Skip to content

ci: gate short-epoch hybrid sequencer activation - #16

Draft
geroldsteiner67 wants to merge 1 commit into
mainfrom
ci/hybrid-devnet1-smoke
Draft

geroldsteiner67 wants to merge 1 commit into
mainfrom
ci/hybrid-devnet1-smoke

Conversation

@geroldsteiner67

Copy link
Copy Markdown
Contributor

Summary

  • Replace the stale, 25-minute hybrid example test with an isolated two-block-epoch fixture that runs modal node run-hybrid.
  • Check mining, epoch-2 nominee selection, and Shoal loop startup with bounded waits; add the scenario to Rust CI.
  • Update the public implementation checklist with the exact scope of this solo-node proof.

Local validation

  • bash -n for both edited scripts
  • tests/network/10-hybrid-devnet1/test.sh: 6/6 passed (clean run, 29 seconds)
  • git diff --check

This does not prove multi-node propagation or public-testnet finality.

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant