type filter list: a guess at somebody else's board is worse than a missing setting, because a filter or a threshold that silently matches the wrong thing reads as broken data rather than as a setting nobody set. Loading the demo does set one — 30 days — because it is a number chosen for those two particular boards, and it says so in the confirmation.
The switch disappears entirely when no team has features. A control with one usable position invites a press that does nothing.
One feature-level figure is stated outside the feature view, and it is the only one: the Scorecard's Flow card, which is the average time a finished feature took. That page states both units at once and so does not follow the switch at all. It does not depend on the feature ageing threshold — that setting gates how many features are counted as aged, and this counts how long the finished ones took, so it is stated whether a threshold is set or not.
Items per Feature — the distribution of how much work a finished feature actually took, one bar per size. It counts finished features only, for the same reason cycle time counts finished items: a feature still in flight is still growing. A child that completed after its feature closed is left out too — it was added or moved later, which is not about delivery.
Read the spread, not the median. A wide one means a feature is not a unit of anything on this board — two of them can differ by a factor of ten — and that is the single biggest reason a plan counted in features goes wrong.
Features Still Open — every feature without a completion date of its own, most work remaining first, with Copy and CSV so it goes straight into a planning note. A feature is open until it has a completion date, which is not the same as all of its items being done: integration, sign-off and a demo all happen after the last story closes, and a board that closes the feature late is telling you something.
Features come out of a paste, and they can also be typed in — the rule this app holds for everything it stores. With Count on Features, the Your Data tab lists your features and its button reads Add a Feature…; the same form edits and deletes them.
Two rules differ from a work item, and only two. A feature must have a key — items name it by key, so one without can never be joined to anything — and it may carry only a created date, because an unstarted feature is the pipeline where an unstarted item is untouched backlog. Everything else, including the date ordering and the refusal of future dates, is identical.
The work item form gained a Part of feature box for the same reason, so the breakdown can be built by hand and not only pasted. Deleting a feature leaves its items alone: they are work that was really done, and they keep the key they carried.
The red button clears the whole team's data — both lists. Clear This Team's Data deletes every work item and every feature the team holds, whichever list is on screen, and its confirm names both counts ("Delete 190 work items and 20 features for …?"). The team itself and its settings — name, train, WIP limit, SLE, sprint cadence — are kept, so clearing every team and then using Back Up gives a clean copy of a train that other people can load and fill with their own data. (Before 2026-10-13 it took only the list on screen, which left features behind a "cleared" team.) A team with neither list reads (empty) in the team picker; one holding only features no longer does, the Teams window counts a team's features under its items, and the button shows for any team holding either list.
Nothing, unless you use it. A team with no features writes no features key and a row with no
parent writes no parent key, so a browser that never turns this on saves byte-for-byte the
document it saved before. The stored-data marker moved to schema: 12; a backup from an older
build restores fine and simply has none of it — and, because a column of parent keys pasted per
item is not something anyone can re-type, a restore that would drop them asks first.
Every other figure here describes what already happened. The Forecast tab is the one that looks forward, and it does it without asking you to estimate anything at all.
It takes the throughput this team actually recorded — the completions in each whole period — deals those periods out again at random ten thousand times, and reports how often each outcome came up. That is a Monte Carlo forecast, and the only input it needs is the thing you have already pasted: dates. No story points, no sizing, no velocity, nothing anybody has to guess at in a room.
It answers two questions, from the same set of deals:
| Question | You type | You get |
|---|---|---|
| Time to finish | a number of items | the date that many will be done by, at 50%, 85% and 95% confidence |
| Items by a date | a target date | how many will be finished by then, at the same three confidences |
Adjust for what you know remembers whether you left it open. Markup resets on every load, so a reader who had it folded open came back to it shut with their settings behind the fold — and the heading's "6 settings on" was the only thing that would have told them anything was there.
Both boxes sit inside the tab rather than in the control strip at the top of the dashboard, because they change nothing outside this group. Everything in the strip does reach them: the team, the work type filter, the date window and the grouping all decide which periods get dealt.
A team that has not started has no throughput to resample — and that is exactly the team most often asked for a date. Forecast Ahead on the welcome card is the way in: it opens the Dashboard with the Forecast group and nothing else, the typed-pace tick already on, and the two boxes waiting.
It does not type a pace for you. Every number in the answer has to be one you chose, so until the range is filled in the tiles read waiting for a pace under "Adjust for what you know" below rather than a date, and the two chart cards say the same. Fill it in and you get the same two answers, at the same three confidences, that real data would give — dealt from your range instead of from history, counting from today.
What the screen says about itself changes to match. There is no "the next few weeks look like the 13 whole weeks on screen", because there are none; the basis tile states the range you typed rather than a period count of zero, and the exported table says a typed pace, no history where it would otherwise name the periods. A figure taken out of here can be argued with on the same terms as any other.
Both lenses. The Count switch is offered here even though nothing exists to count, because you are saying what you are about to build rather than what you have built. On Work items you type a pace and a scope. On Features you type the pace and the one other thing this app normally measures for you — work items per feature — and the same decomposed model runs over it. Nothing about the maths changes; only where the two sample sets come from.
The pace is in work items on both lenses. A feature answer is item throughput converted through the size distribution — nobody speeds up by completing features faster — so the pace box, the assumption line and the export all say work items however the answer is counted.
Two things worth knowing:
- A typed range spreads less than real periods do. It has no quiet weeks and no spikes in it, so treat its confidence as the most generous reading rather than the safest one. The team confidence setting is switched off while a typed pace is live — multiplying a guess by a guess compounds two people's pessimism.
- Real data retires it. The moment any team holds a row the whole dashboard comes back and the planning flag is cleared for good, rather than lying in wait to resurface if you later clear your rows.
Switch Count to Features and the forecast answers in features: when will N features be done, and how many by a date.
It does not resample how often a feature completes. That is the obvious approach and it is
wrong on nearly every real board, in a way the existing guards do not catch. A team finishing one
or two features a month gives a weekly series like 0,0,1,0,0,0,1,0,0,0,0,1 — twelve periods, so
it clears the eight-period floor, and something completed, so it clears the all-zero check. What
comes out looks like an answer and is mostly an artefact of the zeros.
Measured, against a dense series picked to have the same median: the sparse one says 11 periods at 50% and 24 at 95% — the cautious answer is 2.2× the middle one. The dense one says 12 and 13.3, a ratio of 1.1. Both say "about twelve periods". Only one of them knows it.
So a feature forecast is decomposed. It takes the two things a board really has plenty of — the item throughput, which is dense, and the measured distribution of how many items a finished feature took — and puts them together.
Both live inside one simulated run. This is the part that is easy to get wrong: the tempting shortcut is to forecast the halves separately and multiply the 85th percentiles — "the 85th percentile feature is 20 items" × "20 items takes N weeks". That compounds two tail values and lands far past the real 85th. Each run draws a size for every feature, adds them up, and walks that target once, so the distribution carries both sources of variance jointly. A test pins the integrated answer as comfortably below the multiplied one.
The tile says so on its face: "Built from 17 finished features, sized at a median of 9 items each, paced by 14 whole weeks of item throughput." A reader about to promise something off this is owed both halves.
It refuses in three ways, each naming one thing to fix:
| What it means | |
|---|---|
| Too few finished features (fewer than five) | The size distribution is a fact about which few you hold, not about the board. Widen the window. |
| A thin join (under half the parented items find their parent) | Items-per-feature is measuring how completely your export was filled in, not how work breaks down. Fix the Parent key column, or widen the scope to the teams that own those features. |
| Too little item history (under eight whole periods) | The existing floor, unchanged. |
The thin-join check runs before the size count, because it is why the size count is low — reporting the symptom would send you hunting for finished features when the column you need is missing.
One limitation ships as a sentence rather than a correction: decomposition assumes a feature is done when its items are done. Integration, sign-off and a demo all happen after the last story closes, and none of that is in these numbers. The hint says so every time.
With two or more teams the tab gains a Whose pace picker: the team on screen, any ART by name, the teams on no ART, or all of them. Everything else on the dashboard stays the team in the header — only the forecast widens.
And the card says so, in those words. Pick a train and a line appears above the answers naming the team the tiles and the Flow, Delivery and Health charts are still showing, and the picker that took this one somewhere else. Naming the scope was never quite enough on its own: somebody who has just been reading Flow reads "dealt from the Payments Train pooled" as extra detail about the team they are already on. It stays away when there is nothing to report — on your own team, and on a train that carries only the team you already had picked, which is the same rows through the same arithmetic.
It pools the work items, it does not add up the teams' answers. One draw takes a calendar period and asks what the whole train delivered in it, so a week they all lost — a freeze, an incident, planning week, a holiday — is counted once, as it happened. Adding up independent per-team forecasts would assume those weeks were unrelated, and would produce a narrower spread than reality. A forecast that understates risk is the one kind this app must not draw.
Every row of All Teams is read as of one shared date — the newest any team holds — because otherwise "the last three months" means a different three months per team. That fairness rule turns into a lie the moment you forecast with it: a team whose export stopped three weeks ago contributes three periods of zero, and those are not observations of a slow team, they are the absence of data. The app cannot tell the difference, because throughput is a count over rows that are not there.
Worse than the pace it drops is the spread it adds. Those periods are systematically low rather than randomly low, so they fatten the slow tail exactly where the 85th and 95th percentiles are read. The forecast comes out both slower and less certain, and neither is a fact about delivery.
So a pooled forecast is dealt only from periods every team in scope still had data for, and the card says which teams are behind, where the window stops, and how many periods that cost. A team counts as behind when at least one whole period lies between its last row and the newest date. The forecast is dealt in whole periods, so a team whose export stops a day or two before the others has cost it nothing — the gap falls inside the part-period the samples never count — and the card says nothing. (Until 2026-09-04 any gap at all put a team on the card: the sample data's Team Long Tail ends one day before Team Healthy Flow, and the Delivery ART forecast told you to re-export it "before promising anything from this" over a forecast that had lost nothing. The Data to column on All Teams still reports the date, which is still true.) Only the forecast's window moves; everything else stays read as of the newest date. If trimming leaves fewer than eight whole periods it refuses under its own name — the fix is a different one from "not enough history": re-export the teams that are behind, or narrow the scope to the ones that are current.
Every figure in this app is read as of the newest date in your data, and the forecast has always followed. That is right while an export is current, and flatters the plan by exactly its staleness when it is not: an export that stopped nine days ago puts every forecast date nine days early, and nobody is going to deliver those nine days retrospectively.
When your data ends before today, a Counting from picker appears with the gap named. The default stays End of the data, because changing it would make the forecast disagree with every tile beside it. Switching to Today leaves the simulated walk untouched — the same number of days — and moves every date it lands on by exactly how far behind the export is.
The two questions take their answers from opposite ends of the distribution, which is the one thing about this feature that is easy to get backwards:
- A date is a safer promise the later it is. 95% confidence buys you a later date.
- A count is a safer promise the lower it is. 95% confidence buys you a smaller number.
So being more careful moves one answer up and the other down. Nothing on screen is labelled by percentile for that reason — every row says "85% confident", and every count says "at least", so you never have to hold the flip in your head. A team asked for twelve items might see 85% confident: 8 October and, on the card beside it, 85% confident: at least 47 items by 15 December. Both are the cautious reading.
Which row to use is a judgement about consequences, not about statistics. 50% is a coin toss — fine for a private guess at what a sprint might hold. 85% is the one worth saying out loud, and the same 85 the cycle time tile reads, for the same reason: high enough to be a promise worth making, low enough that one freak run doesn't set it. 95% is what you quote when being late is expensive.
The chart under each answer is the distribution the three rows are read off, shaded by confidence — the stronger the colour, the safer a promise at that point. It is worth more than any single row. A narrow, tall distribution means the team's pace is steady and the date is close to a fact. A wide, flat one means the date is a guess whichever row you pick, and the fix for that is steadier delivery rather than a later promise. Two teams with the same median can have completely different pictures here, which is exactly the conversation the tab exists to start.
The shading runs one way on one chart and the other way on the other, because the safe end of each is at a different edge — but the colour means the same thing on both, and the rows repeat it in words for anyone who would rather not read colour at all.
Every forecast above assumes the next few periods look like the last few. Adjust for what you know is where you say how they will not — eight controls, behind a fold, each defaulting to doing exactly nothing.
That default is not a formality. When nothing is set, the app runs the same sampler it always ran — not an equivalent one, the same code — so the plain forecast is the plain forecast. Press Reset to No Adjustments and the answer returns to the number it was, exactly.
| Knob | What it says |
|---|---|
| Each known feature grows by / The work you counted grows by | The work you have counted turns out to be more than you counted. A percentage range. The only scope knob both lenses read, so it is relabelled for the one you are on rather than hidden. |
| Features discovered later | Work you have not counted at all turns up. A percentage on the feature count. |
| How well understood are they | Four steps, from Well understood to Barely understood. It widens the sizes drawn, it does not inflate them — the difference between "we are less sure" and "it will be bigger". |
| The team doing the work | Established, recently changed, or brand new. Scales the pace being resampled. |
| Features worked at once | See below — it changes each feature's date and not the last one. |
| Periods nobody is delivering | A shutdown, a conference, a holiday fortnight. A plain number. |
| Use a typed pace instead of this history | For a team with no history to resample. Ticked by default where there is none, unticked where there is — see below. |
| Use a typed size instead of your finished features | Feature lens only, and only where there is a measurement to replace. Off by default — see A feature size you type, over a board that measures one. |
All six knobs sit on one line where there is room for them, and three across where there is not. Six fields come to 1168px of content plus their gaps at the widest labels the app can produce, so one line needs about 1220px of block — a 1440px window, not a 1366px one. Below that they go back to three across, which is where the item lens sits at every width: it hides three of the six, and the three that are left fill the same single line rather than making a row of one and a row of two with a third of the block standing empty. Narrower again, six go two across and three stack. Every count divides evenly at every step, so a row is never left with a field alone beside a hole.
And each box is the size of what goes in it — see A box is as wide as what goes in it.
The block explains itself. It carries an ⓘ of its own — for a long time it was the only set of controls in the app with none — and the window behind it says what each knob does to the answer before you have set anything. Reset to No Adjustments is disabled while there is nothing to reset, which is a stricter test than "is the forecast still plain": a ticked typed-pace box with an empty range claims nothing and moves no number, but it is something you pressed, and a Reset that could not un-press it would be lying.
A typed pace, and the feature sizes that go with it, sit in a panel of their own — the same
fieldset the item form and the backup window use. Everything above it adjusts your data; this
replaces it, and the panel is what says so. Each of those fields sits beside its own
explanation rather than across the block from it.
Both typed rows share one grid, so the label columns are the same width and the two paragraphs beside them start on the same edge. They were a grid each until 2026-08-27, which sized "Work items per feature" and "Work items finished per week" independently and left the prose 39px out of line in planning — the one state where both are on screen at once.
That panel ends where its text ends. The alternative — running the paragraph out to the full width of the block — measures at 146 characters a line against the 83 it reads at now, roughly double the ~75 every column of prose is set to and for the reason that beyond it the eye loses the start of the next line. So the box comes in to the text rather than the text going out to the box, which puts its right edge in line with the knobs above it and the button below: all three end where their own content does.
That ⓘ is also why the fold is a plain button with aria-expanded rather than a <details>. A
<summary> is a button in the accessibility tree, so a help dot inside one is a nested
interactive control — axe fails it, and a screen reader cannot reliably reach the inner one. No
placement inside a <details> worked, because anything but the summary disappears with the body
exactly when somebody wants to know what is behind it. The cost is that a browser's find-in-page
no longer opens the block on a match inside it.
Four of the eight are about features, and they do not exist on the item lens. Three of the rows below scope growth in that table — features discovered later, how well understood they are, how many are worked at once — and the typed feature size at its foot are read only by the feature forecast. Counting Work items, those controls hide and their settings stop being claimed: the summary count, the scope-multiplier line and the list under the tiles all describe only the knobs that moved the number in front of you. The values are kept, not cleared, so switching the lens back gives you your scenario again. Until 2026-08-26 only the controls hid, and a scenario set under Features went on announcing itself — "2 settings on", "multiply the scope by 2.60×" — over an item forecast that had read none of it.
Two of these would double-count if they were named badly, so they are named carefully. "Scope grows 20%" and "20% more features" are two ways of saying +44% on the same number, and a reader who set both because the labels sounded like different risks would get a compound they never intended. So one is growth within the features you counted and the other is features you did not count — genuinely different quantities — and the combined effect is printed as one line: "Together, the scope settings above multiply the work by 1.20× to 1.44×." It says the scope settings rather than these because it sits under the whole grid rather than under those two boxes, and it drops to the singular where only one scope knob is on — which on the item lens is the only case there is.
No team setting can forecast a speed-up. The steps run from 1.0 downwards, because a reorganisation making a team faster is the most-abused claim in this business and this app is not going to supply the arithmetic for it. If the team is unchanged, the default is the honest setting.
The tick follows your data until you touch it. It arrives checked wherever the app would otherwise refuse a forecast for want of history — nothing recorded at all, fewer than eight whole periods, or periods with nothing finished in them — and unchecked wherever there is history to resample. That is the app's own refusal condition rather than a second opinion about it, so the boxes are enabled in exactly the cases the card would otherwise have nothing to say in — enabled, not shown: they live inside Adjust for what you know, which stays folded or open exactly as you left it — and the tiles read waiting for a pace under "Adjust for what you know" below rather than naming history you have no way to conjure. The two chart cards name the same route beside their own (group by a shorter period, or widen the window), so the tiles and the cards agree; over a plan with no history at all the cards name the typed pace alone, rather than offering to widen a window over nothing. (Until 2026-09-04 the tiles said waiting for a pace below with the fold shut — pointing at a box that was not on screen — and the cards below them gave a different remedy.)
It is a default, not a rule. The setting is three-state — on, off, and not chosen — so the first press wins for good, in either direction: untick it over a brand-new team and it stays unticked; tick it over a team with a year of data and it stays ticked. Reset to No Adjustments hands it back to the data.
A typed pace replaces history rather than blending with it — a blend is traceable to neither source — and the team setting is switched off while it is on, because multiplying a guess by a guess compounds two people's pessimism. The The team doing the work picker greys out to say so, rather than leaving a live-looking control that is being ignored. A typed pace also spreads less than real periods do: no quiet weeks, no spikes. The card says so rather than fudging it.
Ticking the box and typing the range are two separate steps, and only the second changes a figure. Ticking it opens the two boxes; until a number is in them the forecast is still the plain one, claims nothing under the tiles, and is refused by the same eight-period floor as before. This is worth stating because it used to be wrong the other way: the box un-ticked itself whenever the range was empty, and since the range is hidden until the box is ticked, the control could never be switched on at all.
A feature forecast is item throughput converted through the sizes of your finished features. Where those sizes can be measured they should be: ten finished features are a better guess about the eleventh than anybody's estimate of it. But sometimes you are holding something the history is not — the last ten were a migration, the next batch is bigger, or too few have finished to measure at all — and until 2026-08-27 the app's only answer to that was widen the date window. The two typed-size boxes existed only in planning mode, which disappears the moment any team holds a row.
So there is a second tick in Typed, Not Measured: "Use a typed size instead of your finished features". It is on screen only on the Features lens and only where there is data. On the Work items lens a feature size means nothing.
In planning there is no second tick, and the size boxes ride with the pace one. There is no measurement there to choose between, so nothing needs choosing — but an unticked pace over no history is no forecast at all, which makes a size box standing beside it a number with nowhere to go. The one tick in that panel governs everything under it, which is also how anyone reads a fieldset with a single tick at the top. With data the two are independent and must stay so: a board with history already has a pace, so a typed size on its own is a whole answer.
It had to be three things at once, and each is a way this could have gone wrong.
Opt-in. Off by default, and deliberately not three-state like the typed-pace tick. That one has a default that follows your data; this one must not, because defaulting a typed size on wherever the finished features look thin would swap a measurement for a guess on somebody else's board without their ever saying so. Ticking it and typing a range are two separate steps, and only the second changes a figure — a ticked box with empty boxes leaves the measured size standing, exactly as a ticked pace with an empty range leaves the plain forecast standing.
Loud. Once a size is typed, every sentence that was reporting a measurement stops:
- The basis tile reads "Built from 20–30 items a feature — typed, not measured" rather than "Built from 6 finished features, sized at a median of 3 items each".
- The line under the tiles says the answer is worked out from how many of them you typed a feature takes.
- It is listed first in This is not the plain forecast — ahead of the scope knobs, because a reader scanning that list should meet the largest departure from their data at the top — and it is counted in the summary, so a folded block cannot hide it.
- The exported figures table carries it and what it displaced: "typed, not measured · 20 to 30 items a feature, over 6 finished features at a median of 3". A percentile that arrives in a spreadsheet saying only typed invites the reader on the other end to assume there was nothing to type over. There usually was, and how much of it there was is the whole of whether the typed number was a good idea.
- The per-feature schedule is built from the same sizes. The last row of that table and the tile above it must never disagree about how big a feature is.
Undoable. Reset to No Adjustments un-ticks it and empties the two boxes, and the button goes live for a typed size even when the tick is off. It shipped keeping the numbers, on the reasoning that re-ticking should not cost a retype, and that was wrong twice over: in planning nothing gates those boxes, so a size left behind goes on driving the answer while the button claims to have cleared everything — and with data, a visible box still holding a range under a button reading Reset to No Adjustments asks you to believe two things about one screen. A convenience is not worth a button that lies about its own reach.
The board it rescues. Fewer than five finished features used to end the forecast with widen the date window until it covers more finished features — the one thing a reader with four finished features and a planning conversation on Thursday cannot do. That message now names both ways out, and with the tick on but no number typed the tiles read waiting for a size below rather than not enough history, pointing at the box that is open rather than at history the reader has no way to conjure.
The join-rate floor does not apply to a typed size. That guard exists to stop a half-filled Parent key column being read as a size distribution; under a typed size there is no measured distribution left for it to guard.
What it is not. The two knobs that could already move feature size — Each known feature grows by and How well understood are they — are percentages laid on top of the measurement, and they still are. This is the size itself.
The two questions above each take one thing and give you the other. A third tile takes both — the scope you have and the date you were given — and answers with the only thing neither of them says: how fast you would have to go.
It is a multiple of your own pace, not a flat rate. The app scales the periods you actually delivered and re-runs the forecast until the answer just reaches the date, so a team that delivers 2, 9, 4, 7 stays a team that delivers 2, 9, 4, 7 — only faster. A required rate worked out against a flat average would be a promise about a team nobody has.
"Pace needed: 2.4× — 10.2 work items a week against the 4.3 you average."
Under one it reads as headroom, not an instruction: "Pace in hand: 5× the pace you need for 15 November. You could drop to 0.9 work items a week and still make it." And when no realistic pace reaches the date it says exactly that, rather than quoting a number like 19.97× that reads like a plan.
The pace is always in work items, even on a feature forecast — nobody speeds up by completing features faster.
+12 weeks (a PI) beside the date box — beside it, not under it, so the row stays one line of labels above one line of controls — for the question an RTE arrives with. It counts twelve weeks from wherever the forecast starts and says so: this app has no PI calendar, and one that guessed at your increment's start date would be wrong for everybody whose increment did not begin the day their data ends.
The forecast, as figures — a table at the foot of the tab, under the two cards, holding every answer above, so it can be copied or downloaded into a plan. The percentile rows are drawn as shaded rows beside a histogram, which is right on screen and cannot be exported; this is the same numbers in the one shape the CSV writer reads. It carries the assumptions in the same file, because a percentile that arrives in a spreadsheet without the scenario that produced it is a number nobody can check.
Every box in this group re-runs ten thousand simulations when it changes, which is why the
listeners were on change rather than input — an input handler would forecast against 1, 12
and 120 on the way to typing 1200. What that missed is that a number box fires change on every
press of its own up and down arrow: there is no blur to wait for. One run costs about 114ms of
blocked main thread, so twenty presses of a held arrow was two seconds in which nothing moved.
Reported by Charles on 2026-08-27, on the scenario knobs; the Number of items to finish box had
it too, and worse, because its listener called the heavier of the two renders.
The first press still answers at once. This leads and then trails rather than simply waiting for a pause — a plain debounce makes every single press feel broken in order to fix the case where there are twenty. Presses arriving within 120ms of a run fold into one more run at the end of it, and the save never waits, so a value can't be lost by navigating away mid-burst. Twenty presses now take about 130ms of wall clock instead of two seconds.
Nothing is hidden in an ⓘ. A non-default scenario is listed in words under the tiles, the tiles themselves read "85% of adjusted runs", and the folded block's summary says how many settings are on — so a shut panel is never concealing an adjustment and a screenshot of one tile still says it is not the plain forecast.
And there is a point past which it refuses. The guard is the careful answer over the middle one. Unadjusted, that ratio sits around 1.3 on the demo's own data. At 2.5× the forecast stops answering, and the refusal names the ratio and which knob to turn back first.
That threshold is measured rather than reasoned. It was first set at 3× on the assumption that three stacked knobs would land about there — which turns out to be wrong, because a forecast sums many feature sizes and walks many periods and both of those concentrate the result. Ten features with scope growth, "barely understood" and a brand-new team all on measures 1.65; the same three knobs on a single feature measures 2.95. The ratio only grows where there is little to average over, which is exactly where a forecast is least worth trusting.
Working more features at once does not finish them sooner. The team delivers what it delivers, however it is spread about, so under any schedule that never leaves it idle the date everything is done is identical. What changes is which feature lands first.
That is the finding, not a limitation, and the card shows it. On the demo, five features one at a time: the first by late September, then roughly every three weeks, the last in mid-December. The same five all at once: nothing until late November, then all of them. All five done: mid-December either way.
It answers at all three confidences — 50%, 85% and 95%, a column each, the same three the two histograms above it give. It shipped with two, which made it the only card in the group answering a different set of questions; and because the CSV writer reads this table off the page, the file people took into a plan was missing the careful figure too. The columns are built from the app's own list of confidences rather than a list of this card's own, so the two cannot drift apart again.
Two things the schedule says out loud, because both are easy to get wrong:
- The dates are not all achievable at once. Each is that feature's own answer at that confidence; the chance every one of them lands on its 85% date is far lower than 85%, and lower again at 95%. Only the last row also means "everything by then".
- It does not charge for splitting attention. Real throughput usually falls as more is started at once. This model holds it constant, so parallelism looks free here and is not.
The question, the scenario and the unit go into a read-only link along with the data, so a recipient sees the forecast that was sent rather than the app's defaults over somebody else's numbers. The assumptions travel with the answer they belong to — a link is how a forecast reaches a planning room, and two people reading different numbers off the same link would be worse than useless.
The scope deliberately does not travel: it names teams, and a link carries only the teams it was asked to.
It assumes the next few periods look like the ones on screen. That is stated on the tab itself, every time, rather than hidden in a help note — and it is why the date window is part of the forecast rather than just part of the charts. Narrowing to 3 months is how you ask "what if we carry on at our recent pace?"; opening it to 12 asks the same question of a longer, and possibly less relevant, history. A window stretching back past a reorganisation forecasts a team that no longer exists.
Below eight whole periods it refuses outright. Both cards say so and name the control that fixes it — group by a shorter period, or widen the window. With a handful of observations the shape of the answer is a fact about which four periods you happen to hold rather than about the team, and reporting a confidence there would be inventing one. Grouping by month over a 3-month window is the usual way to meet this, and grouping by week is the usual way out of it.
The same data and the same question always give the same answer. The random number generator is seeded with a constant, so a forecast never moves a day between renders — switch the filter and switch it back and the figure is where you left it. The uncertainty is stated by the spread on the chart, which is where it belongs; a number that also jittered would read as the app being unsure of itself.
Answers are given to the day, even though the sample is dealt in whole periods. When a run crosses the finish line part-way through a period, that period is counted as the fraction of it that was needed — reaching the tenth item three items into a week that delivered five counts as three fifths of a week. Without that, a weekly team would answer "2 weeks" to almost every question anyone asked, and the chart would be four bars wide.
It counts items, not points or value. So it is only as good as your items being roughly comparable in size — which, on a board whose cycle times cluster, they usually are, and if they are not, that shows up as a wide spread rather than as a wrong answer quietly given.
Every chart card has a ⤢ button in its top-right corner. Press it and that chart fills the window — the same chart, the same figures, drawn at four or five times the size, which is the difference between "there is a spike around week 29" and being able to read which week it is. Press it again, press Esc, or click the margin around the card to come back. Everything else on the page stays exactly where you left it, including which tab and which section of the dashboard you were on.
Step between the charts without coming back down. Beside the ⤢ are a ‹ and a ›. They walk the charts on the screen you came from — the sub-tab you were on, so from Cycle time the arrows reach the other Flow charts and not the Health ones — and they wrap round at both ends. The left and right arrow keys do the same thing, unless the caret is in the team or theme picker, where an arrow belongs to the picker. The arrows aren't there when the screen behind has only one chart to walk. A step by key leaves the keyboard on the new chart's ⤢ — so Tab and Esc carry on from the chart you are looking at, not from the top of the page. (Until 2026-09-04 a key step dropped the focus onto the page underneath, because the button that had it went back down with the old card.)
The menu stays put. The header — the team picker, the theme, Teams & Stages, Back Up and Share — is still there above the chart and still works, so you can flick a chart between two teams without leaving it. That is why this isn't the browser's own full-screen mode: that one takes the header, the tabs and the address bar with it, and you would have to come back out to change anything.
A few details:
- The button only appears when there is a chart under it. Lead time on a team with no created dates shows its explanation instead, and there is nothing to enlarge — so no button.
- If the chart goes away while it is filling the window, the window comes back down. Switching to a team that can't draw that chart is the way you would meet this.
- Charts still do everything they do at ordinary size. The ⓘ still opens, tooltips still follow the pointer, and on the two scatters pressing a dot still copies its key.
- The walk is re-read, not remembered. Change team while a chart is up and the arrows go with it: a team with no created dates has no lead time chart, so it is one stop shorter.
- The Time in stage card has no button, because it is a table rather than a chart — the Copy button beside it is the thing worth having there.
- It works in a shared link too. Like everything else on a chart it writes nothing: which chart is enlarged isn't saved anywhere, so a reload brings back the dashboard as it was.
- On a phone it is worth more, not less: the header is one or two lines and the chart gets everything under it, which is roughly twice the height a card gives it.
⌕ Find in the header — or ⌘K / Ctrl-K from anywhere — opens a search box over everything the app holds. Type two characters, and clicking a result takes you to it — or press Enter to take the first result, which for a key is the one you meant and for a word is the newest match. With nothing matched, Enter does nothing and the box waits for the next character. (Until 2026-09-04 Enter did nothing at all; the only road to a result was a click or a Tab onto it. The same rule holds across the family.)
It's the same window, in the same place, with the same shortcut as Money Map's and Sprint Predictability's — one habit across the family rather than three.
What it reaches:
- A work item — or a feature — by its issue key.
DAE-1023finds it whichever team holds it, and the result opens straight into that record's editor, on whichever list it lives in: the Count switch follows the result, so an item found while the switch sat on Features opens the item, not the feature at the same position. (Until 2026-09-01 Find walked the items only, and opened whichever list the switch happened to be on.) A feature says feature in its result line, because the key alone does not tell the two lists apart. Until now the only way back to one item was to know its team, open that team's Your Data tab and read down the table. - A work item by its type — every
Bug, newest first, across every team. - A workflow stage, by its name or by any of its aliases. The aliases are typed once in a dialog and then never shown again, and they are the usual answer to "why is nothing landing in Review?" — so the result lists them.
- A team, or an ART, when the picker has more of them than you can scan.
With a chart filling the window, ⌘K still opens — Find is a window like the help window. A result that leads somewhere else (a work item on Your Data, an ART on All Teams) brings the chart down first, the way printing does, so the editor opens on the page it belongs to and the keyboard lands on that tab when the editor closes. A team result, or a stage result, is on the screen you are already on and leaves the chart up — the team picker stays live over a chart on purpose, and Teams & Stages is a window over it. (Until 2026-09-04 the editor opened over the full-screen chart, and two Escapes later the chart came down onto Your Data with the keyboard on nothing.)
Results are capped at 80, and the list says how many more matched so the cap is never silent. A shared read-only link searches only teams and trains, because the item editor and the stages window aren't there.
Find stores nothing and reads nothing new. A team name, a stage name, an alias, a status, a work type and a key-shaped issue key are the only words this app keeps at all — see What Isn't Here, and Why — and Find can only reach what those boundaries already let in.
Every table of figures — All Teams, the Loaded Data list on Your Data, Time in stage and Features still open on the Health tab, and the Forecast tab's The forecast, as figures and When each feature lands — carries Copy and ⬇ CSV in its heading.
| Button | What it does |
|---|---|
| Copy | Puts the table on the clipboard tab-separated, which pastes as a real grid into an email, a slide or a spreadsheet |
| ⬇ CSV | Downloads a file, for keeping or for opening in Excel |
Two buttons because there are two jobs and each is bad at the other's: a pasted CSV lands as one column of text and has to be run through Text to Columns, and a file has to be a CSV to open as a spreadsheet at all.
What you export is what you are looking at. The tables are read off the rendered page rather than rebuilt from stored data, so every choice you have already made applies — the work type filter, the date window, the grouping, which ART is in scope, which column the table is sorted by — and the file cannot quietly disagree with the screen it came from. Display furniture is dropped: the ⓘ buttons, screen-reader-only text, and the ART printed under a team's name, none of which are values in a cell.
The filename says where it came from and when — flow-metrics-all-teams-2026-08-20.csv, or
flow-metrics-all-teams-payments-art-2026-08-20.csv when you have scoped to one train, so two
exports taken a minute apart don't land in Downloads under the same name.
The buttons stay on in a shared view, unlike every other control there. Everything else a shared view strips is stripped because it would write; this writes nothing and can only hand back figures already on the recipient's screen. Sending a link is how a colleague gets these numbers — letting them paste the table into their own notes is the point of it.
One detail worth knowing: a spreadsheet treats a cell opening with =, +, - or @ — or
with a tab or a carriage return in front of one of them — as a formula, so a team called
=1+1 would be executable the moment the file is opened. Those cells get a leading apostrophe,
which Excel, Numbers and Sheets all read as "this is text". A genuine number is left alone —
net flow is negative for half the weeks on a busy board, and quoting it would break the
arithmetic you exported a CSV to do.
The two tables in the Settings and Teams & Stages windows have no export buttons: they are configuration — a Display→Value mapping, and a list of names — rather than figures anybody puts in a status email.
The item list sorts the same way the All Teams table does: press a heading to sort by it, press again to reverse, and a third time to turn it off.
It opens — and returns to — items still in play at the top, then newest first, which is the order that answers "what is open right now?" without asking for anything. Pressing a heading asks for a different order rather than replacing that default with whatever was last pressed.
Each column runs the useful way on its first press: dates newest-first, cycle time longest-first.
Item is the one exception and runs A to Z, because a list of keys has no most-interesting
end — you scan it for one you already have in mind. It groups by project and then runs in
issue-number order, so DAE-10 comes after DAE-9 rather than between DAE-1 and it.
Absences always sort last, whichever direction the column is running — an item still in
progress has no completion date and no cycle time, so it has no place in an ordering by either,
and letting it win the top would be the one result nobody could read past.
The period column sorts chronologically, by the completion date behind it rather than by its own label — "Aug 2026" and "Sep 2026" sort backwards as text.
Because export reads the rendered page, the sort travels with it: sort by cycle time, press ⬇ CSV, and the file arrives in that order.
Ctrl-P / ⌘-P prints the view you're looking at, and the page is laid out for paper rather than photographed off the screen. What goes is everything a piece of paper cannot use: the tab strip, the three pickers, the header's buttons, the ⓘ circles, the maximise buttons and the export buttons. What stays is the figures, the charts, and — the one that matters — the note saying which dates they cover, plus a line naming the team or the train. A figure on paper without its window is worthless, and the header's team picker is one of the things that has just gone.
A dark theme prints as a light one. Browsers don't print page backgrounds, so Midnight and Dark would otherwise come off the printer as pale grey text on white paper, with charts drawn in colours picked to sit on black. The page switches itself to the Light theme for the duration of the print and back afterwards — no colour is invented for paper, and nothing is saved, so the swap can't outlive the print. Light and Sepia are left exactly as they are; both are already ink on a pale ground.
Charts print because a canvas is an image, drawn at device resolution, so it scales down cleanly onto the page. A chart filling the window is brought back down first — printed as it stands, it would be one chart on page one and a blank page two.
For figures somebody needs to use rather than read, the Copy and ⬇ CSV buttons are still the better route.
Years of history make every paste and backup heavier without telling you anything new. Your Data → Clean Up Old Data → Remove Old Items… drops the items older than a cutoff you choose. It is not the way to shorten a share link — the share dialog has its own history window for that, and it deletes nothing:
- How much to keep — the last 3, 6 or 12 months, the last 2 or 3 years, or everything from a date you pick yourself.
- Which teams — any combination. Teams with nothing in them can't be picked. Once any team is on a train the list is grouped by train, exactly like the share window's: each ART's heading has a tick box that picks or clears that train's teams (only the ones holding items), shows partly ticked when only some are, and can't be pressed when all its teams are empty.
- Unfinished items — off by default, and worth leaving off. An item with no completion date is still in progress however old its start date, and it still counts as work started on the net flow chart.
The completed date decides. An item that took a year to finish but finished inside the window stays — the start date never drags it out.
Relative options count back from the newest item in the data, not from today, which is the same anchor the dashboard's own date window uses. It matters: without it, loading last year's export and picking "the last 12 months" would leave you one press from deleting all of it. Whichever option you pick, the exact cutoff date is named before you commit.
Nothing happens until you press Remove Items. Until then a running summary says how many items would go and how many would stay, broken down per team when you've picked more than one, and it calls out by name any team the cutoff would empty completely. The button stays disabled while there's nothing to remove. There's no undo, so the dialog offers the same JSON download as the Back Up button — one press away from a deletion is exactly when a backup is worth having.
Removing items only removes items. The team itself survives, even if it ends up empty.
The Back Up button in the header opens a dialog (the same shape as the sibling app's)
that writes one JSON file holding
every team, their work items and your shared settings — flow-metrics-YYYY-MM-DD.json. It's
a copy you keep, independent of this browser. It is the only copy of your data that exists
anywhere else, and the only way back from a cleared browser.
Open twice, it stays one board. With the app open in two tabs — or an installed window and a tab — a window that is sitting idle picks up the other's changes as they are saved, and a window that was about to save over a newer board loads that board instead and says so: "This board was changed in another tab or window… Your last change here was not saved — make it again." (Until 2026-09-18 the window that had not been reloaded silently wrote its old board over the other's work the next time it saved — a paste loaded in one window could vanish after a Settings change in the other.) Which tab and filters you are on stay each window's own. A paste that was turned away this way stays in its box with "Nothing from this paste was saved" under it, so it can be loaded again; and nothing a button says afterwards — "Deleted Team X" — covers up the warning. (Until 2026-09-23 the paste box was emptied under a report saying it had loaded, and the success message replaced the warning.) If the other window is running a newer version of the app, this one stops with its out-of-date notice rather than claiming storage is full.
Restoring replaces everything. You're shown what the file holds against what's already here — "Restore 2 teams and 3 items from this file? This replaces the 1 team and 0 items in this browser" — and nothing changes until you confirm. Restoring on another device is how you move your data between devices. A restore that worked closes the window behind it, whether it was opened from the header or from the welcome card's Restore a Backup; a file that is refused — not a backup, or from a newer version — leaves the window open, so the refusal is read where the file was chosen. (Until 2026-09-04 a successful restore left the window standing over the app it had just filled.)
A restored file goes through exactly the same sanitising as a share link (hydrateState), so a
hand-edited backup can't introduce anything a link couldn't.
Before that, isBackup() checks the file is plainly one of ours: hydrateState is deliberately
forgiving and will turn {} into a valid empty dashboard, which is right for a damaged saved
copy and catastrophic for the wrong file picked out of a Downloads folder. Choosing a file that
isn't a backup is refused outright and leaves your data alone.
If one device is behind — every saved copy carries the data format the app that wrote it understood. A copy written by a newer version than the one you're running won't be opened: you get a card saying so, nothing is changed or deleted, and reloading picks up the current version. That matters most on a device that's been offline for a while, where the browser can still be running an older cached copy of the app while another device has moved on. A backup file from a newer version is refused the same way — without stopping the app you're using — and a share link from one tells the reader the link is fine and their copy is behind.
Two things are deliberately not in the file: your theme, and which team you were looking at. Both are positions on this device rather than data.
Folded away at the foot of the same dialog, under Start Again, is Delete All Data — the whole-board version of Clean Up Old Data. It's behind a fold on purpose: the one irreversible action in the app shouldn't sit a mis-click away from Download Backup (JSON).
Pressing it opens a confirmation of its own that lists exactly what is going — "This deletes 2 teams and 3 items, along with 1 ART, 4 workflow stages and 7 statuses" — and offers the same JSON download as a last chance to keep any of it. (Until 2026-09-04 the dialog actually said "1 ART and 4 workflow stages and 7 statuss" — this paragraph had promised a sentence the dialog did not say.) The ARTs, the statuses and the stages go with the teams: the status list is made entirely of words read off an export, a stage groups them and an ART groups teams, so all three are data. The status list is the clearest case of it — leaving it standing would leave behind exactly what somebody pressing that button is most likely to be trying to remove. Your settings are kept, which is the line the delete draws — the labels, the thresholds, the work type filters and your theme are configuration, and the dialog says so. There is no "…and every device you own" line any more: since sync was removed there is exactly one copy, and it is the one in this browser.
A forecast scenario goes with the data, and is named in the confirm when there is one to lose. It is an adjustment to what was measured, so left standing over an empty app it would be invisible until the next paste — at which point a forecast nobody had asked to adjust would come out adjusted. The typed feature size goes with it, for the same reason: it stands in for a measurement.
Your settings and your theme survive. Starting fresh isn't asking to lose the type labels, filters and ageing threshold you spent time tuning — those are configuration, not data. What's left is exactly what a brand-new browser gets: one empty team to paste into.
And it puts you back in front of the welcome card, which is what the toast has always claimed. Two flags meant "this reader is past the front door" — the one Start Fresh sets for the sitting, and the planning flag, which persists — and deleting everything is the one act that genuinely undoes both. The siblings get this for free, because their welcome cards are derived from their data alone; Flow Metrics needs a dismissal flag at all only because Start Fresh creates nothing to remember.
The Share button in the header builds a link that shows someone the teams you pick, read-only —
no sign-in, no way to change anything, and (ported from the sibling app) the data travels inside
the link itself: everything after the # never leaves the browser, so the figures reach the
recipient without GitHub Pages or anyone else seeing them. The payload is a trimmed copy — the
chosen teams, the settings, the trains, stages and statuses those teams use, and the forecast's
question and scenario (the count, the date, the unit and any adjustments you set) — because those
drive every number on the page. No theme and no other view state travels.
Once any team is on a train, the team list is grouped by train — each ART's name heads its own teams, in the order the Teams window lists them, with teams on no train last under No ART. The heading has a tick box of its own: tick it to pick every team on that train, untick it to clear them, and it shows as partly ticked when only some are. It is only a shortcut for ticking teams — the count still counts teams, and nothing about the heading goes into the link. A board with no teams on a train keeps the plain list.
It carries the same fields the app stores, issue keys and status names included. That is deliberate: the keys name the items on the charts and the statuses name its columns, and a link that dropped either would show the recipient a different picture from the one you are looking at. Nothing else out of your work system goes — no summaries, no names — and both fields have passed the same guards in a link that they passed in storage, so a link cannot carry anything in them the app would not have saved. Only what the link's own items need travels: the statuses they are sitting in, not your whole list. The dialog says so above the link. A recipient still on an older cached build simply sees dots named by work type, as they were before keys existed.
A team's limit and target travel with it, so the lines on the charts and the verdicts on the tiles read the same for the recipient as for you. The project id deliberately does not — it routes a paste the recipient has no way to make.
Stage times travel too, and so do the stage names they belong to — they are what the figures are, and a link carrying counts without names would arrive showing nothing. Only the stages the shared items actually spent time in go, on the same reasoning that sends only the trains those teams are on: a stage name describes your workflow, and sharing one team should not publish the shape of a workflow that team has nothing to do with. The list of Jira statuses you typed does not travel at all — it is a matching rule for a paste box the recipient does not have, and it is the one field in the app typed to mirror a work system's own words.
This dialog carries more than any other, so on a screen 760px or wider it opens 1100px wide — the family's share-window width — with its two choices side by side, matched in height, rather than stacked. That is the point of the extra width — widening a single column only makes the lines longer. Below that it stacks and behaves as before, and no other dialog changes: the ⓘ help window is a paragraph of prose, and a wider measure makes prose harder to read, not easier.
How much history decides how far back the link reaches, in the same words the clean-up
dialog uses: everything, the last 3, 6 or 12 months, the last 2 or 3 years, or everything from
a date you pick. Nothing is deleted — this only trims what rides in the URL, which is what
makes a long history shareable without having to delete it first. Months count back from the
newest item in the data (same anchor as the clean-up tool and the dashboard's own window), and
an Unfinished items box, off by default, decides whether items with no completion date go
along regardless of how old their start is. The line under the link reads 219 of 600 items — from 18 Nov 2023 so the cost of a longer window is visible before you send it; a window that
would leave nothing at all says so.
The recipient sees a standing "Read-only view" bar naming the link's teams (rebuilt from the
team names it carries, never taken from free text in the link), the dashboard only (no Your Data tab, and
none of the header buttons that write — Teams & Stages, Back Up, Share or Settings), and a link
back to their own data. Nothing they do is saved, and nothing
already in their browser is touched — save(), persist() and saveView() are all
no-ops in a shared view, and no service worker is installed. A link that arrives truncated (mail
apps do this) shows an error card rather than ever falling through to the viewer's own
data.
A trimmed link carries its cutoff as from, and the read-only bar says "Covers work from
18 Nov 2023 onward" — a windowed copy must never read as the team's whole history. The date
comes out of a link, so it's re-validated before it's shown, like everything else in there.
from is written only when a window was used, so an untrimmed link is byte-identical to the
ones the app built before, and a build that predates the field ignores it: the link still
opens, just without the line saying where the history starts.
It's a snapshot: later edits don't appear in links already sent, and a sent link can't be withdrawn — treat it like emailing a spreadsheet.
Chrome's Install page as app, Safari's Add to Dock and iOS's Add to Home Screen all
turn Flow Metrics into a real app window with its own icon, rather than a browser tab or a
shortcut with a blank square next to it. That takes a manifest.webmanifest and PNG icons —
neither the inline SVG icon nor favicon.ico is any use to any of them — and both are in the
repo, drawn by make_favicon.py from the same mark the favicon uses.
Installing is a window, not a sandbox: an installed app shares the browser's storage, so
nothing about it changes what any page on this origin can already reach. The manifest's scope is
its own directory, which matters more than it looks here — every one of these apps is served from
the same origin, and a scope of / would capture Sprint Predictability and Money Map into this
app's window.
The offline cache below came first, which is the wrong way round: an installed copy is the one most likely to be opened with no network at all, so the manifest and its icons are cached with the rest of the shell.
The app keeps a copy of itself on your device, so it opens with no network at all — on a train, on hotel wifi, or when the work VPN is being difficult. Your teams and work items were always local, so once the page loads everything works: pasting, the charts, cleanup, export, share links, backup and restore. There is no longer any part of the app that needs the network — sync was the one exception, and it is gone.
What's kept is only the app's own public files — the page, its privacy policy, the stylesheet, the chart library, the icons and the install manifest, the same files anyone can read on GitHub. Nothing of yours is ever put there, which matters more than it sounds: every one of these apps shares a single browser origin, so that cache is not private to this app.
The network is always tried first, and the stored copy is used only when it genuinely doesn't answer (or takes more than five seconds). So you can't be left running an old version while you're online — and if a device does end up behind, the version check described under Back Up & Restore stops it misreading anything.
sw-kill.js sits in the repo unused, as an escape hatch: copying it over sw.js and
pushing makes every installed copy uninstall itself and go back to being an ordinary
online-only page.
This app used to offer optional Google sign-in, which mirrored your teams to a Firestore
database in a Firebase project owned by the author. It is gone. Not disabled behind a
null config — removed: the module, the sign-in button, the reconciliation dialog, the
firestore.rules file and every Google address in the Content-Security-Policy went in one
commit.
Why. This app holds figures taken from a work Jira. Sync meant a copy of them sat in a personal Firebase project, which is a place work data has no particular business being — and the feature was carrying a fair amount of complexity for it: a hostname-blocking workaround, a reconciliation dialog, an empty-copy-never-wins rule, a server-clock ordering scheme and a whole class of failure ("looks fine, has not pushed for weeks") that had to be surfaced in the UI because it could not be prevented. Removing it deleted all of that at once.
What replaces it. Back Up downloads a JSON file; Restore reads one back. That is how you move data between devices now, and it has the property sync never had: you can see exactly what moved, and it goes nowhere you did not put it.
What the removal is worth checking against. The claim is not "the Firebase code is gone" —
it is that the page cannot reach the network at all. The CSP at the top of index.html names
no external origin, and spells out connect-src 'none' rather than leaving it to the
default, because that is the directive that would carry work data off the device. tests.html
pins both, plus a word-list tripwire over the app's code so a paste-back of the old module
fails loudly rather than shipping.
Leftovers are deleted, not merely unread. clearSyncLeftovers() runs on every load and
removes td-sync-uid and td-updated. The first of those is a Google account id — the only
personally identifying thing this app ever wrote down — and keeping it after removing the
feature that needed it would be keeping an identifier for no reason. Pinned by a test that
plants both keys, boots the app and checks they are gone.
The data written before the removal was deleted too, on the same day — removing the
client deletes nothing server-side, so the Firestore collection was emptied by hand in the
console. privacy.html says so rather than promising to do it on request.
If it is ever wanted back, git log has the whole module in one commit, including the
Google Identity Services workaround for corporate networks that block
<project>.firebaseapp.com per hostname — which was real, was measured, and would be needed
again. Putting it back means putting the CSP origins back too, and the tests above will say
so.
Single page, no build step, no accounts required. Serve the folder:
python3 -m http.server 8013index.html no longer stands alone: the palette is linked as theme.css rather than
inlined, and the charts need the vendored chart.min.js — without it the page's script
stops at startup. Copying all three files (index.html, theme.css, chart.min.js) to a
folder and opening index.html over file:// still works; a server is simplest, and the
tests need one anyway.
Your data lives in localStorage and does not leave the browser.
privacy.html is the privacy policy — keep it and its effective date current
if what the app stores, or where it sends it, ever changes. The footer links to it, and to
this README on GitHub as How it works, for anyone wanting more than the in-app ⓘ dialogs.
A Content-Security-Policy <meta> at the top of index.html names no external origin at
all. Since sync was removed there is nothing for it to allow: no CDN, no Google, no
analytics. default-src 'none' is therefore the real rule rather than a formality, and each
directive below it is an exception it has to earn — including connect-src 'none', spelled
out rather than left to the default because it is the one directive that would carry work data
off the device, and worker-src 'self' for sw.js, spelled out rather than resolved through
the fallback chain.
Adding any origin there is a decision about where work data may go, not a technical
detail — and it fails only in production while working fine on localhost, so it will not
announce itself. tests.html fails if the policy names a single host.
tests.html pins the pure functions by loading the real index.html in a hidden iframe — no
copies to drift. It must be served over http://localhost, not opened as a file. The iframe is
marked data-td-tests; that was how the sync module knew to stay off inside the harness, and
the attribute is kept — it is the harness's only way to say "this is a test frame", and the
next thing that must not run in one will want it.
It only runs on localhost, and enforces that itself. file:// is deliberately not treated
as local: it has no hostname, and the empty string used to sit in that allow-list on the
reasoning that the suite couldn't run there anyway — which sent it down the iframe branch, where
the frame silently fails to load and the page blamed the app. Opening it off disk now gets the
advice that fixes it.
The suite is not read-only about
storage: it plants known state through tdAdopt(), and merely booting the app in the iframe
writes this origin's td-* keys. On localhost those keys are a scratch copy. But GitHub Pages
publishes every file in the repo, so tests.html is also live at
/team-dashboard/tests.html — where the same run would replace real saved teams with
two-item test data. A gate at the bottom of the script checks location.hostname against
localhost / 127.0.0.1 / [::1] and, anywhere else, refuses: it never creates the iframe,
explains why, and says how to run the suite properly. Nothing above that gate touches storage
on its own, so opening the published copy is now harmless. Instead of running, the published copy
makes one unauthenticated read of api.github.com to show how the latest CI run went — which
makes tests.html the only page in the repo whose Content-Security-Policy names an external
origin.
(The alternative was keeping tests.html off the published site, via a Jekyll exclude or a
move into a subfolder. The guard was chosen instead because it is self-documenting and travels
with the file — a fork, a local copy, or a future host can't lose it.)
The suite also runs on every push to main and on every pull request:
.github/workflows/tests.yml serves the folder, opens
tests.html in headless Chromium and fails the build if the summary goes red or the page
throws — so a suite that only ever ran when someone remembered to open it can't silently rot.
CI reaches it at http://localhost:8013, so the localhost gate lets it through; if that ever
changed, the run would time out waiting for a summary and fail loudly rather than skip.
Beyond the metrics it covers detectColumns() (a leading key column read as the key, the dates
either way round, header names beating position, a free-text summary mistaken for neither the type
nor the key, and the real Jira headings a loose pattern would swallow — Issue id, Parent key,
Key changed date), the issue-key guard from both directions (every rejection listed one by one,
including a summary, markup and a spreadsheet formula), work-in-progress handling — including the
net-flow miscount stated as a test, and a WIP row whose empty completed cell comes first, which a
line-trim once shifted into a completed row — the week straddling New Year (whose cycle times once
vanished from the chart and tile), quoted CSV fields, the share-link codec round trip on both wire
formats, that sync really is gone (a CSP naming no host
at all, a word-list tripwire over the app's code, and the leftover keys actually being deleted at
boot), and the outside-copy boundary: sanitizeTeams() (ids arriving in a share link end up in
data- attributes and <option value>, so anything not [A-Za-z0-9_-]{1,64} is replaced, names
are capped, types coerced to strings), normalizeSettings() (including the defectType →
unplannedType carry-over, and junk filter entries or a junk same-day value being coerced rather
than trusted), and isBackup(), the guard that stops the wrong JSON file being restored over real
data.
Statuses and workflow stages get the longest guard group in the suite — because they are the
one field whose source is a Jira status, and the safety does not come from a check on the value.
The guards are pinned (a day count is a plain number — 3d 4h, 12:30, a negative and a
six-digit value all refused; an alias is capped and dropped whole past it; a hostile or dangling
stage or status id never reaches storage, and the day-count object has no prototype for a
__proto__ key to reach) and so is the route (matching is exact rather than substring, the
stage name is not an alias, two columns feeding one stage are added, and two stages claiming
one status is reported or resolved to the first rather than left ambiguous).
The repetition gate gets the most of it, because it is the leg that replaced "no status name is ever stored". It is tested from both sides on two 200-row pastes that differ in nothing but how much their status column repeats: the one with 187 distinct values stores nothing and reports counts with no cell in them, and the one with six stores all six. The label guard is pinned on each shape it refuses — and pinned, deliberately, on the fact that a short summary clears it, so nobody can mistake it for the boundary. And the claim underneath the design is asserted directly, in the form that survived the reversal: the parsed rows are stringified and checked to contain no status name at all, on hand-written fixtures and again on the demo's own data — because a row carries an id and the words live in one visible list.
Click-to-copy is pinned on the part that can go quietly wrong: a dot with no key saying so rather than copying its work type, a reference line yielding nothing, and — the one no pure test can see — both scatters actually carrying the handler, as the same function, while a chart whose points are periods carries none.
The current stage gets its own group, since that is where the untrusted text sits in a cell on every row rather than in one heading: the anchored heading against the real Jira columns a loose pattern would eat (Status Category, Status changed date), a Status column not being mistaken for the work type, a finished item taking no stage however its status reads, a dangling or unsafe stage pointer being dropped, and the age chart switching axes — stage columns in the reader's order with counts on the ticks, work type ranked busiest-first when no item in flight carries a stage.
Two promises get pinned end to end rather than function by function:
buildSharePayload() — a share link holds only the chosen teams, the settings, the trains,
stages and statuses those teams use, and the forecast's question and scenario, with no theme and
no other view state — and migrate(), the v1 upgrade,
exercised the way it really runs: the old td-rows/td-settings keys are planted, a second
hidden copy of the app boots, and the suite checks the single team it folds them into.
The share window is pinned on all four of its promises: only rows inside it go into the link, unfinished items stay unless the box is ticked, the app's own rows are untouched by building a link, and a windowed link really does come out shorter than the whole-history one.
Cleanup gets the same treatment, since it's the one action with no undo: outsideWindow() is
pinned on both sides of the cutoff (the cutoff day itself is kept), on work in progress with
and without the box ticked, and on the case that would hurt most — an old start date with a
recent completion, which must stay. historyAnchor() is pinned to the newest date in the data
that has happened — a planned date after today never moves it — rather than today, and windowCutoff() on each shape of answer — including a half-typed custom
date, which must yield no cutoff rather than a guess. These three are shared with the share
dialog, so both dialogs sit on one set of tests. One end-to-end check runs the whole reference
sample past a 3-month cutoff and asserts every item is either kept or removed, never both.
The expectations are pinned to a fixed 141-item sample, right down to the weekly throughput
series, 10.2857… days average cycle time in week 1, −5 net flow in week 1, and the pooled
20.16% defect share in the defect rate chart title. Change the maths and the suite says so.
Why there is a package.json in a repo with no build step. It is not a package and it
installs nothing — it exists so Dependabot has a manifest to scan. Its only entry is the
Chart.js that is vendored as chart.min.js beside the app, pinned exactly, and CI passes
--omit=dev so npm never downloads it. Dependabot cannot re-vendor a file, so a version-bump
PR would otherwise raise the manifest while the app went on serving the old bytes; a test pins
the two to the same version, which makes a manifest-only bump fail and turns the PR into the
right instruction — update the file too, in all four repos that carry it.
| File | |
|---|---|
index.html |
The whole app — inline CSS and JS |
chart.min.js |
Chart.js 4.4.1, vendored (no CDN) |
theme.css |
Copy of the palette from claude-theme-pack (a private repo); linked by index.html, privacy.html and tests.html — since 2026-08-18 it is not also inlined, so the palette lives in one place and a pack change reaches the app |
sw.js |
Service worker: keeps the app's own public files on your device so it opens offline |
sw-kill.js |
The escape hatch — copy it over sw.js and push to uninstall every installed worker |
tests.html |
The test suite — the pure functions, and the live app driven in a hidden frame. Runs on localhost only, in Chromium, as CI does |
privacy.html |
Privacy policy — what the app stores and where it does (and doesn't) go |
.github/workflows/tests.yml |
Runs tests.html headless on every push to main and every pull request |
.github/workflows/codeql.yml |
GitHub's code scanning, on every push to main, every pull request and once a week |
package.json |
Names the vendored Chart.js so Dependabot can watch it — installs nothing |
build-single.py |
Builds dist/flow-metrics.html, the app as one self-contained file (the dist/ folder is not committed) |
.nojekyll |
Tells GitHub Pages to serve the files as they are, so no Markdown file is published as a page without a Content-Security-Policy |
LICENSE, NOTICE |
The MIT licence, and who owns the app |
favicon.ico |
Tab icon — the fallback a browser fetches from the site root on its own |
manifest.webmanifest |
What makes the app installable — its name, its window and its icons |
icon-192.png, icon-512.png |
The install icons a launcher draws the app with |
icon-512-maskable.png |
The same mark full bleed, for launchers that crop an icon to their own outline |
apple-touch-icon.png |
Safari's own preference, square and opaque — Apple applies its own corners |
make_favicon.py |
Draws favicon.ico and all four PNGs above, all from the same mark as the inline SVG icon in index.html |
The icon is three weeks of flow side by side, on the midnight tile the whole app family
wears; the header shows the same mark. make_favicon.py (Pillow) keeps favicon.ico and
the page's inline SVG the same picture, rather than leaving a binary nobody can review in a
diff. Re-run it with python3 make_favicon.py, then bump the ?v= on every favicon.ico
reference — browsers hold on to an icon for a long time. The install PNGs are versioned by
sw.js's CACHE constant instead; bump that too.
Four themes — Midnight, Dark, Light, Sepia — from the shared theme pack, plus Auto, which is the default: with nothing saved the app follows your own system, Light or Midnight, and changes with it while the page is open. Midnight is the base palette and what Auto means by "dark". Palette changes belong in the pack, not here.
The first version of this app was modelled on the Team Dashboard v5 spreadsheet from Focused Objective, the freely published collection of forecasting and flow-metrics tools by Troy Magennis. It is worth a look in its own right, and so is the rest of that repo.
The metrics themselves belong to nobody: cycle time, lead time, throughput, net flow, work in progress, aged work and the 85th percentile are standard Kanban measures that predate the spreadsheet and are set out across the flow-metrics literature. What is here is an independent reimplementation of them in HTML and JavaScript: the formulas, the layout and every chart were built from scratch, and a handful of short field labels read the same only because they name the same thing. It has since grown well past the original: any number of teams, its own Flow / Delivery / Health grouping, a date window and period picker, read-only share links, four themes and a test suite. It had cross-device sync too, until that was removed on 2026-08-20 — see above.
The hosted app is four files served from GitHub Pages — index.html, the palette
(theme.css), the charting library (chart.min.js) and the offline worker (sw.js) —
plus a manifest and icons. That is the right shape for a website and the wrong shape for
"can you send me that thing you showed me": download index.html on its own and you get
an unstyled page with no charts.
⬇ Download the current build — it is attached to the
latest release as flow-metrics.html. Put it somewhere permanent rather than leaving it in
Downloads, then double-click it. Your work items are kept by the browser it opens in, not by
the file, so Back Up is how you move them to another machine. The file does not update
itself — come back to that page when you want a newer one.
build-single.py folds it into one HTML file that runs by double-clicking it. No
server, no internet, no install, nothing to put anywhere:
python3 build-single.py # writes dist/flow-metrics.html, dated today
python3 build-single.py --version 2026-11-05 # dated for that release instead
Which version is this file? The bottom-right corner of the downloaded copy reads
Version, a date and a short code, such as 2026.11.05 · b13db9e. The date is that of the
release it came from (release 2026-11-05
says 2026.11.05). The code is the commit the file was built from, so two files from the
same day still differ — a release refreshed later that day keeps its date but gets a new
code. It is stamped in when the file is built, so the website itself carries no version: it
is always the latest. Compare that corner with the newest release to see whether a copy you
were sent is behind.
The output is not committed — it is generated from index.html, which stays the only file
that is written and tested, and it is rebuilt whenever the app changes. It needs the
markdown package once (pip3 install markdown), to turn this README into the
How it works window; the file it produces still carries no third-party code.
Everything that counts, draws or stores is the same app, byte for byte. What changes is the handful of things that only mean something on a website:
| Share links | Gone. A link is built from the page's own address, and from a file on your disk that address is a path on your machine — a link that looks real and works for nobody. Both the button and the window are removed, and a #share= link opened in this copy is ignored. |
| Privacy policy, How it works, NOTICE, licence | Now windows inside the page, opened from the same words in the footer. The files they used to link to are not in the download. |
| The link to the sibling app | Gone. It points at the hosted site, so it is a dead end with no internet. Its corner of the footer shows the release version instead. |
| Install as an app, offline caching | Gone. A downloaded file is the offline copy, so the worker and the manifest have nothing left to do. |
| The security policy | Tightened. Nothing is fetched any more, so the page is allowed to fetch nothing at all — not even from its own folder. |
| Everything else | Unchanged: the calculations, all four themes, the charts and their full-screen view, Find, Back Up & Restore, CSV and Copy, printing, the sample data. |
Three sections of this README are left out of that copy's How it works window — sharing, installing and working offline — because they describe features it does not have, and a guide explaining a button the reader cannot see is worse than a shorter guide.
The same place: the browser you opened the file in, and nowhere else. One thing is worth knowing, though. Every file opened from your own disk shares a single browser identity, so what this copy saves sits alongside anything else you have ever opened that way — a weaker fence than the hosted site's. Back Up is the way to keep a copy you can trust, and it is worth pressing more often here than on the website.
Flow Metrics is an independent personal project by Charles Adams — built on personally owned hardware, with a personally paid-for Claude subscription, in a personal GitHub account. No employer equipment, funding or code went into it, and since 2026-08-20 it has no server or database behind it either: your data stays in your own browser.
It holds no employer information beyond issue keys and the names of your workflow statuses, and that is a property of the design rather than a promise: there is no free-text field anywhere in the app, and the storage whitelist admits only numbers, dates, short fixed labels, the shape-checked key and a capped list of statuses read from a column measured to be a list of statuses rather than prose. Text you paste in is parsed in the browser and thrown away — summaries and comments are never stored, transmitted or committed, and nothing is ever committed to this repository. Adding a stored field means adding it to that whitelist, or it is deliberately stripped.
Share it freely: it is MIT licensed, so anyone — including a company you work for — may use, modify and redistribute it. Running it inside an organisation conveys no ownership of it; permission comes from that licence, granted by the author as copyright holder. NOTICE records this in full.
<main> opens above the tab strip, not below it. It used to wrap the tab panel alone,
which had two consequences: the tabs sat in no landmark at all (axe-core's region rule),
and — the reason worth acting on — the skip link jumped past them, so a keyboard user who
took "Skip to content" had the entire tab row behind them, reachable only by shift-tabbing
back. The tabs and the panel they drive are one widget, so the landmark goes round both. The
share bar comes inside with them: it describes what is on screen, so it is content rather
than furniture.
role="tabpanel" still goes on the inner div and never on <main> — putting a role ON an
element IS its role, so it would silently replace the landmark. That older note stands
unchanged.
Every page in this repo passes axe-core at WCAG 2.1 A and AA, the 2.2 AA additions and its best-practice rules, in all four themes, with data loaded, on every tab and in every window (last run 2026-09-24). The things axe cannot see are checked by hand the same day: a Tab through every view reading the focus ring, every window opened from the keyboard and closed with Esc, hover colours, a 320px-wide window, widened text spacing and reduced motion.
A second pass the same way, this time pressing real keys on every control and reading where the keyboard ended up. What changed:
- The other window's changes no longer throw the keyboard back to the top. When a second tab's save is picked up here, everything is redrawn — and a sort heading or ⓘ dot you were standing on went with it, so focus fell to the start of the page. It lands on the new copy of the same control now, or on the view you are looking at when that control is gone.
- "Edit" is called "Edit". Each team's Edit button in Teams & Stages was announced as "Settings for Team X", so a voice-control user saying the word on the button reached nothing. It is "Edit settings for Team X" now.
- A status tick box under a stage is named by its status first — "Code Review, grouped under the stage in row 1", where it used to start "Group Code Review…".
- The train picker no longer calls itself a menu. It opens a list of tick boxes, but told a screen reader it had a menu, whose keys it does not use. It says whether it is open and which list it opens, as Sprint Predictability's identical picker does.
- Pressing something inside a window keeps you in that window. Ticking a status under a stage, choosing a team's ART, deleting a team, ART, stage, status or work-type row, and Save Item or Delete This Item all redraw the list they are in — and the keyboard used to fall to the top of the page with the window still open. It now lands on the same control again, or after a delete on the one that moved into its place (the list's Add button when nothing is left); after Save Item or Delete This Item, back on the row in the table.
- A window the keyboard lands on shows the focus ring. When a window is taller than the screen the browser makes the window itself a Tab stop, and Tab wrapping onto it showed no ring at all. It draws the ring just inside its edge now; opening a window with a tap still shows none.
- Wide tables with nothing to press can be scrolled from the keyboard. On a phone, Time in Stage, Feature Progress, the forecast's figures and the feature schedule are wider than the screen, and nothing in them could take the keyboard to scroll across. Each table's box is a Tab stop of its own now, named by its card's title; the arrow keys scroll it.
- Share and Clean Up Old Data fit a 320px screen. Their two-column form rows asked for at least 260px each, more than a window that narrow has inside it, so both scrolled 7px sideways. A column is never wider than the room it is given now; nothing changes on a wider screen.
- The team you are on is marked in All Teams in words too. Its row was picked out by a shaded fill and a coloured edge alone, which Windows' high-contrast mode removes. It is marked as the current row for a screen reader and for high contrast now. The tabs, sub-tabs and tick lists already said which one was chosen.
- The "saved by a newer version" card takes over the page. If another tab running a newer version saves while a window is open here, the app stops and shows a card asking you to reload — but the open window sat on top of it, so Reload could not be pressed or reached with the keyboard, and a screen reader never heard the card. The card now closes every window, keeps any later message from covering it, shuts off everything behind it, puts the keyboard on Reload and is announced as an alert. The same happens when the card appears as the app opens.
- Windows' high-contrast mode shows what is selected. The theme pack's new rule 19 fills the chosen tab, sub-tab, switch or ticked option with the system's highlight colour; high contrast used to strip the shading that marked it.
Every field used to be width: 100%. That is right for a team name, a work type or a pasted
export, whose length nobody can predict — and wrong for a number, where the length is written
in the markup two attributes away. "Weeks nobody is delivering" had a 225px box for a figure
that cannot exceed 26; the typed-pace pair had two of them for a number of items a week.
A number box now takes its width from --digits, set beside its own max — the two are
one fact, so they sit on the same tag. A date box has no digit count to read off the markup
and takes a figure of its own, deliberately generous: what it has to hold is the locale's
rendering of a date, and a browser set to spell the month out needs more room than 11/18/2026.
Text fields and pickers are untouched, because words have no known size.
The tests check the pairing in both directions, over every box on screen and in every
dialog: too narrow clips the largest value the field accepts, too wide is the dead space this
started as. A placeholder counts as content too — Sprint Predictability found that when the
same rule went in there, on two boxes that take a two-digit head count and say then and now. Both faults were live when the check first ran — the stage-day boxes were sized for
five characters and accept 3650.99, and the manage table's 85% target had been sized by eye
for 999 in a box that takes 999.5 since the day it shipped.
Two rows were re-laid at the same time, because a snug control inside a stretched column just moves the empty space rather than removing it. The forecast's question row and the scenario's knobs now size each field to the wider of its label and its control and pack them left, which is what the dashboard's own control strip has always done.